Software Reviews

In-Depth Reviews of Top Solar Design Software

Expert-written reviews of 39+ solar design software tools. Detailed breakdowns of features, pricing, ease of use, and real-world performance.

Arka360
A

Arka360

solar design

Good for India-focused residential teams needing built-in CRM, but limited electrical engineering and missing commercial structures hold it back for multi-market EPCs.

3.5/10solar design
Read Review
Aurora Solar
A

Aurora Solar

solar design

Industry-leading AI roof modeling and sales proposals for US residential installers, but expensive, US-centric, and missing automated electrical engineering for commercial EPCs.

7/10solar design
Read Review
AutoCAD for Solar
A

AutoCAD for Solar

solar cad

AutoCAD is the industry-standard CAD platform adapted for solar through third-party plugins — unmatched for construction-document precision, but it requires manual SLD workflows (2–3 hours each), has no native shading or energy modeling, and costs $1,865–$3,120/year before plugins.

5/10solar cad
Read Review
BlueSol
B

BlueSol

solar simulation

Capable Windows desktop PV software with solid SLD generation and a low one-time price, but desktop-only architecture, European focus, and near-zero public user reviews make it a niche choice in 2026.

5/10solar simulation
Read Review
Enact Solar
E

Enact Solar

solar design

Strong all-in-one platform for international installers with a unique customer app, but limited electrical engineering, no carport support, and higher per-user pricing make it a hard sell for US-focused commercial EPCs.

6/10solar design
Read Review
Energy Toolbase
E

Energy Toolbase

solar finance

The strongest utility-rate and storage-economics engine sold to solar teams, and the vendor's own comparison table confirms it will not lay out a single panel. Budget for a second platform.

7/10solar finance
Read Review
ETAP
E

ETAP

solar design

ETAP is the strongest electrical power-system analysis platform for utility-scale solar grid studies, arc flash, and protection coordination — but it is not a solar design or proposal tool, and most installers and C&I EPCs will never justify its cost or learning curve.

7/10solar design
Read Review
GoSolo
G

GoSolo

solar proposal

Fast, accurate residential solar proposals with managed design — but residential-only scope, no electrical engineering, and per-proposal pricing that scales steeply make it a poor fit for commercial EPCs or growing teams.

6/10solar proposal
Read Review
HelioScope
H

HelioScope

solar simulation

Strong C&I simulation tool with DNV GL-validated accuracy and fast design iterations, but weak electrical engineering, a 15 MW cap, and a 10-project monthly limit make it a poor fit for high-volume EPCs.

7/10solar simulation
Read Review
Homer Energy
H

Homer Energy

solar finance

The industry standard for microgrid and off-grid hybrid system optimization — powerful simulation rigor with a steep learning curve, Windows-only constraint, and no native design tools.

7/10solar finance
Read Review
Lyra Solar
L

Lyra Solar

solar design

Fast, affordable residential permit package automation acquired by Aurora Solar in 2024 — ideal for small US installers, but limited to residential rooftop, US-only, and its standalone future is uncertain post-acquisition.

6/10solar design
Read Review
Nearmap
N

Nearmap

solar design

Nearmap is the gold standard for high-resolution aerial imagery in solar site assessment — 5.5–7.5 cm resolution beats any satellite source — but it is an imagery layer, not a design tool. Most installers get more value from design software that bundles Nearmap imagery than from a standalone subscription.

7/10solar design
Read Review
OpenSolar
O

OpenSolar

solar design

OpenSolar is the only major solar design platform that is genuinely free for residential and light commercial work, but U.S. users still need AutoCAD for SLD generation and the 500 kW design cap rules it out for utility-scale projects.

7/10solar design
Read Review
Photonik
P

Photonik

solar design

Solid free solar design tool for Australian residential installers, but beta status, missing electrical engineering, and residential-only scope make it unsuitable for commercial EPCs.

4/10solar design
Read Review
Pipe Solar
P

Pipe Solar

solar proposal

Pipe Solar is a fast, usage-based solar proposal and CRM platform built for residential installers — ideal for lower-volume teams avoiding monthly subscriptions, but too limited for commercial EPCs needing electrical engineering.

6/10solar proposal
Read Review
PV*SOL
P

PV*SOL

solar simulation

Engineering-grade solar simulation software with best-in-class hybrid system modeling, but desktop-only Windows architecture, no automated SLD generation, and a dated UI make it a poor fit for modern commercial EPCs.

6/10solar simulation
Read Review
PVCase
P

PVCase

solar cad

PVCase is the leading AutoCAD-based solar design platform for utility-scale developers, delivering 80–90% design time savings, but its desktop dependency, steep learning curve, and missing electrical automation make it a poor fit for commercial EPCs needing a complete workflow.

7/10solar cad
Read Review
PVComplete
P

PVComplete

solar cad

Strong AutoCAD-native engineering for utility-scale developers, but the four-product portfolio, AutoCAD dependency, and near-zero review presence make it a poor fit for cloud-first commercial EPCs.

6/10solar cad
Read Review
PVsyst
P

PVsyst

solar simulation

The bankability gold standard for utility-scale simulation — but Windows-only, simulation-only, and requiring 4–6 weeks to learn makes it a poor daily driver for commercial EPCs.

7/10solar simulation
Read Review
PVWatts
P

PVWatts

solar simulation

NREL's free government solar calculator is the best tool for quick preliminary estimates, but it has no design, electrical engineering, or proposal capabilities — making it insufficient for commercial EPCs.

6/10solar simulation
Read Review
Pylon
P

Pylon

solar design

Pylon (GetPylon) is the best pay-per-project solar design tool for Australian residential installers — but its limited electrical engineering and commercial depth make it a poor fit for EPCs handling projects above 100kW.

7/10solar design
Read Review
RatedPower
R

RatedPower

solar design

The best utility-scale solar design platform for teams running 5 MW+ projects — but it's expensive, opaque on pricing, and entirely wrong for commercial or residential work.

8/10solar design
Read Review
Revit for Solar
R

Revit for Solar

solar cad

A powerful BIM platform for architects doing building-integrated solar, but a poor fit for solar EPCs needing production calculations, SLD generation, and proposals — at $3,030+/year with a 6–12 month learning curve.

4/10solar cad
Read Review
SAM (System Advisor Model)
S

SAM (System Advisor Model)

solar simulation

SAM is the gold standard for free techno-economic simulation — NREL-backed, banker-accepted, and genuinely powerful — but it cannot design systems, generate SLDs, or produce proposals, so commercial EPCs need a separate design platform alongside it.

6/10solar simulation
Read Review
Scanifly
S

Scanifly

solar design

Scanifly is the best drone-first solar design platform for accuracy-sensitive projects, but its design-only scope means you'll need 3–4 additional tools to run a complete workflow.

7/10solar design
Read Review
SketchUp for Solar
S

SketchUp for Solar

solar cad

The best 3D visualization tool in solar design — but it requires Skelion Pro, PVsyst, and AutoCAD to function as a complete workflow, making it a multi-tool stack rather than standalone software.

6/10solar cad
Read Review
SMA Sunny Design
S

SMA Sunny Design

solar design

Sunny Design is the best free inverter-led PV design tool for installers working inside the SMA ecosystem — but its single-brand component logic, limited proposal output, and thin commercial workflow push multi-brand installers toward paid cloud alternatives.

7/10solar design
Read Review
Solar Design Tool
S

Solar Design Tool

solar design

Fast, affordable residential permit software with a proven 700,000+ design track record — but the platform has largely transitioned to Lyra Solar, leaving its long-term availability uncertain. Ideal for budget-conscious residential installers needing quick permit packages.

6/10solar design
Read Review
SolarAPP+
S

SolarAPP+

solar permitting

SolarAPP+ is the fastest, cheapest way to permit standard residential rooftop solar in the US — but it only covers a narrow slice of projects, depends entirely on local adoption, and does nothing for design, interconnection, or commercial work.

8/10solar permitting
Read Review
SolarEdge Designer
S

SolarEdge Designer

solar design

Free, DNV GL-validated solar design tool that works well for SolarEdge-exclusive residential installers — but hardware lock-in, no SLD generation, and limited shading analysis make it unsuitable for multi-brand or commercial work.

5/10solar design
Read Review
Solargraf
S

Solargraf

solar design

Fast proposals and clean Enphase integration for residential sales teams, but shading inaccuracies, permit revision rates, and project-credit pricing make it a poor fit for commercial EPCs or high-volume operations.

6/10solar design
Read Review
Solarius PV (ACCA)
S

Solarius PV (ACCA)

solar simulation

A capable BIM-integrated solar design tool built for European engineering workflows, but its Windows-only desktop architecture, IEC-only electrical standards, and steep learning curve limit its value for cloud-first teams and US commercial EPCs.

6/10solar simulation
Read Review
SolarMonkey
S

SolarMonkey

solar proposal

Fast, user-friendly solar proposal software built for European residential installers — strong for quick quotes and multi-product sales, but Europe-only coverage and no advanced engineering limit its appeal outside that niche.

6/10solar proposal
Read Review
SolarPlus
S

SolarPlus

solar design

Capable Australian solar design platform with best-in-class AS/NZS compliance and a unique Smart Energy Simulator, but limited international coverage and a kW-credit pricing model make it a poor fit for US/India EPCs.

6/10solar design
Read Review
SolarProof
S

SolarProof

solar proposal

A solid proposal tool for Australian residential installers needing compliance and speed, but the Australia-only focus and missing electrical engineering features limit its use for commercial EPCs and international operations.

6/10solar proposal
Read Review
SolarVis
S

SolarVis

solar design

A capable all-in-one platform for EMEA/MENA solar teams needing lead generation and 4-in-1 feasibility analysis, but limited social proof, no mobile app, and per-project pricing that scales quickly hold it back.

6/10solar design
Read Review
Sunbase Data
S

Sunbase Data

solar design

Strong all-in-one CRM for solar door-to-door sales teams, but lacks electrical engineering, advanced design tools, and pricing transparency — limiting its appeal beyond residential field operations.

6/10solar design
Read Review
Trace Software (Archelios)
T

Trace Software (Archelios)

solar simulation

Solid European simulation tool with strong BIM integration and a free tier for small projects, but limited public reviews, annual-only billing, and a European-first focus make it a niche pick outside France and its neighboring markets.

6/10solar simulation
Read Review
Virto Solar
V

Virto Solar

solar cad

A strong CAD-native tool for European utility-scale EPCs, but the AutoCAD dependency, steep learning curve, and ~$5,100/year total cost make it impractical for most commercial solar teams.

6/10solar cad
Read Review

Done Comparing? Try the One That Does It All.

SurgePV combines solar design, shade analysis, financial modeling, and proposals in one platform. See why thousands of solar professionals switched.

No credit card required · Full access · Cancel anytime

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.