Pros
Cons
TL;DR: Arka360 is a cloud-based solar design and proposal platform known for its built-in CRM, India market leadership, and pricing starting at $199/month. Based on 129 G2 reviews, users praise the integrated CRM and ease of use but report missing features (16 mentions), software performance issues (8 mentions), and system instability (6 mentions). For India-only operations needing built-in CRM, Arka360 delivers strong value. For multi-market EPCs (India + US) requiring complete electrical engineering and commercial structures, SurgePV — the leading solar design tools — offers superior capabilities with automated SLD generation, carport design, and international coverage.
Author: Keyur Rakholiya Title: Contributing Writer, SurgePV | MD & CEO, Heaven Green Energy Limited Expertise: 1+ GW solar projects delivered, 20+ design software platforms tested, 10+ years EPC operations Published: January 19, 2026 Last Updated: January 25, 2026 Review Methodology: Official Arka360 documentation, 129 G2 verified reviews (G2.com/products/arka360), comparison of published product information, India market expertise
Who This Review Is For
This complete Arka360 review helps:
- Solar EPCs evaluating Arka360 for India or US markets
- Installers considering all-in-one platforms with integrated CRM
- Commercial teams assessing electrical engineering capabilities
- Teams comparing Arka360 vs Aurora Solar, SurgePV, or OpenSolar
Who should skip this review:
- Pure residential sales teams (Aurora may be better)
- Utility-scale only operations (PVCase/RatedPower are more specialized)
- Teams with existing CRM already embedded in their workflow
What Is Arka360?
Arka360 is a cloud-based, made-for-solar platform combining CRM, design, proposals, shading analysis, and permit packages in one solution. Unlike Aurora Solar or SurgePV — which lack native CRM — Arka360 integrates lead management and sales pipeline tracking directly into the platform.
Company Background
| Detail | Info |
|---|---|
| Founded | 2017 by Siddharth Gangal |
| Headquarters | Allen, TX (US) + Bengaluru, India |
| Team Size | 32–51 employees |
| Funding | $134K across 3 rounds (Seed: iCreate, Zeroth Ai, IIT Mandi Catalyst) |
| Revenue | $767.2K (2024, per GetLatka) |
| Users | 5,000+ solar professionals across 27 countries |
| Market Recognition | Solar Power World’s “#1 Choice: Best Solar Design Software” (per G2 profile) |
Core Value Proposition
“Single integrated platform offering CRM, Design, Proposal, Shade Analysis, Site Surveys, Permit Packages in one simple to use and low cost package.”
This all-in-one approach differentiates Arka360 from competitors requiring multiple tools. Where Aurora users need separate CRM integrations (Salesforce, HubSpot), Arka360 provides everything natively.
Target Market
Primary Audiences:
- Solar EPCs (residential and commercial projects)
- Technical salespeople and engineers
- Solar contractors looking for all-in-one design and sales solution
Geographic Focus:
- Primary: India (strong local presence, India-specific features)
- Secondary: United States
- Coverage: India + US + International (limited)
Market Position: Positioned as “India’s #1 Solar Design & Proposal Tool for Professionals” with particularly strong presence in the Indian market due to local climate data integration and India-specific regulatory compliance.
Unique Positioning
Arka360 is the only platform among major competitors (Aurora, SurgePV, OpenSolar, PVCase) with native built-in CRM — eliminating the need for external CRM integrations or subscriptions.
Key Features & Capabilities
We analyzed Arka360’s features across 8 categories based on official documentation, 129 G2 reviews, and comparison of published product information against platforms like SurgePV.
Design Capabilities
AI-Powered 3D Design Studio
Arka360’s 3D design engine provides:
- AI-assisted roof detection automatically detecting roof geometry
- Optimized panel placement using intelligent algorithms
- Energy simulations completed within minutes
- Full 3D modeling accurate to the inch
- Advanced 3D LIDAR analysis for precise shading
- Smart autodetection of obstructions and trees
Residential & Commercial Support
The platform handles both project types:
- Accurate 3D modeling for residential and commercial installations
- Support for roof-mounted and ground-mounted systems
- Various mounting type configurations
User Feedback on Design
What users praise:
- 3D viewing (10 G2 mentions) — strong visualization capabilities
- 3D modeling (9 mentions) — quality design representation
- Ease of design (8 mentions) — intuitive workflow
What users criticize:
- Design issues (6 mentions) — some design-related problems
- Layout issues (6 mentions) — interface friction points
SurgePV Design Comparison
Both platforms offer strong 3D design capabilities. The key difference: SurgePV adds commercial structures Arka360 lacks — carports, trackers, and East-West racking.
- Standard rooftop residential/commercial: Both platforms perform well.
- Commercial structures (carports, trackers): Only SurgePV provides native support.
Electrical Engineering Features ⚠️ LIMITED
This is where Arka360 shows substantial limitations compared to complete electrical platforms.
Single Line Diagram (SLD) Generation
Available: ✅ Yes (but limited)
Capabilities:
- Automated SLD generation
- Export to AutoCAD via DXF file format
- Tables auto-update based on modules and inverters
- Download in PDF or export to Excel
Limitation: Arka360’s SLD capabilities are basic compared to complete electrical solutions. Users may still need AutoCAD for complex commercial electrical documentation.
Wire Size Calculator
Available: ✅ Yes
Capabilities:
- Integrated wire sizing based on US electrical calculations
- Tables represent input/output between electrical components
- Helps with SLD, 3LD, and permit drawing approvals
- Exportable to Excel or PDF
Limitation: Basic wire sizing without advanced features like voltage drop analysis or conduit fill calculations.
Real-World Electrical Workflow Comparison
100kW commercial rooftop project:
| Step | Arka360 | SurgePV |
|---|---|---|
| Design | 30 min | Combined with SLD |
| SLD creation | 2 hours (AutoCAD, manual) | 5–10 min (automated) |
| Proposal | 20 min | Included |
| Total time | 2.5–3 hours | 45 minutes |
| Additional tools | AutoCAD ($2,000/year) | None |
For commercial EPCs at scale (50 projects/month):
- Monthly time saved: 75–100 hours
- Annual productivity gain: 900–1,200 hours
- Labor value saved (at $75/hour): $67,500–$90,000/year
- Software cost saved: $2,000/year (no AutoCAD license)
Shading Analysis
Method: LIDAR-based shading analysis
- LIDAR mapping for accurate calculations
- Smart autodetection of obstructions and trees
- 8760-hour analysis (industry standard)
Accuracy:
| Platform | Disclosed Accuracy |
|---|---|
| Arka360 | Not quantified — no published ±% vs PVSyst |
| SurgePV | ±3% accuracy vs PVSyst (documented and proven) |
Why this matters: For bankable projects requiring financier approval, documented accuracy (“±3% vs PVSyst”) carries far more weight than unquantified claims.
CRM & Lead Management ⭐ MAJOR DIFFERENTIATOR
This is Arka360’s strongest competitive advantage.
Built-in CRM: ✅ Yes (Unlike Aurora, OpenSolar, SurgePV)
Capabilities:
- Made-for-solar CRM integrated directly into platform
- Multiple business dashboard configurations
- Track lead status and progression
- Custom dashboards with sorting, filtering, pipeline management
- Configurable for sales and admin accounts
- KPI widgets and graphs
CRM Competitive Gap
| Platform | Native CRM | External Integration Required |
|---|---|---|
| Arka360 | ✅ Built-in | None |
| Aurora | ❌ No | Salesforce, HubSpot ($$$) |
| SurgePV | ❌ No | Integrates with existing CRM |
| OpenSolar | ❌ No | External CRM needed |
When built-in CRM adds value: Small to mid-size installers without an existing CRM system.
When built-in CRM doesn’t matter: EPCs already using Salesforce, HubSpot, or Zoho — you’ll be paying for a feature you won’t use.
Energy Storage & NEM 3.0 Support ✅ AVAILABLE NOW
Battery Storage Modeling: ✅ Available
- Advanced energy storage simulations
- Model and analyze different storage scenarios
- Evaluate performance metrics and optimize storage configurations
- Energy and storage simulations for technical users
NEM 3.0 Support: ✅ Available
- Navigate California’s NEM 3.0 policy changes
- Maximize financial benefits of grid export
- Storage integration modeling for project viability
Competitive Comparison
| Platform | Storage Support |
|---|---|
| Arka360 | ✅ Available now |
| SurgePV | Planned (not yet available) |
| Aurora | ✅ Available (established) |
Current advantage: Arka360 and Aurora for storage-focused or California NEM 3.0 projects.
Proposal Generation
Sales Mode: Unique Feature
Create instant designs while interacting with clients in real time — a differentiated capability compared to traditional design-then-propose workflows.
Proposal Builder
Speed: Generate accurate solar proposals in under 5 minutes.
Features:
- AI-powered proposal automation
- Data auto-synced from design layout
- Customized proposals with brand logos, pricing, incentives, and financing
- Interactive web-based proposals
Output formats: PDF, shareable web links, direct email delivery
Financial Models Supported:
- Cash purchase
- Loans
- RESCO (Renewable Energy Service Company)
- CAPEX models
- Leases
- PPAs (Power Purchase Agreements)
SurgePV Proposal Comparison
Both platforms offer strong proposal capabilities.
- Arka360 advantage: Real-time Sales Mode for live client interaction
- SurgePV advantage: Proposals backed by complete electrical documentation
Permit Packages & Export Formats
Permit services available:
- Complete permit package generation
- AHJ-compliant solar permit services
- PE stamp services (separate pricing)
- Pre-made permit bundles
Export formats:
- PDF: Proposals and documentation
- DXF: CAD layout exports
- SketchUp: 3D model exports (zip)
- .3ds: PVSyst integration (Ground and Subarrays)
- Excel: Wire size calculator data
Integrations & API
CRM Integrations: Salesforce, HubSpot CRM, HubSpot Customer Platform, Zoho CRM
Other Integrations: GoHighLevel, Nearmap, PVsyst, SketchUp
API Availability: ⚠️ Conflicting information — SourceForge lists API as available; SoftwareFinder states “does not offer API.” Verify directly with Arka360 before building integrations.
Pricing & Plans
Pricing Tiers
| Plan | Monthly | Annual | Target User |
|---|---|---|---|
| Basic | $199/month | $1,699/year | Solo designers, small installers |
| Premium | $358/month | $1,999/year | Growing teams, more features |
| Enterprise | Custom | Contact sales | Large EPCs, advanced needs |
- Annual billing saves 15–17% over monthly billing
- Free trial available (request demo)
- India pricing: ₹7,500–₹16,500/month + GST (visit official website)
Total Cost of Ownership (TCO)
| Platform | Annual Cost | Notes |
|---|---|---|
| Arka360 Basic | $1,699/year | Annual billing |
| Arka360 Premium | $1,999/year | Annual billing |
| SurgePV (3 users) | $1,499/user/year | All features, no AutoCAD needed |
| Aurora + AutoCAD | ~$6,800/year | Estimated |
| OpenSolar | $2,388/year | $199/month × 12 |
Net savings with SurgePV vs Arka360 Premium + AutoCAD: $2,500/year per user ($3,999 vs $1,499)
Net savings with SurgePV vs Aurora + AutoCAD: $5,301/year per user ($6,800 vs $1,499)
See SurgePV transparent pricing for full details.
Hidden Costs (Not Disclosed by Arka360)
- Implementation fees: Unknown
- Training costs: Unknown
- Premium support tiers: Unknown
- PE stamp services: Separate pricing (not disclosed)
- Feature gating between tiers: Not fully documented
Recommendation: Request a detailed quote from Arka360 to understand true TCO including hidden fees and tier feature restrictions.
User Reviews & Feedback
We analyzed 129 verified G2 reviews (as of January 2026) to understand real user experiences.
Top Praised Features
| Rank | Feature | G2 Mentions |
|---|---|---|
| 1 | Ease of use | 21 |
| 2 | Customer support | 11 |
| 3 | 3D viewing | 10 |
| 4 | 3D modeling | 9 |
| 5 | Ease of design | 8 |
Top Criticisms
| Rank | Issue | G2 Mentions | Severity |
|---|---|---|---|
| 1 | Missing features | 16 | ⚠️ CRITICAL |
| 2 | Software performance | 8 | High |
| 3 | System instability | 6 | High |
| 4 | Layout issues | 6 | Medium |
| 5 | Design issues | 6 | Medium |
Sentiment Summary
Overall: Mixed
Pattern observed: Arka360 excels for straightforward residential projects with CRM needs. Users hit limitations on complex commercial projects requiring advanced features.
Pros & Cons
✅ Pros
1. Built-in CRM Integration ⭐ UNIQUE ADVANTAGE
Only major solar software platform with native made-for-solar CRM. Eliminates need for Salesforce or HubSpot for teams without existing CRM.
2. India Market Leadership
Strong local presence with India-specific climate data, regulations, and local support. #1 positioning in India market.
3. Competitive Pricing
Transparent, affordable pricing tiers. Basic at $199/month ($1,699/year annual) is accessible for solo designers and startups.
4. All-in-One Platform
CRM + Design + Proposals + Permit Packages in a single solution reduces tool-switching and streamlines workflow from lead to close.
5. Energy Storage & NEM 3.0 (Available Now)
Immediate support for battery storage modeling and California NEM 3.0 — an advantage over SurgePV where storage is still planned.
6. Ease of Use
Top-rated for ease of use (21 G2 mentions). Intuitive interface with a gentler learning curve than Aurora or PVCase.
7. Customer Support Quality
Highly praised responsive support (11 G2 mentions). Critical for teams without dedicated IT expertise.
8. 3D Design & LIDAR Shading
AI-powered 3D modeling and LIDAR-based shading deliver professional design quality for client presentations.
⚠️ Cons
1. Missing Features ⚠️ CRITICAL (16 G2 mentions)
Most frequently cited criticism. Users find capabilities Arka360 doesn’t provide — likely advanced electrical engineering, carport/tracker design, and simulation depth.
2. Limited Electrical Engineering
Basic SLD requiring manual configuration. Complex commercial electrical may require AutoCAD ($2,000/year extra). SurgePV automates complete SLD in 5–10 minutes with no external tools.
3. Software Performance Issues (8 G2 mentions)
Slow loading times, system lag during complex designs, and processing delays reported by users.
4. System Instability (6 G2 mentions)
Unexpected crashes and data loss risks reported. Risk to project timelines and data integrity.
5. No Commercial Structures
Cannot design carports, solar trackers (single-axis, dual-axis), or East-West racking. Limits addressable commercial project types.
6. Accuracy Not Quantified
No published ±% variance vs PVSyst. Unquantified accuracy claims may not satisfy financier requirements for bankable projects.
7. Limited International Coverage
Primarily India + US. Not suited for EPCs operating across multiple countries without investing in additional tools.
8. API Availability Unclear
Conflicting sources on API availability. Verify directly with Arka360 before building any custom integrations.
Design Solar Projects Faster with SurgePV
See how SurgePV compares to Arka 360 with a live walkthrough of your own project.
Book a DemoNo commitment required · 20 minutes · Live project walkthrough
Arka360 vs SurgePV
Both Arka360 and SurgePV target commercial EPCs and installers, but with different strengths. Here’s an honest, feature-by-feature comparison.
Head-to-Head Feature Comparison
| Category | Arka360 | SurgePV | Winner |
|---|---|---|---|
| Electrical Engineering | Limited (basic SLD, wire sizing) | Complete (automated SLD, voltage drop, conduit fill) | SurgePV |
| CRM Integration | ✅ Built-in native CRM | ❌ Integrates with external CRM | Arka360 |
| Commercial Structures | ❌ No carports, trackers, East-West | ✅ Carports, trackers, East-West | SurgePV |
| Energy Storage | ✅ Available now (NEM 3.0) | Planned | Arka360 |
| Geographic Coverage | India + US (limited international) | India + US + International | SurgePV |
| Pricing | $1,699–$1,999/year | From $1,499/user/year (all-inclusive) | SurgePV |
| Shading Accuracy | Not quantified | ±3% vs PVSyst (documented) | SurgePV |
| Learning Curve | Easy (21 G2 mentions) | 2–3 weeks (moderate) | Arka360 |
| Support | Highly praised (11 G2 mentions) | 3-min average response | Tie |
Electrical Engineering — Critical Differentiator
Arka360:
- Basic SLD (requires manual configuration)
- Wire sizing calculator
- May need AutoCAD for complex electrical
SurgePV:
- Automated complete SLD in 5–10 minutes
- Advanced wire sizing + voltage drop + conduit fill calculations
- NEC Article 690 compliant, permit-ready output
- NO AutoCAD required — saves $2,000/year
At scale (50 commercial projects/month):
- Monthly time saved: 75–100 hours
- Annual labor value saved (at $75/hour): $67,500–$90,000
CRM — Arka360 Advantage
If you don’t have a CRM: Arka360’s built-in solution adds genuine value. No separate subscription, no integration complexity.
If you already have Salesforce or HubSpot: You’re paying for a redundant feature you won’t use. SurgePV integrates with your existing CRM investment.
Commercial Structures — SurgePV Advantage
Arka360 does not support:
- ❌ Carport solar design (parking lot canopies)
- ❌ Solar trackers (single-axis, dual-axis)
- ❌ East-West racking optimization
SurgePV supports:
- ✅ Carport solar design (only platform with native support)
- ✅ Solar trackers with backtracking
- ✅ East-West racking optimization (20–40% higher kW density per roof area)
Market reality: Carport solar is the fastest-growing commercial segment. Trackers increase production 15–35%. If you design these types — or want to — Arka360 cannot handle them natively.
Pricing & TCO — Full Comparison
| Scenario | Annual Cost |
|---|---|
| Arka360 Premium (annual) | $1,999/year |
| Arka360 Premium + AutoCAD | $3,999/year per user |
| SurgePV (3 Users, all-inclusive) | $1,499/user/year |
| Aurora + AutoCAD | ~$6,800/year |
Net savings: SurgePV vs Arka360 Premium + AutoCAD: $2,500/year per user Net savings: SurgePV vs Aurora + AutoCAD: $5,301/year per user
Best Arka360 Alternatives in 2026
Arka360 is the strongest option for India-focused residential teams that need built-in CRM and local compliance support without paying for capabilities they’ll never use.
But there are three situations where it reaches its limits fast.
Situation 1: You’re scaling beyond India. Arka360’s utility data, regulatory support, and imagery coverage are built for India and US residential. Teams expanding into Europe, Southeast Asia, or the Middle East will hit consistent gaps.
Situation 2: You’re doing commercial work. No carport support. No tracker design. Limited SLD generation for complex permit packages. The moment your projects grow beyond standard residential rooftop, Arka360’s capabilities run out.
Situation 3: You need simulation credibility for project finance. Arka360’s shading accuracy is not independently published or third-party validated — a gap that matters when a lender or investor is reviewing your energy yield numbers.
If any of those situations apply, here’s where to look.
SurgePV — Multi-Market, Full Commercial, No Caps
The most direct upgrade path for Arka360 teams expanding beyond India residential. SurgePV covers India, US, and 50+ international markets with the same platform — no configuration changes, no separate subscription.
Where the difference shows immediately: automated SLD generation that Arka360 requires AutoCAD to complete, native carport and tracker design that Arka360 doesn’t support, and documented ±3% simulation accuracy that lenders and investors can reference.
For teams doing multi-market work or growing into commercial project types, the cost of maintaining Arka360 as a one-market, one-project-type tool compounds faster than the subscription savings justify. SurgePV’s pricing starts at $1,899/year for 3 users — comparable to Arka360 Premium at $1,999/year, with significantly wider coverage.
→ Compare SurgePV and Arka360 features side by side
Aurora Solar — US Residential Accuracy and Proposal Polish
For teams with significant US residential volume, Aurora Solar’s LiDAR roof modelling and proposal quality outperforms Arka360 for that specific workflow. Published G2 case studies show close rate improvements from 30% to 65% attributed to Aurora’s proposal tools. The trade-off is price ($2,640–$6,000+/user/year) and a US-centric feature set that adds cost without adding relevant capability for pure India operations. See the full Aurora Solar review.
OpenSolar — Free Entry-Level With Global Reach
OpenSolar is free, covers 185 countries, and includes CRM-adjacent tools for lead and proposal management. For India-based teams that need to reduce software spend without losing basic design and proposal capability, OpenSolar is the most accessible alternative. The gaps vs Arka360: no built-in CRM pipeline management, no India-specific regulatory data, and no offline capability.
HelioScope — When Simulation Credibility Matters for Finance
If your projects require bankable energy yield figures for lenders or investors, HelioScope’s DNV GL validation and Sunstone Credit recognition provide a level of simulation credibility that Arka360’s undocumented accuracy cannot match. Simulation-only, no proposals, no CRM — but for EPCs working on financeable commercial projects, it often runs alongside a proposal tool rather than replacing one. See the full HelioScope review.
See the full best solar design software guide for a complete comparison across 12 platforms.
Who Should Choose Arka360?
✅ Best Fit for Arka360
1. India-Only Operations Solar EPCs operating exclusively in India. Arka360’s #1 market positioning, India-specific climate data, local regulatory compliance, and local support infrastructure make it the strongest option for pure India operations.
2. Teams Needing Built-in CRM Small to mid-size installers without existing CRM investments. The integrated lead management and sales pipeline eliminates a separate CRM subscription.
3. Budget-Conscious Startups New solar companies or solo designers. Basic tier at $199/month ($1,699/year annual) is accessible without sacrificing core design and proposal capabilities.
4. Residential-Focused Teams Installers primarily designing residential rooftop systems (80%+ of portfolio). Sales Mode for real-time client interaction is particularly valuable here.
5. Teams Needing Immediate Storage Support California-focused installers and teams designing battery storage now. Arka360’s energy storage modeling and NEM 3.0 support are available today.
Who Should Choose SurgePV?
✅ Best Fit for SurgePV
1. Multi-Market EPCs (India + US) Solar EPCs operating across multiple regions. SurgePV covers India + US + International with 3,000+ US utilities and equal market focus.
2. Commercial EPCs Needing Complete Electrical Teams designing commercial projects requiring permit-ready electrical documentation. Automated SLD saves 1.5–2.5 hours per project and eliminates AutoCAD ($2,000/year).
3. Teams Designing Commercial Structures EPCs designing carport solar, solar trackers, or East-West racking. SurgePV is the only platform with native carport design support.
4. EPCs with Existing CRM Systems Teams already using Salesforce, HubSpot, or Zoho. SurgePV integrates rather than duplicating your CRM investment.
5. Teams Valuing Transparent Pricing Decision-makers wanting predictable, all-inclusive costs. SurgePV transparent pricing starts at $1,899/year for 3 users with no feature gating.
6. Bankable Project Focus EPCs working on projects requiring financier approval. SurgePV’s documented ±3% accuracy vs PVSyst provides the validation financiers and investors expect.
Frequently Asked Questions
How much does Arka360 cost?
Arka360 offers three pricing tiers:
- Basic: $199/month ($1,699/year with annual billing)
- Premium: $358/month ($1,999/year with annual billing)
- Enterprise: Custom pricing (contact sales)
Free trial available (request demo). Annual billing offers 15–17% discount.
India pricing: ₹7,500–₹16,500/month + GST. Visit the official Arka360 website for India-specific plans.
Total cost comparison:
- Arka360 Premium: $1,999/year (mid-tier, annual billing)
- SurgePV (3 Users): $1,499/user/year (all features, complete electrical engineering)
- Aurora + AutoCAD: ~$6,800/year
Does Arka360 have electrical engineering capabilities?
Yes, but limited.
Arka360 offers:
- ✅ Basic SLD generation (requires manual configuration)
- ✅ Wire sizing calculator (US electrical calculations)
- ⚠️ Limited compared to complete electrical platforms
Complex commercial electrical documentation may still require AutoCAD.
SurgePV comparison:
- Automated complete SLD in 5–10 minutes
- Advanced wire sizing + voltage drop + conduit fill
- NO AutoCAD required — saves $2,000/year and 1.5–2.5 hours per project
Can Arka360 design carport solar or trackers?
No.
Arka360 does NOT support:
- ❌ Carport solar design (parking lot canopies)
- ❌ Solar trackers (single-axis, dual-axis)
- ❌ East-West racking optimization
It is limited to standard rooftop and ground-mount systems.
SurgePV:
- ✅ Carport solar design (only platform with native support)
- ✅ Solar trackers (single-axis, dual-axis)
- ✅ East-West racking
Is Arka360 better than Aurora Solar?
Depends on your specific needs.
Arka360 advantages over Aurora:
- ✅ Built-in CRM (Aurora lacks native CRM)
- ✅ More transparent pricing (public tiers vs contact sales)
- ✅ Easier learning curve
Aurora advantages over Arka360:
- ✅ More established brand
- ✅ Better for pure residential sales
- ✅ More polished UI and proposals
SurgePV advantage: Better than both for commercial EPCs needing complete electrical engineering, commercial structures, and transparent all-inclusive pricing. See the Aurora Solar review for detailed comparison.
Does Arka360 work in the United States?
Yes, but India is its primary market.
Arka360 US capabilities:
- ✅ US coverage available
- ✅ NEM 3.0 support (California)
- ✅ US electrical calculations (wire sizing)
- ⚠️ India is the primary market focus
SurgePV US coverage:
- All 50 states supported
- 3,000+ US utilities
- NEC Article 690 compliance
- Equal India and US focus
How does Arka360 handle energy storage and NEM 3.0?
Arka360 has immediate storage support.
Available now:
- ✅ Battery storage modeling
- ✅ NEM 3.0 California support
- ✅ Energy and storage simulations
- ✅ Storage financial analysis
SurgePV storage status: Planned (not yet available).
For California projects and storage-focused teams: Arka360 provides immediate support. This is a genuine Arka360 advantage while SurgePV’s storage feature is in development.
What do users say about Arka360? (G2 Reviews)
Based on 129 verified G2 reviews:
Most praised (Top 5):
- Ease of use (21 mentions)
- Customer support (11 mentions)
- 3D viewing (10 mentions)
- 3D modeling (9 mentions)
- Ease of design (8 mentions)
Most criticized (Top 5):
- Missing features (16 mentions) ⚠️ CRITICAL
- Software performance (8 mentions)
- System instability (6 mentions)
- Layout issues (6 mentions)
- Design issues (6 mentions)
Overall sentiment: Mixed. Users love ease of use and support but report substantial feature gaps and performance issues.
Can I switch from Arka360 to SurgePV?
Yes. Migration path:
What transfers easily:
- Project data (export from Arka360)
- Module/inverter selections
- Customer information
What requires recreation:
- Electrical SLD (SurgePV generates automatically — actually faster)
- Design customizations
- Proposal templates
Migration timeline: 2–3 weeks (SurgePV onboarding + team training)
Consider before switching:
- If using Arka360 CRM heavily, you’ll need a separate CRM solution
- If storage modeling is critical, wait for SurgePV storage release
- If India-only market, evaluate whether multi-market coverage is needed
When switching makes sense:
- Need complete electrical engineering (eliminate AutoCAD)
- Expanding to commercial structures (carports, trackers)
- Multi-market operations (India + US + international)
- Hitting consistent feature limitations with Arka360
Is Arka360’s accuracy good enough for bankable projects?
Unknown — accuracy is not quantified.
Arka360:
- Claims “accurate” shading and production analysis
- No published ±% variance data
- No PVSyst validation disclosed
- No independent verification
SurgePV:
- ±3% accuracy vs PVSyst (documented and proven)
- 8760-hour shading analysis
- Validation methodology disclosed
For bankable projects: Documented accuracy provides confidence to financiers and investors. Arka360’s unquantified claims may require additional independent validation from lenders.
Final Verdict
Arka360 Executive Summary
Strengths:
- ✅ Built-in CRM (unique among major platforms)
- ✅ India market leadership
- ✅ Competitive pricing ($199/month Basic, $1,699/year annual)
- ✅ Easy to use (21 G2 mentions)
- ✅ Energy storage support (available now)
- ✅ All-in-one platform approach
Limitations:
- ⚠️ Missing features (16 G2 mentions — most critical issue)
- ⚠️ Limited electrical engineering (may need AutoCAD for commercial)
- ⚠️ Software performance issues (8 G2 mentions)
- ⚠️ System instability (6 G2 mentions)
- ⚠️ No commercial structures (carports, trackers, East-West)
- ⚠️ Accuracy not quantified (no ±% vs PVSyst)
The Decision Framework
Choose Arka360 when:
- 100% India market focus + No existing CRM + Budget-conscious ($1,699–$1,999/year annual)
- Residential project majority (80%+) + Need storage modeling now
Choose SurgePV when:
- Multi-market (India + US + international) + Commercial electrical needs + Commercial structures + Bankable project requirements
Value Analysis
Arka360 provides measurable value for India-focused installers needing affordable, integrated CRM and design capabilities. The built-in CRM eliminates a separate subscription cost — a genuine advantage for teams without existing CRM systems.
For commercial EPCs requiring complete electrical engineering, the calculation shifts. Arka360’s limited electrical capabilities may require AutoCAD for complex commercial documentation, adding $2,000/year in software costs and 1.5–2.5 hours per project in manual work.
Total Cost Comparison (annual):
| Option | Software | AutoCAD | Manual Electrical Work | Total |
|---|---|---|---|---|
| Arka360 Premium + AutoCAD | $1,999 | $2,000 | ~$7,500 (100 hrs × $75) | ~$11,499 |
| SurgePV all-inclusive (3 Users) | $1,499/user | $0 | $0 | $1,499/user |
Net annual savings with SurgePV: ~$10,000/year per designer
Take the Next Step
See how SurgePV’s complete electrical engineering and commercial structures support compare to Arka360.
- Book a demo — See SurgePV in action with your project types
- Compare platforms — Detailed platform comparisons
- Pricing calculator — Calculate your ROI and savings
- Best solar design software — Complete platform comparison guide
Switching from Arka360? SurgePV provides dedicated migration support, training, and onboarding for a smooth transition.
Related Resources
Platform Comparisons:
- Aurora Solar Review — Aurora Solar detailed analysis and comparison
- Best Solar Design Software — Complete platform comparison guide
Feature Deep Dives:
- Solar Designing — Complete design capabilities overview
- Commercial Solar Solutions — Commercial project features
- Solar Proposals — Proposal generation guide
- Voltage Drop Calculator — Free electrical calculation tool
- Best Solar Proposal Software — Proposal software comparison
Educational Resources:
- Solar Design Guide — Comprehensive solar design software guide
- Best Solar Software for India — India market software guide
- Solar Shading Analysis Software — Shading tools comparison
- Best Solar Design Software Guide — 12 tools compared for installers
This Arka360 review was written by Keyur Rakholiya, Contributing Writer at SurgePV and MD & CEO of Heaven Green Energy Limited, using the cited public sources. All claims about SurgePV are verified against official product documentation. All Arka360 information is sourced from official documentation (arka360.com) and 129 verified G2 user reviews (G2.com/products/arka360). We disclose that SurgePV publishes this review and disclose our company affiliation transparently.
Review last updated: January 25, 2026 | Next review: April 2026
About the Contributors

Solar-industry contributor
Nimesh Katariya contributes to SurgePV content concerning solar project workflows. This profile intentionally does not assert certifications, project totals, seminar counts, or technical-review authority without retained verification evidence.

Editorial contributor · SurgePV
Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.
