About SurgePV
Built by Solar Professionals,
for Solar Professionals
We combine a decade of real-world solar project experience with modern software engineering to build the solar software we always wished existed - and the industry always needed.
Our Story
Born from the frustration of juggling five different tools
Before building SurgePV, our founding team spent years designing and delivering real solar projects globally - through Heaven Designs, an award-winning solar engineering company based in India with 50+ engineers, trusted by EPC firms across India, Europe, and the US. Every project meant switching between a design tool, a simulation engine, a CAD program for electrical drawings, a spreadsheet for financials, and a presentation tool for proposals.
Five tools. Five licenses. Five sets of manual data entry. Every project took hours longer than it should have.
We built SurgePV to solve our own problem: one solar design software that handles the entire project lifecycle - from satellite-based roof measurement to client-ready proposals with accurate financials.
Today, solar professionals worldwide use SurgePV to design, simulate, engineer, and propose - all without leaving the platform.
2020
Heaven Designs Founded
Keyur Rakholiya, founder of Heaven Designs - an award-winning solar engineering company with 50+ engineers - experiences the tool fragmentation problem firsthand across hundreds of real EPC projects globally.
2024
Idea Takes Shape
After evaluating every solar software on the market, the team decides to build the all-in-one platform they needed.
Early 2025
SurgePV Launches
First version goes live with solar design, shadow analysis, and proposal generation. Early adopters across multiple markets, backed by the engineering rigour of real project delivery.
Mid 2025
Serving Solar Teams Across Europe
European installers start using SurgePV with local regulations and tariff structures built in. Financial modelling and Clara AI launch, giving teams faster project turnaround.
2026
Platform Expansion
SurgePV expands its platform and geographic coverage, and launches native SLD generation, permit packages, and utility-scale design.
Our Mission
To give every solar professional on the planet access to world-class design, engineering, and proposal tools - built from real project experience, not assumptions.
We believe the solar industry shouldn't need five subscriptions to do one job. One platform, one workflow, one price.
Our Vision
A world where every solar project - residential, commercial, or utility-scale - can be designed, engineered, and proposed in under an hour, by anyone, from anywhere.
As solar technology evolves, so do we. We ship weekly, listen to customers daily, and always put real-world usability over feature bloat.
Our Values
What we stand for
These aren't just words on a wall. They shape every product decision, every customer interaction, and every line of code we write.
Trust First
Your data, your designs, your clients. We earn trust through transparency, uptime, and honest pricing. No hidden fees, no feature-gating, no lock-in.
Built With Installers
Every feature is shaped by real solar project experience. Our founding team has delivered hundreds of megawatts of projects globally - we don't build in a vacuum, we build from the field.
Speed Wins Deals
In solar sales, the first accurate proposal wins. We obsess over both speed and precision - from design to proposal in 30 minutes, with the engineering accuracy that closes deals.
Global by Default
Solar is a global industry. SurgePV supports multi-currency, multi-region incentives, and international electrical standards from day one - not as an afterthought.
All-in-One, Always
Every plan includes every feature. No tiered pricing, no add-on modules, no "contact sales for SLD generation." You get everything.
Listen, Then Ship
We ship updates weekly based on direct feedback from solar teams in the field. Our roadmap is driven by real customer needs, not investor trends.
Our Platform
Five products. One platform.
Everything a solar professional needs, from first measurement to signed proposal.
Solar Designing
AI-powered panel layout with satellite imagery and auto-stringing.
Shadow Analysis
8760-hour shade simulation with monthly irradiance maps.
Generation & Financial
Energy yield, ROI, NPV, payback with multi-currency support.
Solar Proposals
Branded web + PDF proposals with P50/P75/P90 estimates.
ClaraAI
AI co-pilot for auto-design, code lookup, and troubleshooting.
Global Presence
Where we work
Four offices across two continents, serving solar professionals across multiple markets.
London, United Kingdom
Headquarters
Global headquarters, strategy, and business operations.
Ahmedabad, India
Engineering
Core product engineering, AI development, and customer success operations.
Cologne, Germany
Europe West
European market operations, partnerships, and regulatory compliance for EU markets.
Leeuwarden, Netherlands
Europe North
Benelux and Nordic market coverage, solar design consulting, and field testing.
Who We Serve
Built for every type of solar professional
Solar Installers
Design accurate systems, generate permit-ready packages, and close deals faster with same-day proposals.
Sales Professionals
Create stunning, branded proposals with accurate financial projections that help homeowners say yes.
Channel Partners & OEMs
White-label SurgePV's platform to offer your dealer network a branded design and proposal experience.
Residential Solar
From roof measurement to signed contract, handle every residential project in a few minutes.
Commercial Solar
Design systems up to 5MW with detailed financial modeling, SLDs, and client-ready engineering packages.
EPCs & Developers
Manage large project portfolios with team collaboration, version control, and centralized reporting.
Get in Touch
We'd love to hear from you
Whether you're exploring SurgePV for the first time or want to discuss enterprise deployment, our team is ready to help.
Headquarters
Apartment 15, Sugar House Lane, Sugar House Island, Stratford, London, E15 2ZQ, United Kingdom
Book a personalized demo
See how SurgePV can streamline your solar workflow. Our team will walk you through the platform and answer all your questions.
- 30-minute live walkthrough
- Tailored to your project types
- No credit card required
- Free trial included
Ready to simplify your solar workflow?
Join solar professionals worldwide who trust SurgePV to design accurately, propose confidently, and close deals faster - all in one platform.
No credit card required · Full access · Cancel anytime


