Solar Design & Proposal Software

Design and Propose Solar Projects with Numbers You Can Stand Behind.

From 3D modeling, electrical design, and shading to generation, financials, proposals, and lead management, bring your entire solar workflow together in one place with the accuracy and confidence to stand behind every project.

Book a demo
0:00 / 0:00

From Idea To Install - Every Step In One Platform.

Site assessment, roof modeling, mounting structures, panel layout, electrical design, energy simulation, storage, financial analysis, and client proposal - SurgePV handles the full workflow so your team doesn't have to switch tools.

AI-assisted roof modeling

Auto-generate precise 3D roof models from satellite imagery. Handles dormers, pitched roofs, and complex geometries. Share an address - SurgePV does the rest.

Explore solar design software

Financial Modeling With Scenario-Based Yield Forecasts

Model CAPEX, LCOE, NPV, IRR, and payback periods in one workflow. Present P50/P75/P90 scenarios with documented assumptions for project-specific review.

Explore financial modeling
Engineering

Electrical Design and Documentation,
Generated From the Design

String your array against inverter limits and NEC or IEC voltage rules. Size conductors for your region. Generate the single-line diagram and export it to PDF or DXF — without redrawing anything in AutoCAD.

This is the part most solar software leaves to a CAD package and a spreadsheet. Doing it in the same file as the design is what keeps the drawing, the cable schedule and the bill of materials agreeing with each other.

Clara AI understands your solar business from the inside out.

It reads project data, flags risks before they cost you, and surfaces the next best action for every deal in your pipeline. No prompts needed - Clara watches the signals your team misses.

Explore Clara AIClara AI assistant analyzing solar project data

So your team stops guessing and starts closing.

Clara turns raw project complexity into clear next steps - prioritized follow-ups, accurate forecasts, and proposals that match what the customer actually needs. Every team member moves faster because the thinking is already done.

Book Free DemoClara AI copilot guiding solar sales workflow

AI-Powered Solar Design for Complex Roofs, Dormers & Commercial Sites

Move from roof geometry and array layout to a reviewed design. Inspect the site inputs and output before using it in engineering or permitting.

Smart Designing

AI-powered 3D design, auto module placement, and real-time shading analysis - all in one workflow. SurgePV supports complex-roof workflows and keeps layout and energy-model assumptions connected for review.

SurgePV solar panel layout design tool with 3D roof modeling and automated module placement
01

AI Roof Modeling

Create and edit 3D roof models from available imagery and project inputs, including dormers, pitched roofs, and multi-plane geometry. Verify dimensions before engineering use.

02

Advanced Mapping

Choose from Google, Esri, or Nearmap providers for accurate site assessments - ensuring every panel placement is based on real-world data.

03

Shading Analysis

Solar shadow analysis shows exactly where shading affects performance - before you ever visit the site.

See all solar design software features

Energy Optimization

Irradiance mapping, loss analysis, and performance modeling in one workflow. Evaluate expected production before your client signs with P50/P75/P90 scenario reports; actual results and external acceptance remain project-specific.

SurgePV energy yield optimization dashboard with P50 P90 simulation results and financial analysis
01

Irradiance Mapping

Assess site-specific solar potential with real-world irradiance data to maximize energy yield before a single panel is installed.

02

Module Placement

Automate or manually fine-tune panel layouts on flat, pitched, or shed roofs - the system finds the optimal configuration.

03

Loss Analysis

Pinpoint every source of system inefficiency - shading, wiring, inverter clipping - so you can fix it in the design, not after install.

See generation & financial tools

Boost Sales

Custom solar proposal software with branded templates and multilingual support. Close more deals with proposals that speak your client's language - literally.

Solar proposal software with multilingual support
01

Bilingual Proposal Options

Generate proposals in two languages so every stakeholder can review the project in their preferred language.

02

Consumption Profiling

Compare pre- and post-solar consumption profiles using real-world data to showcase savings and ROI clearly.

03

Flexible Financing

Offer customized financing options like PPAs, leases, or loans to make solar adoption more accessible for clients.

See proposal features

Streamline Your Tools and Save Costs.

Stop paying for five tools that don't talk to each other. SurgePV replaces your solar design software, simulation engine, proposal tool, and financial spreadsheets - one platform, one price.

Built for Every Solar Workflow

Whether you're designing projects, closing deals, or managing a solar network - SurgePV is built for your workflow.

For Solar Installers

Review roof geometry, obstructions, and panel placement in a single project workflow. Confirm site details and obtain the professional review required for your project.

  • AI-powered roof modeling - auto-generate 3D layouts instantly
  • Shading & performance analysis with real-world simulations
  • Automated BOM & SLD generation in one click
Solar design tools for installers

For Sales Professionals

Transform technical designs into data-backed proposals that close faster. Show clients exactly what they'll save before they sign.

  • Branded, interactive proposals - customizable and easy to understand
  • Savings breakdowns, tariffs, and payback periods built in
  • Multilingual proposals to expand into new markets
Solar proposal tools for sales teams

For OEMs & Channel Managers

Scale your solar network with custom integrations, real-time project tracking, and full visibility from design to installation.

  • Custom features & API integrations tailored to your workflows
  • Project oversight from design through to installation
  • Site-information checks to support design review and identify missing inputs
Channel management platform for OEMs

Built For Solar Teams
Who Move Fast

From lead capture to layout design, proposals to signed approvals - SurgePV simplifies every step so your team can focus on delivering projects, not managing software.

Evidence-first evaluation

Don't Take Our Word For it. See What Our Clients Say.

SurgePV does not publish customer names, quotations, or performance outcomes without retained consent and substantiation. Use a representative project during a guided demonstration and validate workflow, outputs, assumptions, and fit against your own requirements.

What is SurgePV?

SurgePV is an AI-powered solar design software that lets installers and EPCs model roofs, analyze shading, generate financial projections, and create client proposals in a single cloud platform. It replaces four or more disconnected tools with one integrated workflow.

Is SurgePV right for my solar business?

SurgePV is built for solar installers, EPCs, designers, and sales teams working across residential and commercial project workflows. Confirm system-size, structure, data, and output requirements with a representative project during the demo.

What is the best solar design software for EPCs?

An EPC should evaluate solar design software against its own roof, electrical, yield, financial, handoff, and approval requirements. SurgePV connects those workflows, but does not promise a universal time saving or third-party acceptance.

Frequently asked questions

What workflows does SurgePV support?

SurgePV supports roof modeling, array layout, shading and energy-yield modeling, financial analysis, electrical workflow outputs, bills of materials, and proposals. Confirm the exact feature, export, market, and plan during a demonstration.

How fast is a SurgePV design?

Completion time depends on imagery, roof and electrical complexity, data quality, revisions, and required review. SurgePV does not promise a universal design-time reduction; use a representative project in the demo to measure your workflow.

Are energy results guaranteed or automatically bankable?

No. Results depend on input data and assumptions. Lender, insurer, utility, authority, and engineer acceptance is project-specific and may require independent validation.

Does SurgePV offer a free trial?

The current public offer is a guided demonstration rather than a promised self-service trial. Confirm access and onboarding terms with sales.

How does SurgePV compare with another platform?

Compare both products using current vendor documentation and the same representative project, required outputs, integrations, support needs, and written quotes. Use the source links and publisher disclosures on comparison pages to assess the evidence behind each claim.

Evaluate SurgePV on your next project.

Share a representative address and required outputs so the team can demonstrate the workflow and document any limitations.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.