Site Survey & Land Feasibility Services
Field survey and land feasibility work that gives your design team real ground data — contour mapping, soil testing and geotechnical reporting.
Delivered by Heaven Designs, SurgePV's trusted solar design partner
What Is Site Survey & Land Feasibility?
Survey work is where a solar project stops being an assumption. Instead of designing against satellite imagery and estimates, the site is measured and tested so the design starts from what is actually there.
Two scopes make up the service. Topographic survey uses GPS and total station equipment to produce accurate contour mapping for layout and grading plans. Ground investigation covers soil testing, earth resistivity measurement and geotechnical reporting to support foundation design.
Getting this right early is what prevents redesigns, structural surprises and yield errors later. Survey outputs feed directly into pre-design, detailed engineering and structural foundation work. Survey coverage is strongest across served regions in India; work outside those regions is confirmed case by case.
What We Cover
Contour Mapping Survey
Topographic survey using GPS and total station equipment, producing accurate contour mapping.
Layout and Grading Input
Contour data prepared for solar farm layout design and grading plans.
Soil Testing
Soil investigation supporting foundation design for solar structures.
Earth Resistivity Testing
Resistivity measurement to inform earthing and foundation decisions.
Geotechnical Reports
Geotechnical reporting that backs the structural design of the plant.
Design-Ready Outputs
Packages that flow straight into pre-design, detailed engineering and foundation work.
Built for Developers Committing to Land
Solar Developers
Establish whether a parcel works before land and grid commitments are made.
Utility-Scale Developers
Get contour and geotechnical data at the resolution a plant layout actually needs.
EPC Companies
Replace assumed ground conditions with measured ones before engineering starts.
Engineering Firms
Base foundation design on tested soil rather than a regional average.
How It Works
Submit Project
Send the site location, boundary and the scope of investigation you need.
Confirm Scope and Coverage
Survey scope is agreed and regional coverage for the site is confirmed.
Field Survey
Topographic survey is carried out with GPS and total station equipment.
Ground Investigation
Soil testing, earth resistivity measurement and geotechnical work are completed where scoped.
Final Delivery
Contour mapping and supporting reports are issued in a form the design team can use directly.
Equipment Used
- GPS survey equipment
- Total station
- Earth resistivity testing equipment
Need Professional Solar Design Support?
SurgePV gives your team the software to design solar projects in-house. When a project needs more design capacity than you have, Heaven Designs — our professional services partner — takes it on. One brief, one point of contact.

Delivered by Heaven Designs.Visit site
Often scoped alongside Site Survey & Feasibility
Ground Mount Design
Utility-scale ground mount design with terrain analysis.
Explore serviceCivil & Structural Engineering
STAAD Pro structural analysis and foundation design for solar.
Explore serviceSolar 3D Pre-Design
3D layouts, shading analysis, and energy estimates for proposals.
Explore service
The SurgePV platform
Everything above is a service someone else delivers for you. SurgePV is the software your own team designs in — the two are separate, and plenty of customers use both.
Want to see who does the work?
Every service on this site is delivered by Heaven Designs, an engineering practice working with EPCs, installers and developers. Their own site carries their project portfolio, sample drawing sets and the full detail of each discipline.
- Solar design & engineering
- Permit and CEIG documentation
- Civil & structural analysis
- Site survey & feasibility
- MW-scale project management
heavendesigns.inHeaven Designs is a separate company. SurgePV has a commercial partnership with them and links to their site are marked accordingly.
Frequently Asked Questions
What does a site survey package include?
Contour mapping, feasibility notes and the supporting reports design work depends on — scoped per site and region.
Do you provide soil testing and geotechnical reports?
Yes, where the project needs them. Geotechnical and related testing can be arranged as part of a feasibility scope.
Where do you operate surveys?
Coverage is strongest across served regions in India. Work outside those regions is confirmed case by case rather than assumed.
Why does survey quality matter so much?
Accurate site data is what prevents redesigns, structural surprises and yield errors once engineering is under way.
How do survey outputs feed into design?
Packages flow directly into pre-design, detailed engineering and structural foundation work.
Get a Free Solar Design Quote
Tell us about your site survey & feasibility project and our team will connect you with the right solar design experts.
Scoped, not guessed
Your brief is reviewed before anything is quoted, so the scope matches the project.
One point of contact
Submit through SurgePV and stay with a single thread for the platform and the services.
Your data stays yours
Project details are used to prepare your quote — nothing else.
Delivered by Heaven Designs. Enquiries submitted here are shared with our services partner so they can prepare your quote.
Request received
Thanks — your project brief is with the team. We'll be in touch about scope and the next steps. If you have drawings or site photos to add, reply to the confirmation email.
Browse all solar design services