Project Management

MW Scale Project Management Consultancy

Project management consultancy for utility-scale solar, running from feasibility through procurement and construction to commissioning and handover.

Delivered by Heaven Designs, SurgePV's trusted solar design partner

MW-scale solar project management view with a solar farm site plan and a milestone timeline across project phases
Overview

What Is MW Scale Project Management Consultancy?

PMC is consultancy-led project management for utility-scale solar. The engagement centres on management, coordination and quality oversight across the whole build, rather than on producing drawings.

Scope runs across seven areas: planning and feasibility, design and engineering support, procurement and vendor management, construction management, quality assurance and control, commissioning and handover, and risk management and compliance.

Design work can be added to the engagement or kept separate, depending on how your team is set up. Progress is reported through milestone tracking, issue logs and structured status reporting aligned to your own PMO process.

Deliverables

Scope of Work

Project Planning & Feasibility

Feasibility studies, resource assessment and project scheduling.

Design & Engineering Support

Working alongside design teams on engineering deliverables.

Procurement & Vendor Management

Strategic sourcing, vendor evaluation and procurement optimisation.

Construction Management

Site supervision, contractor coordination and milestone tracking.

Quality Assurance & Control

QA/QC protocols, inspection reporting and compliance documentation.

Commissioning & Handover

System testing, performance verification and a clean project transition.

Risk Management & Compliance

Regulatory compliance plus risk identification and mitigation across the engagement.

Who It's For

Built for Owners and EPCs Running MW-Scale Builds

  • Utility-Scale Developers

    Put experienced oversight on a build without expanding your own project office.

  • EPC Companies

    Add coordination and QA/QC capacity for a specific programme.

  • Asset Owners

    Keep an independent view on quality, schedule and vendor performance.

  • Commercial Solar Companies

    Manage MW-scale rooftop portfolios with the same discipline as a single large site.

Process

How It Works

  1. Submit Project

    Send the project scale, location and where in the lifecycle it currently sits.

  2. Define the Engagement

    PMC scope is agreed, including whether design work is bundled or kept separate.

  3. Planning and Procurement

    Feasibility, scheduling, sourcing and vendor evaluation are put in place.

  4. Construction and QA/QC

    Site supervision, contractor coordination, inspection and compliance reporting run through the build.

  5. Commissioning and Handover

    Testing and performance verification complete, then the project transitions to the owner.

Trusted Solar Design Partner

Need Professional Solar Design Support?

SurgePV gives your team the software to design solar projects in-house. When a project needs more design capacity than you have, Heaven Designs — our professional services partner — takes it on. One brief, one point of contact.

SurgePVHeaven Designs

Delivered by Heaven Designs.Visit site

Our Design Partner

Want to see who does the work?

Every service on this site is delivered by Heaven Designs, an engineering practice working with EPCs, installers and developers. Their own site carries their project portfolio, sample drawing sets and the full detail of each discipline.

  • Solar design & engineering
  • Permit and CEIG documentation
  • Civil & structural analysis
  • Site survey & feasibility
  • MW-scale project management
Trusted Solar Design PartnerHeaven Designsheavendesigns.in

Heaven Designs is a separate company. SurgePV has a commercial partnership with them and links to their site are marked accordingly.

Frequently Asked Questions

What is MW-scale PMC?

Consultancy-led project management for utility-scale solar, running from feasibility support into construction coordination and QA/QC, as the scope defines.

Do you only advise, or also manage execution?

The engagement centres on management, coordination and quality oversight. Design work can be added separately or bundled into a combined engagement.

What project sizes are supported?

MW-scale rooftop portfolios and utility-scale ground-mount programmes, subject to scope.

How is progress reported?

Through milestone tracking, issue logs and structured status reporting aligned to your PMO process.

Can vendor coordination sit inside PMC?

Yes. Procurement and vendor coordination can be part of the PMC scope where it is needed.

Request a Quote

Get a Free Solar Design Quote

Tell us about your mw scale project management project and our team will connect you with the right solar design experts.

  • Scoped, not guessed

    Your brief is reviewed before anything is quoted, so the scope matches the project.

  • One point of contact

    Submit through SurgePV and stay with a single thread for the platform and the services.

  • Your data stays yours

    Project details are used to prepare your quote — nothing else.

Delivered by Heaven Designs. Enquiries submitted here are shared with our services partner so they can prepare your quote.

Include your country code.

Pre-filled for this page. Change it if you need something else.

Paste a share link to your drawings, site photos or datasheets. Prefer to send files directly? Leave this blank and we'll reply with an upload link.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.