Pros
Cons
TL;DR: Pylon (GetPylon) is an Australian pay-per-project solar design platform at $4–$10 per project with no monthly subscription fees. Voted #1 Solar Design Tool 2025 by Australian installers, it delivers fast proposals (under 2 minutes), award-winning 3D shading, and a 20,000+ component library. Based on 1,000+ G2 ratings at 4.6/5, users love the speed and pricing but report limited proposal customization and no support for commercial structures. For Australian residential teams and small installers, Pylon is the most cost-effective option in the market. For commercial EPCs needing bankable electrical documentation, carport design, or P75/P90 metrics, SurgePV — the leading solar design tools — offers the depth Pylon lacks.
Author: Keyur Rakholiya Title: Contributing Writer, SurgePV | MD & CEO, Heaven Green Energy Limited Expertise: 1+ GW solar projects delivered, 20+ design software platforms tested, 10+ years EPC operations Published: 2026-03-08 Last Updated: 2026-03-08 Review Methodology: Official Pylon (getpylon.com) documentation, 1,000+ G2 verified reviews, Capterra reviews, Solar Nerds 2025 industry survey, comparison of published product information
Who This Review Is For
This Pylon solar review helps:
- Australian solar installers evaluating pay-per-project design tools
- Small residential teams comparing Pylon vs Aurora Solar vs OpenSolar
- US installers exploring Pylon as a low-cost alternative to subscription software
- Teams considering the Pylon CRM add-on for lead management
- EPCs checking whether Pylon can handle commercial projects
Who should skip this review:
- Utility-scale project teams (Aurora/HelioScope are better suited)
- Commercial EPCs needing P75/P90 bankability or carport design
- Teams requiring full electrical engineering documentation without AutoCAD
What Is Pylon Solar?
Pylon (branded as GetPylon at getpylon.com) is a cloud-based solar design, proposal, and CRM platform built specifically for the Australian solar market. It runs on a pay-per-project model rather than a monthly subscription — you pay $4 per Standard project or $10 per Pro project, with no monthly minimum.
Founded in 2016 by Nelson Zheng (a solar engineer from UNSW) and Daniel Buckmaster (software developer), Pylon operates under the legal name Saru Technologies Pty. Ltd. The company is headquartered in North Strathfield, NSW, Australia.
Company Background
| Detail | Info |
|---|---|
| Founded | 2016 |
| Founders | Nelson Zheng & Daniel Buckmaster |
| Legal Entity | Saru Technologies Pty. Ltd. |
| Headquarters | North Strathfield, NSW, Australia |
| Team Size | 2–10 employees |
| Users | 3,500+ solar businesses (Australia & USA) |
| Market Recognition | Voted #1 Solar Design Tool 2025 (38.3% of 250+ installers — Solar Nerds survey) |
| Innovation Award | Best Solar Innovation 2021 (Finder Awards — 3D Solar Shading) |
| G2 Rating | 4.6/5 (1,000+ ratings) |
| Capterra Rating | 4.6/5 (1,000+ ratings) |
Core Value Proposition
Pylon’s pitch is simple: design a residential solar system, generate a proposal, and get a signed quote — all in under 2 minutes — without paying a monthly fee.
That combination, pay-per-use with no seat costs and fast proposal generation, is what earned it the #1 ranking among Australian installers. Pylon is not trying to compete with utility-scale platforms. It targets small-to-medium residential installers who need professional speed without enterprise pricing.
Target Market
Primary audiences:
- Residential solar installers in Australia and New Zealand
- Small solar businesses and sole traders
- Field sales teams quoting on-site via iPad
- US solar businesses seeking cost-effective residential design tools
Geographic coverage:
- Australia: 90% high-resolution imagery (7.5cm resolution)
- USA: 80% high-resolution imagery
- Imagery updates continuously
Platform access:
- Web (app.getpylon.com)
- iPad (optimized flat 2D interface)
- Desktop via WebCatalog (Windows/Mac)
- No native iPhone or Android apps
Pylon Pricing & License Cost
Pylon pricing is the biggest differentiator. It’s the only major solar design platform with pure pay-per-project billing and no monthly subscription.
Pylon Pricing Plans 2026
| Plan | Cost | What’s Included | Best For |
|---|---|---|---|
| Standard | $4.00/project | Solar design, high-res imagery, financial projections, proposals | Residential installers, small teams |
| Pro | $10.00/project | Adds battery storage, commercial projects, custom loads, fewer limits | Battery + commercial design |
| Enterprise | Custom | SSO, API access, dedicated support | Large organisations |
| CRM Add-on | $49/user/month | Lead management, email/calendar sync, SMS, AI lead summaries | Teams needing CRM |
| eSignature | $0.80/project | Digital signatures on proposals | All project types |
| Payment Gateway | 2.5% per transaction | Collect payments through Pylon | Teams billing online |
Key pricing rules:
- Unlimited team users at no extra per-seat cost
- Maximum 5 design variations per project
- First 5 Standard projects free (no credit card required)
- No monthly minimum, no contract
Is Pylon Free?
Pylon offers 5 free Standard projects with no credit card required. That is enough to design 5 complete residential systems, generate proposals, and evaluate the full Standard workflow before paying anything.
There is no ongoing free tier. After the trial, each project is billed at $4 (Standard) or $10 (Pro).
Pro Tip
If your team runs 50 residential projects per month, Pylon Pro costs $500/month — less than most subscription-based competitors charge for a single user seat. Add the CRM for one user ($49/month) and you’re at $549/month for the whole team.
Pylon License Price vs Competitors (Total Cost of Ownership)
| Workflow | Annual Cost | Notes |
|---|---|---|
| Pylon Standard (50 projects/month) | $2,400/year | $4 × 50 × 12 |
| Pylon Pro + CRM (50 projects/month, 1 CRM user) | $6,588/year | $10 × 50 × 12 + $49 × 12 |
| Aurora Solar (1 user) | $2,388–$4,788/year | Monthly subscription, per-seat |
| OpenSolar (1 user) | $2,388/year | Monthly subscription |
| SurgePV (3 users) | $4,497/year | All features, complete electrical, no AutoCAD needed |
For teams with variable monthly volumes under 20 projects, Pylon’s pay-per-project model typically beats any monthly subscription.
Hidden Costs to Know
Pylon’s base pricing is transparent, but factor in: eSignature at $0.80/project, the CRM add-on at $49/user/month if needed, and the 2.5% payment gateway fee if you collect deposits online. High-resolution Nearmap imagery is included in the base price — no separate Nearmap subscription required.
Core Features & Capabilities
Pylon Solar Design
Pylon’s design interface is 2D-first, which is a deliberate choice. Most residential installers don’t need to orbit a 3D model — they need to place panels fast and get to proposal stage. The flat layout works well on iPad for on-site quoting.
Design features:
- Click-drag panel placement with auto-alignment
- Blueprint and drone photography upload, rotatable directly on the map
- 3D object snapping (roofs, walls, obstructions)
- High-resolution aerial imagery included (90% AU coverage at 7.5cm, 80% US coverage)
- 20,000+ solar panels, 20,000+ inverters, battery options (Tesla Powerwall 3, Sigenergy, Sungrow), EV chargers, air conditioners
One verified user review says: “SLD is a dream, makes my job quicker.” The design-to-proposal workflow is genuinely fast once the team is familiar with the interface — panel placement under a minute per roof, per official documentation.
Pylon Solar Design Software: 3D Shading Analysis
Pylon’s 3D shading analysis won the Finder Awards Best Solar Innovation in 2021. It predicts shading in seconds, which is fast for residential site assessments.
The limitation: independent testing has flagged approximately 10% energy production overestimation in some scenarios. This is material for any project requiring bankable P50 accuracy, and it rules out P75/P90 analysis entirely. For residential proposals where the client wants an annual production estimate, the speed-accuracy tradeoff works. For commercial projects where a financier needs documented accuracy, it does not.
Compare that to SurgePV’s shadow analysis, which provides documented accuracy within 3% of PVSyst with full P50/P75/P90 output for bankable projects.
Pylon Analytics and Reporting Features
Pylon’s analytics and reporting features are strongest for Australian residential compliance and financial modeling:
Financial modeling:
- ROI optimization
- Time-of-use rate analysis
- Component replacement cost projections
- Load profile analysis using 60-minute interval data from 10+ Australian energy retailers
Battery simulations:
- Off-peak charging scenarios
- Time-of-use optimization
- Days-of-autonomy modeling
Automated documentation:
- Single-line diagrams (SLD) — one-click generation
- Voltage rise reports with cable path planning and VRC calculations
- Installer job sheets
- System owner manuals
- BESS site plans (floor plan tool for battery locations)
Australian compliance reports:
- STC calculations
- PRC (NSW) support
- VEEC (Victoria) support
- Cheaper Home Batteries Program compliance
The Pylon analytics and reporting features are well-matched to the Australian residential workflow. Where they fall short is in commercial electrical depth — voltage drop analysis, conduit fill calculations, and advanced wire sizing are not available.
Pylon CRM Solar Software
The Pylon CRM is an optional add-on at $49 per user per month. It is a separate purchase from the design platform.
Pylon CRM features:
- AI-powered lead summaries
- Auto lead processor
- Customizable sales pipelines
- Email and calendar sync (Google Workspace, Microsoft 365)
- SMS capabilities
- Automated email sequences
- Multi-office support with geographic prioritization
- Real-time design collaboration indicator (see who’s viewing the same design)
Integrations:
- Accounting: Xero (auto invoice sync with PRCs)
- Job management: ServiceM8 (creates jobs with line items)
- Financing: Brighte, Smart Ease, Solaris Finance (BNPL)
- Imagery: Nearmap (high-res, included in base price)
- Marketing: Mailchimp
Pylon CRM vs Arka360 CRM
Arka360 includes CRM natively in its subscription cost. Pylon’s CRM is a separate $49/user/month add-on. For teams that don’t need CRM, Pylon’s pay-per-project model is cheaper. For teams that want CRM included in a flat rate, compare the Arka360 review at /reviews/arka360.
Proposal Generation
Pylon’s proposal speed is its most praised capability. The official claim of “proposals in under 2 minutes” is backed by user reviews across multiple platforms.
Proposal features:
- Instant web and PDF proposals
- Digital signatures (eSignature at $0.80/project)
- Side-by-side design comparison pages
- 3 customizable templates (color, logo, company info)
- Automatic headers and component data pulled from design
The limitation: 3 templates is thin. Teams needing brand-specific layouts or complex multi-system comparison proposals will hit this ceiling. Solar proposal software at SurgePV supports richer proposal customization for commercial presentations.
Integrations & API
- Xero: auto-invoice sync including PRCs
- ServiceM8: job creation with line items
- Brighte / Smart Ease / Solaris Finance: BNPL financing integration
- Nearmap: high-resolution imagery (included)
- Mailchimp: email marketing
- REST API + Webhooks: cryptographic security (HMAC SHA256), developer hub and docs available
- Google Workspace / Microsoft 365: calendar and email sync (via CRM)
Pylon Solar in Australia
Pylon is purpose-built for the Australian solar market. This matters more than it might seem for non-Australian readers.
Australian-specific advantages:
- STC calculations built into financial modeling (Small-scale Technology Certificates)
- PRC support (NSW Premium Retail Credit)
- VEEC support (Victorian Energy Efficiency Certificates)
- Cheaper Home Batteries Program compliance (added May 2025)
- Brighte and Smart Ease BNPL integrations (dominant AU solar financing options)
- ServiceM8 integration (widely used Australian job management platform)
- Xero integration with PRC auto-sync (Xero is the dominant accounting platform in AU/NZ)
- 90% high-resolution imagery coverage at 7.5cm resolution across Australia
For Australian residential installers, these features remove significant manual compliance work from each project. No other solar design platform has this depth of AU regulatory integration.
For US installers, Pylon works — 80% high-resolution US imagery, full design and proposal workflow — but the AU-specific compliance features are irrelevant, and competitors like Aurora Solar or SurgePV may offer more US market depth.
Need More Than Pylon Can Deliver?
SurgePV handles commercial projects, carport design, complete electrical documentation, and P50/P75/P90 bankable accuracy — with Australia and US coverage.
Book a DemoNo commitment required · 20 minutes · Live project walkthrough
User Reviews & Feedback
G2 and Capterra Scores
| Platform | Score | Reviews |
|---|---|---|
| G2 | 4.6/5 | 1,000+ |
| Capterra | 4.6/5 | 1,000+ |
| Crozdesk | 88/100 | Top 3 in Solar category |
| Solar Nerds 2025 | #1 Design Tool | 38.3% of 250+ installers |
Top Praised Features
| Rank | Feature | Notes |
|---|---|---|
| 1 | Ease of use | “Even beginners can navigate easily” |
| 2 | Proposal speed | “Punch out proposals in 2 minutes” |
| 3 | SLD generation | “SLD is a dream, makes my job quicker” |
| 4 | Pricing model | “Pay-per-use suits smaller operators perfectly” |
| 5 | Customer support | Founder-led, under 5-minute response time |
| 6 | Value for money | “Great value with all features of expensive software” |
Top Criticisms
| Rank | Issue | Severity |
|---|---|---|
| 1 | Energy overestimation (~10%) | High — affects proposal accuracy |
| 2 | Limited proposal templates (3 only) | Medium — limits brand customization |
| 3 | Not viable for large commercial | High — no carports, trackers, P75/P90 |
| 4 | Usage modeling difficulty | Medium |
| 5 | Geographic imagery gaps (10–20% of regions) | Low–Medium |
| 6 | Max 5 design variations per project | Low |
Direct User Quotes
“Very easy to use, especially for those just starting.” — Capterra reviewer
“Pay-per-use option suits smaller operators perfectly.” — G2 reviewer
“Create proposals in under 2 minutes — professional-looking quotes full of details.” — Capterra reviewer
“Not designed for large-scale jobs or complex simulations.” — G2 reviewer
The pattern in Pylon solar reviews is consistent: residential installers are happy. Users hitting commercial complexity are not.
Pros & Cons
Pros
1. Pay-Per-Project Pricing With No Monthly Fees — Unique Advantage
$4/project Standard with no subscription is the most cost-effective residential design pricing in the market. For teams with fewer than 20–30 projects per month, this beats any subscription platform. Unlimited users at no per-seat cost is a further advantage over Aurora Solar’s $199/month/user model.
2. Voted #1 Solar Design Tool in Australia (2025)
38.3% of 250+ Australian installers in the Solar Nerds survey named Pylon their top design tool. That is real market validation from practitioners, not marketing.
3. Proposal Speed
Under 2 minutes from design to signed proposal is genuinely fast. On-site quoting via iPad is a workflow most installers cannot replicate with desktop-only competitors.
4. Award-Winning 3D Shading Analysis
The 3D shading analysis won Finder Awards Best Solar Innovation 2021. It delivers results in seconds — fast enough for on-site assessments. The known ~10% overestimation issue applies mainly to edge-case accuracy scenarios, not typical residential assessments.
5. Australian Market Depth
No other platform matches Pylon’s Australian compliance depth — STC, PRC, VEEC, Cheaper Home Batteries Program, Brighte, ServiceM8, Xero PRC sync. These features save material time per project for Australian residential teams.
6. Free Trial Without a Credit Card
5 free Standard projects with no credit card is a low-friction way to evaluate. Most competitors require a demo call or credit card before access.
7. Component Database
20,000+ panels and 20,000+ inverters covers virtually any residential Australian system. Tesla Powerwall 3, Sigenergy, Sungrow batteries, EV chargers, and air conditioners are all included.
Cons
1. ~10% Energy Overestimation — Material Issue
Independent testing has identified approximately 10% overestimation in energy production calculations in some scenarios. This is acceptable for rough residential proposals. It is not acceptable for commercial financing, grid applications, or any project where a financier reviews the production model.
2. No Commercial Structures
Pylon does not support carport solar design, solar trackers (single-axis or dual-axis), or East-West racking optimization. These are the fastest-growing commercial solar segments. If your pipeline includes parking canopy projects or ground-mount trackers, Pylon cannot design them.
3. No P75/P90 Bankability
Commercial lenders and project financiers often require P75 or P90 energy production estimates (not just P50) to quantify downside risk. Pylon provides P50 only. This alone disqualifies it for any financing-dependent commercial project.
4. Only 3 Proposal Templates
Three templates with limited customization is thin for teams that sell on brand presentation. The templates are functional but generic. Competitors like SurgePV and Aurora Solar offer richer solar proposal software with more layout control.
5. Maximum 5 Design Variations Per Project
If you want to show a client more than 5 system options — different sizes, battery combinations, orientations — Pylon hits a hard wall at 5. For complex commercial proposals showing multiple configurations, this is a workflow constraint.
6. No Native Mobile Apps
Pylon supports iPad and desktop via WebCatalog. There are no native iPhone or Android apps. Field teams on Android phones cannot run Pylon natively.
7. Small Company Risk
2–10 employees serving 3,500+ businesses is a lean operation. Platform continuity, feature velocity, and enterprise support depth depend on a small team. Pylon ships monthly updates (5–9 features per release), which shows strong development commitment — but enterprise procurement teams should weigh this.
Pylon vs SurgePV
Head-to-Head Feature Comparison
| Feature | Pylon (GetPylon) | SurgePV | Winner |
|---|---|---|---|
| Pricing model | $4–$10/project, no monthly | From $1,499/user/year | Context-dependent |
| Australian compliance | STC, PRC, VEEC, full AU depth | AU + US coverage | Pylon |
| 3D shading analysis | Award-winning, seconds | Documented ±3% vs PVSyst | SurgePV (accuracy) |
| P50/P75/P90 bankability | P50 only | Full P50/P75/P90 | SurgePV |
| SLD generation | One-click basic | Automated, complete, permit-ready | SurgePV |
| Wire sizing / voltage rise | Voltage rise only (AU) | Complete voltage drop + conduit fill | SurgePV |
| Carport design | Not available | Native support | SurgePV |
| Tracker support | Not available | Single-axis and dual-axis | SurgePV |
| East-West racking | Not available | Available | SurgePV |
| Proposal speed | Under 2 minutes | 15–30 minutes | Pylon |
| Component database | 20,000+ panels, 20,000+ inverters | Comprehensive | Comparable |
| CRM | $49/user/month add-on | Integrates with external CRM | Pylon (if you need CRM) |
| Ease of use | Very fast learning curve | 2–3 weeks | Pylon |
| iPad / on-site quoting | Optimized 2D for iPad | Desktop-first | Pylon |
| Team pricing | Unlimited users included | Per-user pricing | Pylon |
Workflow Time: 100kW Commercial Rooftop Project
| Step | Pylon | SurgePV |
|---|---|---|
| Roof design | 15–30 min | Combined with SLD |
| Shading simulation | Seconds (±10% accuracy) | Included |
| SLD generation | Basic, one-click | Complete, automated, 5–10 min |
| Voltage rise / drop | Voltage rise only | Full voltage drop analysis |
| P75/P90 report | Not available | Included |
| Proposal | Under 2 min | 15–30 min |
| Total | Limited scope | Full commercial package |
| Suitable for commercial finance? | No | Yes |
Annual Cost Comparison
| Scenario | Annual Cost |
|---|---|
| Pylon Standard (50 projects/month) | $2,400/year |
| Pylon Pro + CRM (50 projects/month, 1 user) | $6,588/year |
| Aurora Solar (1 user, monthly) | $2,388–$4,788/year |
| SurgePV (3 users, all-inclusive) | $4,497/year |
For teams running 50+ residential projects per month with no commercial work, Pylon Pro at $500/month competes with SurgePV at $375/user/month. For teams mixing residential and commercial, SurgePV’s generation and financial tool and complete electrical documentation change the value equation significantly.
Pylon Alternatives
Aurora Solar is the most direct alternative for US-market installers. It is subscription-based ($199/month/user), stronger on commercial residential features and brand recognition, but more expensive and slower to learn than Pylon. Australian-specific compliance is absent.
OpenSolar offers a free tier for small teams and strong international coverage. It lacks Pylon’s Australian compliance depth and proposal speed but has more proposal templates and global imagery.
Arka360 is India-focused with a built-in CRM. Comparable pricing to Pylon’s monthly equivalent but subscription-based. Not relevant to Australian market workflows.
HelioScope targets simulation accuracy for larger commercial and utility-scale projects. Not a residential tool — the learning curve and pricing reflect that. Pylon is faster and cheaper for residential.
PVsell is an Australian proposal-focused tool. It covers proposals and CRM but not full design. Teams needing design + proposal in one tool should compare Pylon vs PVsell carefully.
SurgePV is the right move when your pipeline grows beyond residential rooftop — commercial projects above 100kW, carport solar, tracker systems, or any project requiring bankable electrical documentation.
Who Should Use Pylon Solar Software?
Best Fit for Pylon
1. Australian Residential Installers The compliance depth — STC, PRC, VEEC, Cheaper Home Batteries — and AU imagery coverage make Pylon the strongest tool built for the Australian residential market. No other platform comes close on local regulatory integration.
2. Low-Volume or Variable-Volume Teams Pay-per-project pricing is most cost-effective for teams that don’t run a predictable 30–50+ projects per month. Sole traders and small businesses pay only when they work.
3. On-Site Quoting With iPad The iPad-optimized 2D interface and under-2-minute proposal workflow is designed for field sales. If your team quotes on-site at the customer’s home, Pylon’s workflow fits that process directly.
4. Teams Wanting Unlimited Users Without Per-Seat Costs Unlimited team members at no extra cost is a genuine advantage for growing teams where headcount changes frequently.
5. Cost-Conscious Small Businesses The free trial (5 projects, no credit card) and $4/project pricing let small businesses start with zero risk.
Who Should Look Elsewhere
Commercial EPCs above 100kW: Pylon’s design tools, shading accuracy, and documentation fall short for projects needing bankable metrics.
Teams designing carports, trackers, or East-West racking: These structures are not supported. SurgePV is the only platform with native carport support.
Projects requiring P75/P90 energy estimates: Pylon only provides P50. Financiers for commercial projects routinely require P75 or P90.
US-focused teams: Pylon works in the US but the AU-specific features don’t apply, and competitors with stronger US market depth may serve better.
Frequently Asked Questions
What is Pylon software?
Pylon (GetPylon) is a pay-per-project solar design, proposal, and CRM platform built for the Australian market. It runs at $4/project (Standard) and $10/project (Pro), with no monthly subscription. Founded in 2016 by two Australians, it serves 3,500+ solar businesses primarily in Australia and the USA.
What is Pylon solar?
Pylon solar is a cloud-based solar design tool that combines aerial imagery, 3D shading analysis, financial modeling, SLD generation, and proposal creation in one workflow. It was voted #1 Solar Design Tool 2025 by Australian installers in the Solar Nerds survey. It is particularly strong for residential rooftop, battery storage, and EV charger design in the Australian market.
How much does Pylon pricing cost?
Standard: $4/project. Pro: $10/project. CRM add-on: $49/user/month. eSignature: $0.80/project. Enterprise pricing is custom. The first 5 Standard projects are free with no credit card required. There are no monthly subscription fees and no per-seat costs for team members.
What are Pylon solar reviews saying?
Pylon holds 4.6/5 on both G2 and Capterra with 1,000+ ratings. Users consistently praise the ease of use, proposal speed (under 2 minutes), SLD generation, and value for money. The recurring criticisms are limited proposal customization (3 templates), ~10% energy production overestimation in independent testing, and no support for commercial structures like carports or trackers.
Does Pylon have CRM features?
Yes, as a paid add-on at $49/user/month. The Pylon CRM includes AI-powered lead summaries, customizable pipelines, email and calendar sync, SMS automation, and multi-office support. It is not included in the base project pricing and must be purchased separately.
Is Pylon solar software good for Australia?
Yes. It is the most Australia-specific solar design platform available. It integrates STC, PRC (NSW), VEEC (Victoria), and the Cheaper Home Batteries Program directly into financial modeling. It connects to Xero with PRC auto-sync, ServiceM8 for job management, and Brighte/Smart Ease for BNPL financing — the dominant tools in the Australian solar industry.
What are the main Pylon alternatives?
Aurora Solar (stronger commercial, subscription-based), OpenSolar (free tier, global coverage), SurgePV (complete electrical engineering, commercial structures, bankable accuracy), HelioScope (simulation-focused, utility-scale), and PVsell (Australian proposals-first). For Australian residential teams prioritizing cost and speed, Pylon remains the strongest option.
Final Verdict
Pylon Executive Summary
Strengths:
- Pay-per-project pricing with no monthly fees or per-seat costs
- Voted #1 Solar Design Tool 2025 by Australian installers
- Fastest proposal generation in the market (under 2 minutes)
- Deep Australian regulatory compliance
- Free trial (5 projects, no credit card)
- Award-winning 3D shading analysis
- Monthly feature releases (5–9 features per update)
Limitations:
- ~10% energy production overestimation in independent tests
- No P75/P90 bankability metrics
- No carport, tracker, or East-West racking support
- Only 3 proposal templates
- Max 5 design variations per project
- No native mobile apps (iPad and desktop only)
- Small team (2–10 employees) — enterprise scalability risk
The Decision Framework
Choose Pylon when:
- You are an Australian residential installer with variable monthly project volumes
- You need on-site iPad quoting with proposal generation in under 2 minutes
- Your projects are under 100kW residential rooftop or battery storage
- You want unlimited users at $4–$10/project with no monthly commitment
Choose SurgePV when:
- You design commercial projects above 100kW needing bankable documentation
- Your pipeline includes carport solar, trackers, or East-West racking
- You need P75/P90 production estimates for project financing
- You require complete electrical engineering without AutoCAD
Value Analysis
Pylon is the right tool for a specific type of solar business: Australian residential installers who design 10–60 projects per month, work on-site with iPad, and need fast proposals without a monthly software bill. For that profile, Pylon is genuinely excellent.
For commercial EPCs, the cost-per-project model breaks down quickly. At 50 Pro projects per month plus one CRM seat, Pylon runs $6,588/year. Add the limitations — no P75/P90, no bankable SLD, no commercial structures — and teams doing mixed residential/commercial work will outgrow Pylon before the cost savings justify the feature gaps.
Rate this review: Pylon earns a 7/10. The pay-per-project model and Australian depth are strong enough to recommend it to its target audience. The commercial ceiling and accuracy concerns prevent a higher score.
Take the Next Step
- Book a SurgePV demo — see automated SLD generation, commercial structures, and P50/P75/P90 output in a live walkthrough
- Compare platforms — all software review posts
- Pylon pricing vs SurgePV — full cost comparison
Related Resources
Platform Comparisons:
- Arka360 Review — India-focused CRM-integrated platform
- OpenSolar Review — Free tier global alternative
- Solar Design Software Guide — Complete platform comparison
Feature Deep Dives:
- Shadow Analysis Software — shading analysis comparison
- Solar Proposal Software — proposal tool comparison
- Solar yield and financial analysis — financial modeling for solar projects
This Pylon (GetPylon) review was written by Keyur Rakholiya, Contributing Writer at SurgePV and MD & CEO of Heaven Green Energy Limited, using the cited public sources. All Pylon information is sourced from official getpylon.com documentation, 1,000+ G2 verified reviews, Capterra reviews, and the Solar Nerds 2025 Australian installer survey. We disclose our company affiliation with SurgePV transparently.
Review last updated: 2026-03-08 | Next review: June 2026
About the Contributors

Co-Founder · SurgePV
Nirav Dhanani is identified by SurgePV as a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, conversion results, and market-expansion claims are not asserted without retained evidence.

Editorial contributor · SurgePV
Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.
