Detailed Engineering

Solar Post-Design Services

Turn an approved concept into a buildable package — layout drawings, structural calculations, and CEIG documentation your crews and inspectors can work from.

Delivered by Heaven Designs, SurgePV's trusted solar design partner

Solar post-design engineering drawing with dimensioned array layout, equipment callouts and technical annotations
Overview

What Is Solar Post-Design?

Post-design is the detailed engineering stage that begins once the preliminary design has been signed off. Where pre-design answers whether a system works, post-design specifies exactly how it gets built.

The package covers the drawings and calculations a project needs to move into execution: CAD layouts for panel placement and wiring, structural analysis of the mounting system and foundations, CEIG electrical documentation, and the as-built set used for permits and handover.

Structural and electrical scopes can be delivered together or separately, depending on what your EPC team already has covered. If site conditions change or you come back with feedback, the drawings are revised within the agreed project scope.

Deliverables

What's Included

Detailed Layout Drawings

Complete CAD drawing set covering panel placement and wiring across the array.

Structural Calculations

Foundation, mounting structure and load analysis for the system as designed.

CEIG Electrical Drawings

Single-line, three-line and schematic diagrams prepared for electrical review.

As-Built Documentation

The final documentation package used for permits and project handover.

Coordinated Scopes

Structural and electrical packages can be delivered together, scoped around what your team already covers.

Scoped Revisions

Drawings updated when site data changes or feedback comes back, within the agreed scope.

Who It's For

Built for Teams Moving Projects Into Construction

  • EPC Companies

    Add engineering throughput without adding permanent drafting headcount.

  • Solar Contractors

    Hand crews a drawing set that resolves wiring and mounting before anyone is on the roof.

  • Engineering Firms

    Offload production drafting so your engineers stay on review and sign-off.

  • Commercial Solar Companies

    Take C&I projects from approved concept to execution documents on a predictable path.

Process

How It Works

  1. Submit Project

    Send the approved concept design and the scope you need engineered.

  2. Share Project Information

    Provide site data, equipment selections and any structural or electrical constraints.

  3. Design and Engineering

    Layout drawings, structural calculations and electrical documentation are produced.

  4. Review and Revisions

    Your engineers review the package and changes are made within scope.

  5. Final Delivery

    The construction package and as-built documentation set are issued.

What You Need to Send

  • Approved preliminary or concept design
  • Equipment selections and datasheets
  • Site data and structural constraints
  • The scope you want covered: structural, electrical, or both
Trusted Solar Design Partner

Need Professional Solar Design Support?

SurgePV gives your team the software to design solar projects in-house. When a project needs more design capacity than you have, Heaven Designs — our professional services partner — takes it on. One brief, one point of contact.

SurgePVHeaven Designs

Delivered by Heaven Designs.Visit site

Our Design Partner

Want to see who does the work?

Every service on this site is delivered by Heaven Designs, an engineering practice working with EPCs, installers and developers. Their own site carries their project portfolio, sample drawing sets and the full detail of each discipline.

  • Solar design & engineering
  • Permit and CEIG documentation
  • Civil & structural analysis
  • Site survey & feasibility
  • MW-scale project management
Trusted Solar Design PartnerHeaven Designsheavendesigns.in

Heaven Designs is a separate company. SurgePV has a commercial partnership with them and links to their site are marked accordingly.

Frequently Asked Questions

How is post-design different from pre-design?

Pre-design is for visualisation and early yield estimates. Post-design produces buildable packages with deeper engineering detail — the drawings and calculations a project needs to be constructed.

Do you coordinate structural and electrical together?

Yes. Both can sit in a single package, scoped around what your EPC team already handles internally.

What project sizes are supported?

Residential and C&I work through to larger commercial, industrial rooftop and ground-mount scopes.

Can drawings be revised after site changes?

Yes. Updates driven by new site data or client feedback are handled within the agreed project scope.

Do I need to have done pre-design with you first?

No. Post-design can start from a concept your own team produced, including designs built in SurgePV.

Request a Quote

Get a Free Solar Design Quote

Tell us about your solar post-design project and our team will connect you with the right solar design experts.

  • Scoped, not guessed

    Your brief is reviewed before anything is quoted, so the scope matches the project.

  • One point of contact

    Submit through SurgePV and stay with a single thread for the platform and the services.

  • Your data stays yours

    Project details are used to prepare your quote — nothing else.

Delivered by Heaven Designs. Enquiries submitted here are shared with our services partner so they can prepare your quote.

Include your country code.

Pre-filled for this page. Change it if you need something else.

Paste a share link to your drawings, site photos or datasheets. Prefer to send files directly? Leave this blank and we'll reply with an upload link.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.