SurgePV

Solar Design Resources for Your Team

Find a guide for your next design decision, use a calculator, or download a worksheet to compare software on a representative project.

Download a worksheet

These editable CSV worksheets open in spreadsheet software. They contain review prompts and blank fields for your own observations. They do not contain benchmark results or replace an engineering review.

Design and engineering workflows

  • 3D roof modeling: what to inspect in the roof geometry before placing modules.
  • Shading analysis: explore the design workflow and questions to ask about site assumptions.
  • CAD export evaluation: check a sample file, drawing units, layers, and the receiving application.
  • Solar compliance guides: find jurisdiction-specific reading, then confirm the adopted requirements with the responsible authority.

Software buying and team workflows

Calculators and reference material

Browse the free solar calculators for an initial estimate, the solar glossary for terminology, or the blog for longer workflow guides. Check each tool’s units, assumptions, and limitations before using its output in a project.

Use a real task in your software demo

Choose the design or handoff problem your team needs to solve. Bring the evaluation worksheet and ask to inspect both the starting inputs and the reviewed output.

Request a guided SurgePV demo. The worksheets above are available directly without submitting a demo request.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.