Clara AI

Meet Clara AI - Your AI Solar Design Copilot

Purpose-built for solar professionals - not a generic chatbot.

Not just automation - Clara AI thinks ahead. This AI-based solar design copilot turns complexity into clarity, helping every team move faster, smarter, and with confidence.

AI assistance included in every SurgePV plan · No extra cost

AI

Built-in copilot

0%

Faster design turnaround

$0

Extra cost — included free

Real-time

AI responses

01 Design Intelligence

Auto-Design Optimization and Code Compliance - Instantly

Clara AI brings auto-design to your workflow, suggesting optimal panel layouts based on roof geometry, shading, and energy targets - then cross-checks every design against the codes that matter.

Auto-Design Optimization

Clara suggests optimal panel layouts based on roof geometry, shading, and energy targets. Get the best layout without the manual iteration.

Code Compliance Lookup

Ask Clara about NEC, IEC, or local building codes - get instant, accurate answers without leaving your design workflow.

Approval-Ready Every Time

Clara flags compliance issues before submission so your designs pass review on the first attempt - every time.

02 Smart Sizing & Automation

System Sizing Assistant and Workflow Automation in One Copilot

Input client energy usage and Clara recommends the optimal system size, inverter pairing, and configuration - then applies design automation to handle the repetitive tasks that slow your team down.

System Sizing Assistant

Input client energy usage and Clara recommends optimal system size, inverter pairing, and configuration - eliminating guesswork entirely.

Workflow Automation

Clara automates repetitive tasks like BOM generation, stringing calculations, and report formatting - saving hours on every project.

Onboarding Accelerator

New hires are productive in days instead of months. Clara walks them through code compliance and design best practices in real-time.

03 Troubleshooting & Support

Describe a Problem - Clara Diagnoses It in Seconds

Describe a design issue and Clara identifies root causes and suggests solutions based on best practices - turning hours of debugging into seconds of clarity. Clara works alongside SurgePV's solar design tools, shadow analysis, and proposal generation to keep your entire workflow connected.

Instant

Root cause identification for design issues

Best Practices

Solutions grounded in solar industry standards

All Types

Residential, commercial, and ground-mount support

Always On

Available 24/7 within your design workflow

Clara AI troubleshooting support

What Solar Professionals Say About Clara AI

Clara AI suggested a layout change that increased our array output by 8% on a commercial project. It caught something our senior designer missed.

OL

Oscar Lindqvist

Operations Manager, Nordic Solar Solutions

"New hires are productive in days instead of months. Clara walks them through code compliance and design best practices in real-time."

AO

Amara Osei

Project Coordinator, AfriSolar Ghana

"The troubleshooting feature saved us hours. We described a stringing issue and Clara identified the inverter mismatch immediately."

PM

Patrick Murphy

Technical Director, IreSolar Ltd

Frequently Asked Questions

What makes Clara AI different from other solar design assistants?

Clara AI is purpose-built for solar workflows. It assists with layout optimization, code compliance, system sizing, and troubleshooting — learning from your design patterns to suggest improvements specific to your project types.

Can Clara AI help new team members learn faster?

Yes. Clara provides real-time guidance on design best practices, code requirements, and system sizing — significantly reducing onboarding time for new designers.

Does Clara AI work with all project types?

Yes. Clara supports residential, commercial, and ground-mount projects. It adapts its suggestions based on project type, local codes, and system specifications.

Is Clara AI included in all plans?

Yes. Clara AI is included with every SurgePV plan at no extra cost. All features, all plans — no add-ons or premium tiers.

Design More. Sell More. Build More.

Join 500+ solar companies who saw SurgePV in action and never went back to their old tools.