Solar Design Services

Solar Design Services

Professional solar design, engineering, permitting, site survey and project management for installers, EPCs and developers — worldwide, and available whenever your own team runs out of design capacity.

Delivered by Heaven Designs, SurgePV's trusted solar design partner

Solar design services delivery path from site survey through 3D design and engineering drawings to approval
What We Cover

Design capacity, on the projects where you need it

Solar teams rarely need more engineers all year. They need them on a particular week, for a particular project, in a particular discipline. These nine services exist to be picked up for exactly that — a bid layout, a permit set, a structural check, a full MW-scale programme.

  • Design & Engineering

    3D layouts and shading studies through to construction-ready drawing sets, structural calculations and electrical documentation.

  • Permitting & Approvals

    AHJ permit plan sets for US and Canada projects, and CEIG electrical sets prepared to state DISCOM submission formats.

  • Survey & Project Management

    Contour mapping, soil and geotechnical investigation, and consultancy-led project management for MW-scale builds.

Partnership

Professional Solar Design. Powered by the Right Technology.

SurgePV builds the solar design software — 3D modelling, shading analysis, yield and financial modelling, and proposals — used by installers and EPCs to design their own projects.

Heaven Designs is our professional services partner. When a project needs drafting, engineering, permitting, survey or project management work that your own team does not have the capacity to take on, that work is scoped and delivered by their engineers.

You submit one brief through SurgePV. The right specialists pick it up. You keep a single point of contact for both the platform and the services.

Software & technologySurgePV

Solar design, simulation, financial modelling and proposals — the platform your team works in.

Trusted Solar Design PartnerHeaven Designs

Professional solar design, engineering, permitting, survey and project management, delivered as a service.

Visit Heaven Designs

Services on this site are delivered by Heaven Designs under a commercial partnership with SurgePV. Scope, timelines and pricing are confirmed in your quote.

Process

How a Project Runs

The same five steps whichever service you start with. Scope, timeline and pricing are always confirmed in your quote before work begins.

  1. Submit Your Project

    Send the project, the service you need and whatever site information you already have.

  2. Scope and Quote

    Your brief is reviewed, the scope is agreed and you receive a quote covering deliverables and timeline.

  3. Design & Engineering

    The work is produced by the partner engineering team using the inputs you supplied.

  4. Review & Revisions

    You review the package and revisions are made within the agreed scope.

  5. Final Delivery

    The completed drawings, calculations and documentation are handed over.

Software or Services?

Two different things. Pick either, or both.

It is worth being blunt about the difference, because they are bought differently and priced differently.

Software

Your team designs it

SurgePV is a platform your designers work in — 3D roof modelling, shading analysis, yield and financial modelling, electrical workflow support and proposals, in one place. You license it and use it on every project.

Explore SurgePV
Services

Someone designs it for you

The nine services on this page are project work delivered by Heaven Designs. You send a brief, agree a scope, and receive the drawings, calculations or documentation back. Priced per project, not per seat.

Get a Free Quote
Our Design Partner

Want to see who does the work?

Every service on this site is delivered by Heaven Designs, an engineering practice working with EPCs, installers and developers. Their own site carries their project portfolio, sample drawing sets and the full detail of each discipline.

  • Solar design & engineering
  • Permit and CEIG documentation
  • Civil & structural analysis
  • Site survey & feasibility
  • MW-scale project management
Trusted Solar Design PartnerHeaven Designsheavendesigns.in

Heaven Designs is a separate company. SurgePV has a commercial partnership with them and links to their site are marked accordingly.

Frequently Asked Questions

Who delivers these solar design services?

The services are delivered by Heaven Designs, SurgePV's solar design services partner. SurgePV builds the software; Heaven Designs provides the professional design, engineering, permitting, survey and project management work. You submit your brief through SurgePV and keep one point of contact.

How is this different from the SurgePV platform?

SurgePV is software your own team uses to design, simulate and propose solar projects. These pages are for outsourced work — projects you want someone else to design, engineer or draw for you. Many customers use both: the platform for day-to-day design, the services for overflow, specialist scopes and permit sets.

Do I need to be a SurgePV customer to request a quote?

No. You can request a solar design services quote whether or not you use the SurgePV platform.

Which services should I ask for?

If you are still at proposal stage, start with Solar 3D Pre-Design. If a concept is already approved, Solar Post-Design or Rooftop Detailed Engineering covers the construction package. If you only need approval documents, look at Solar Permit Design for US and Canada work or Electrical CEIG Drawings for Indian net and gross metering projects. Select "Multiple services / not sure" on the form if you would rather have the scope worked out with you.

What information do you need to quote?

At minimum the project location, the project type and the service you need. Site measurements, existing drawings, equipment selections and survey data all shorten the scoping conversation, but a quote can be prepared without them.

Can services be combined into one package?

Yes. Structural, electrical and layout scopes are frequently delivered together, and project management engagements can include design work. Scope is confirmed in your quote.

Request a Quote

Get a Free Solar Design Quote

Tell us about your project and our team will connect you with the right solar design experts.

  • Scoped, not guessed

    Your brief is reviewed before anything is quoted, so the scope matches the project.

  • One point of contact

    Submit through SurgePV and stay with a single thread for the platform and the services.

  • Your data stays yours

    Project details are used to prepare your quote — nothing else.

Delivered by Heaven Designs. Enquiries submitted here are shared with our services partner so they can prepare your quote.

Include your country code.

Paste a share link to your drawings, site photos or datasheets. Prefer to send files directly? Leave this blank and we'll reply with an upload link.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.