Solar Ground Mount Design Services
Optimised ground-mount design for utility-scale and large commercial solar — row spacing, structural and civil packages, and the electrical layout that ties it together.
Delivered by Heaven Designs, SurgePV's trusted solar design partner
What Is Ground Mount Design?
Ground-mount design takes a land parcel and turns it into a buildable solar plant layout. The array is arranged against the terrain rather than a flat plan, so row spacing, grading and access are resolved together instead of being fixed one at a time.
Four scopes make up the package: the array layout and inter-row spacing, the structural design of racking and foundations, the civil work covering grading, drainage and foundation engineering, and the DC and AC electrical layout with string sizing and single-line diagrams.
Layouts are built to balance energy performance, constructability and O&M access — ground coverage ratio and yield are optimised against how the site will actually be built and maintained, not just against a simulation.
What We Design
Optimal Row Spacing
Inter-row spacing calculated so yield is maximised while shading losses stay controlled.
Structural Design
Racking and foundation engineering for ground-mount arrays across differing soil conditions.
Civil and Foundation
Site grading, drainage design and foundation engineering for the plant.
Electrical Design
DC and AC layout, string sizing and single-line diagrams for the ground-mount system.
Terrain-Aware Layouts
Array arrangement worked against contour data rather than a flat idealised plan.
GCR and Yield Optimisation
Layouts balanced across energy performance, constructability and O&M access.
Built for Utility-Scale and Large C&I Developers
Utility-Scale Developers
Get plant layouts that survive contact with the terrain, not just the spreadsheet.
EPC Companies
Bring in ground-mount engineering depth for a specific project without restructuring your team.
Solar Developers
Test a parcel for real capacity, spacing and grading cost before you commit.
Engineering Firms
Add civil and structural ground-mount capacity for a peak in the pipeline.
How It Works
Submit Project
Send the site boundary, target capacity and interconnection preferences.
Share Survey Data
Provide contour or topographic data, soil and geotechnical notes where available.
Layout and Terrain Analysis
The array is arranged against terrain, with row spacing and GCR optimised.
Structural, Civil and Electrical
Racking, foundations, grading, drainage and the DC/AC layout are engineered.
Final Delivery
Layout, structural, civil and electrical documentation are issued together.
What You Need to Send
- Contour or topographic survey data
- Soil and geotechnical notes, where available
- Site boundary information
- Interconnection preferences
Need Professional Solar Design Support?
SurgePV gives your team the software to design solar projects in-house. When a project needs more design capacity than you have, Heaven Designs — our professional services partner — takes it on. One brief, one point of contact.

Delivered by Heaven Designs.Visit site
Often scoped alongside Ground Mount Design
Civil & Structural Engineering
STAAD Pro structural analysis and foundation design for solar.
Explore serviceSite Survey & Feasibility
Contour mapping, soil testing, and geotechnical reports.
Explore serviceMW Scale Project Management
End-to-end project management consultancy for MW-scale solar.
Explore service
The SurgePV platform
Everything above is a service someone else delivers for you. SurgePV is the software your own team designs in — the two are separate, and plenty of customers use both.
Want to see who does the work?
Every service on this site is delivered by Heaven Designs, an engineering practice working with EPCs, installers and developers. Their own site carries their project portfolio, sample drawing sets and the full detail of each discipline.
- Solar design & engineering
- Permit and CEIG documentation
- Civil & structural analysis
- Site survey & feasibility
- MW-scale project management
heavendesigns.inHeaven Designs is a separate company. SurgePV has a commercial partnership with them and links to their site are marked accordingly.
Frequently Asked Questions
What is included in ground-mount design?
Array layout, row spacing, terrain-aware planning, structural and civil coordination, and electrical documentation — all as scoped for the project.
Do you design for utility-scale projects?
Yes. Utility-scale and large C&I ground-mount scopes are supported with the engineering depth those projects need.
What survey data is needed?
Contour or topographic data, soil and geotechnical notes where available, boundary information, and your interconnection preferences.
Can ground coverage ratio and yield be optimised?
Yes. Layouts are built to balance energy performance against constructability and O&M access, rather than optimising yield in isolation.
Are structural calculations provided?
Yes. Structural and civil packages are delivered through the Civil & Structural Engineering service line.
Get a Free Solar Design Quote
Tell us about your ground mount design project and our team will connect you with the right solar design experts.
Scoped, not guessed
Your brief is reviewed before anything is quoted, so the scope matches the project.
One point of contact
Submit through SurgePV and stay with a single thread for the platform and the services.
Your data stays yours
Project details are used to prepare your quote — nothing else.
Delivered by Heaven Designs. Enquiries submitted here are shared with our services partner so they can prepare your quote.
Request received
Thanks — your project brief is with the team. We'll be in touch about scope and the next steps. If you have drawings or site photos to add, reply to the confirmation email.
Browse all solar design services