Software Review10 min read

Energy Toolbase Review: Pros and Cons

Energy Toolbase suits commercial solar and storage developers who need utility rate and battery modeling in proposals. Its own comparison table marks in-app PV panel layout tools with a cross, and it does not publish a price for ETB Developer.

SurgePV publishes this review and sells solar design and proposal software, so we compete with Energy Toolbase. Everything we state about Energy Toolbase comes from its own website, checked October 2026; where it does not publish something we say so. We have not run side-by-side tests. How we evaluate software

Keyur Rakholiya

Written by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

Published Updated Checked October 2026

Pros

Rate database: '120,000+ verified rates' and an in-house utility rates team, per the ETB Developer page
Storage modeling: 'ESS simulations powered by digital twin of our EMS algorithms', with demand response and value stacking
Proposal tools: unlimited proposals, white-labeled designs, open and click tracking, and indicative lender quotes
Names Tesla, Socomec and Sungrow as hardware partners; says ETB Controller is hardware-agnostic
One vendor for modeling, control (ETB Controller), monitoring (ETB Monitor) and consulting
Lists an account manager, tailored training and 'Unlimited support' for ETB Developer

Cons

ETB Developer has no published price; the pricing page asks you to book a 30-minute call
The vendor's own table marks 'In-app PV panel layout tools' with a cross for ETB Developer
The same table marks 'Residential storage modeling' with a cross
ETB Controller and ETB Monitor are priced 'As low as' and by quote; the page names no currency
The vendor's pages show different counts for utility rates and for ETB Controller sites

Quick answer

Energy Toolbase is software for commercial solar and storage developers who need utility rate and battery modeling in proposals. ETB Developer has no published price; you book a 30-minute call. ETB Controller shows 'As low as $34,000' and ETB Monitor 'As low as $4,700', with no currency named. Its own table marks in-app PV layout with a cross. Checked October 2026.

Energy Toolbase (ETB) sells software for solar and energy storage projects. Its main product, ETB Developer, models utility rates, battery storage and project returns, and builds proposals. Its own comparison table marks in-app PV panel layout tools with a cross, so you bring the layout from another tool. It suits commercial developers who need rate and storage modeling. ETB Developer has no published price. SurgePV competes with Energy Toolbase.

Modeling storage and also designing the array?

Book a guided demo to see SurgePV’s layout, shading, yield and financial modeling on your own project.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

SurgePV publishes this page and is a vendor in this category. This page covers Energy Toolbase, which SurgePV competes with. The facts here come from the vendors’ public pages, checked October 2026.

What Energy Toolbase does

Energy Toolbase says it has worked with solar and storage developers since 2014 (“Since 2014, our customer-focused solutions…”). Its company page says it is “backed by Pason Systems.” It sells four products: ETB Developer, ETB Controller, ETB Monitor and ETB Consulting.

ETB Developer: modeling and proposals

The ETB Developer page lists these features.

Utility rates. A utility rate (also called a tariff) is the price list your utility uses to bill power. The page lists:

  • A “Dedicated in-house utility rates team.”
  • A “Comprehensive database with 120,000+ verified rates.”
  • “Time-of-Use modeling.” Time-of-use (TOU) rates change by the hour of the day.
  • “Modeling for NEM programs.” NEM is net energy metering, where you get credit for power you send to the grid.
  • “Support for VNEM, NEMA, and other billing structures.”

The page also shows “281 Rates Updated this Week” and “161 Rates Added this Week.” Its FAQ on the same page says “more than 110,000 real utility rate structures.” The two counts differ, so ask which one is current.

Storage. The page lists “ESS simulations powered by digital twin of our EMS algorithms” and “Demand response participation and value stacking.” ESS is an energy storage system. EMS is an energy management system, the control software for a battery. Demand response means the site cuts or shifts power use when the utility asks. The ETB Developer FAQ says the software can analyze standalone storage, solar plus storage, and grid services. It also says it models demand charge reduction by simulating battery dispatch. A demand charge is a fee based on your highest power use in a billing period. Dispatch means when the battery charges and discharges.

Inputs and finance. The Developer page says you can import usage hour by hour or in fifteen-minute steps, or create a full-year estimate. You can pick your own degradation rates (yearly loss in output) for solar and for batteries. The FAQ lists financing structures: “cash purchases, power purchase agreements (PPAs), loans, and leases.”

Proposals. The page lists “Unlimited Proposals,” “Customized, white-labeled designs,” “Share and track opens and clicks,” “Real-time indicative pricing quotes from lenders,” and “Lead management built for solar and energy storage.”

Support. The page lists “Full access to your account manager,” “Tailored training for your project needs,” and “Unlimited support.”

Cloud and hardware. The FAQ says ETB Developer is “web-based.” It names Tesla, Socomec and Sungrow as hardware partners. ETB’s site also links partner pages for Generac and Sol-Ark.

ETB Controller and ETB Monitor

The ETB Controller page describes an EMS that runs the battery. It lists manual dispatch, demand charge management, PV self-consumption, time-of-use arbitrage (charging when power is cheap and using it when it is dear), DC clipping recapture, backup, and demand response. It says the software regenerates “dispatch forecasts every 15 minutes.” It also says the system is “hardware-agnostic,” which means it works with batteries from different makers.

ETB’s pages give different site counts for Controller. The Controller page banner says “200+ Project Sites.” Its FAQ says “more than 120 commercial and industrial sites.” The company page says “over 150 sites contracted or deployed.” Ask which figure is current if scale matters to you.

The company page says ETB Monitor tracks “real-time performance and savings of solar + storage projects” and connects to ETB’s modeling and control software.

ETB Consulting

ETB Consulting is a service. The pricing page says “Our expert solar and energy storage team handles all project evaluations.” The list of what is included is: Tariff Optimization, Solar PV Design, System Size Optimization, ESS Revenue Optimization, Financial Proforma and DR Revenue. A financial proforma is a projected statement of a project’s income and costs. DR means demand response.

What the vendor’s own table says ETB Developer does not do

The ETB Developer page has a table with three columns: ETB Developer, Excel and Competitors. Read in a browser in October 2026, it shows:

Row ETB Developer Excel Competitors
In-app PV panel layout tools Cross Cross Tick
PV design partnerships with leading design software tools Tick Cross Cross
Residential storage modeling Cross Cross Tick
Real-time indicative pricing quotes from lenders Tick Cross Cross

So ETB Developer works with partner design tools and does not list a layout tool of its own. The company page says ETB Developer “integrated with leading solar design software.” It does not name those tools.

The company page also says ETB released storage modeling that let users model “both residential and commercial ESS projects.” The table marks residential storage modeling with a cross. Ask the vendor which is true today for your project type.

Energy Toolbase public website page, captured 29 October 2026
Energy Toolbase public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Price and plans

ETB Developer has no published price. The other products show “As low as” figures. The currency is not named; only “$” appears. Checked October 2026 on the pricing page.

Product What the page says
ETB Developer “Request Pricing.” “Book 30 minutes with our team. We walk you through a demo and pricing for your team size on the call.” “No credit card needed.” No price is listed.
ETB Controller “As low as $34,000” and “As low as $12,400” both appear in the Controller tab. System sizes start at 100 kWh (Small), 500 kWh (Medium), 1,500 kWh (Large) and 5,000 kWh (Extra-Large). The page lists “ETB Controller with Acumen AI,” “ETB Control Center & Metering Kit” and an “ETB Monitor subscription.” The button is “Get a Quote.” The page does not say which price goes with which size.
ETB Monitor “As low as $4,700.” Includes “Setup & Activation,” “1-Year Subscription” and “Hardware kit.” “Starting at: 1 site meter.” The button is “Get a Quote.”
ETB Consulting No price. “Talk to our Experts.”
Implementation and support packages No price. “Contact Sales.”

Energy Toolbase’s refund policy says it offers free trial periods from time to time. The ETB Developer page has “Get Started” links that go to app.energytoolbase.com. Trial length and terms are not stated on the pricing, ETB Developer, FAQ or Controller pages read in October 2026.

ETB Developer lists no layout tool of its own

Energy Toolbase works with partner design tools. See SurgePV’s design and proposal scope in one demo.

Book a Free Demo
As low as $4,700
ETB Monitor, currency not named
As low as $12,400
ETB Controller, lower figure shown
As low as $34,000
ETB Controller, higher figure shown
30 min
ETB Developer demo and pricing call

Key facts above come from the Energy Toolbase pricing page, checked October 2026.

Who it suits and who should look elsewhere

Energy Toolbase suits you if:

  • You build commercial solar or storage projects and need utility rate modeling in your proposals.
  • Battery dispatch and demand charges drive your project returns.
  • You already have a design tool and want to add rates and storage economics.
  • You want one vendor for modeling, battery control and monitoring.

Look elsewhere, or ask more questions, if:

  • You need panel layout in the same app. The vendor’s table marks it with a cross.
  • You work on residential storage. The table marks residential storage modeling with a cross.
  • You need a published price for ETB Developer before you talk to sales.
  • You want to try the software on your own first. A trial is not stated on the pages read.

Compared with SurgePV

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV competes with Energy Toolbase. SurgePV facts come from SurgePV’s pricing page and published product scope.

Topic Energy Toolbase SurgePV
Main job Utility rates, storage simulation and proposals; PV layout through partner design tools Design side: roof modeling, array layout, shading, yield, financial modeling, electrical workflow support, bill of materials and proposals
PV layout ETB Developer table: “In-app PV panel layout tools” marked with a cross Solar array layout is in SurgePV’s published scope
Storage and tariffs Rate database, storage simulation, demand response SurgePV’s published scope does not list battery dispatch modeling or a utility rate database
Price ETB Developer: no published price USD per user per year: $1,899 (1 user), $1,499 (3 seats), $1,299 (5 seats)
How to try it Book a 30-minute demo call; trial not stated Guided demo; no self-serve trial

See how SurgePV handles your projects

Book a guided demo and bring one of your own project types.

Book a Free Demo

Guided demo. SurgePV does not offer a self-serve trial.

Bottom line

Energy Toolbase fits commercial solar and storage developers who need a large utility rate database, storage simulation and lender quotes inside proposals. Look elsewhere if you need in-app panel layout, residential storage modeling, or a price before a sales call. For design plus proposals from a published price, book a SurgePV demo or read the SurgePV pricing page.

Other options

Frequently asked questions

How much does Energy Toolbase cost?

Energy Toolbase does not list a price for ETB Developer. Its pricing page says ‘Book 30 minutes with our team’ and that you get pricing for your team size on the call. For ETB Controller it shows ‘As low as $34,000’ and ‘As low as $12,400’. For ETB Monitor it shows ‘As low as $4,700’. No currency is named. Checked October 2026.

Does Energy Toolbase do solar design?

ETB Developer does not lay out panels in the app. Its comparison table marks ‘In-app PV panel layout tools’ with a cross and lists ‘PV design partnerships with leading design software tools’ with a tick. Its ETB Consulting service lists ‘Solar PV Design’ among the work its team does.

Energy Toolbase vs Aurora Solar: what is the difference?

They start from different jobs. Aurora’s pricing page describes its Basic plan as tools for residential design and sales, with 3D visualizations, financial analysis and automatic system design. Basic is $159 per user per month, or $135 billed annually, and Premium adds battery storage modeling. Energy Toolbase leads with utility rates, storage modeling and proposals, and does not publish a price for ETB Developer.

Who is ETB Developer designed for?

Energy Toolbase lists developers of commercial solar and energy storage projects, consultants who rely on financial modeling, financiers, enterprise companies, independent power producers and EPC firms. Its comparison table marks residential storage modeling with a cross. Ask the vendor if residential work is in your plan.

What are the alternatives to Energy Toolbase?

It depends on which part of the job you need. For modeling tools, see our list of Energy Toolbase alternatives. For a direct comparison, see Energy Toolbase vs SurgePV. SurgePV competes with Energy Toolbase and is design-side, with no battery dispatch modeling in its published scope.

Sources

All pages were read in a browser on 28 October 2026. Facts about Energy Toolbase come from Energy Toolbase’s own website only.

About the Contributors

Author
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

See how SurgePV handles design and proposals

SurgePV is solar design and proposal software covering 3D roof modeling, solar array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. Book a guided demo to see it on your own project.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.