Solar Designing

Solar Design Software Built for Complex Roofs

Replace AutoCAD, PVsyst, and your proposal tool with one solar system design software. AI generates 3D roof models in 60 seconds. Auto-place panels, run shading analysis, and export permit-ready SLDs — all without switching platforms.

0%

Faster design time with AI roof generation

0 min

Average time for a complete system design

0 MW

Single rooftop project capacity supported

AI-Powered

AI Roof Modeling That Simplifies Solar Design

Our solar design software combines AI-powered 3D roof modeling, automated module placement, and real-time shading analysis in a single workflow. Whether you are working on a residential gable roof or a 10 MW commercial flat roof, SurgePV generates install-ready layouts with bankable yield data attached — no separate simulation tools needed. Learn more about solar design principles that drive better project outcomes.

SurgePV builds the 3D roof model from imagery automatically, so a multi-tilt residential layout is a review-and-adjust job rather than a drafting job.

Automatic AI Roof Generation

Generate complete, accurate roof models automatically with our AI engine. Based on internal time trials with 200+ solar design teams, SurgePV reduces design time by up to 70% compared to manual drafting in AutoCAD or SketchUp while maintaining precision within 3% of field measurements for complex structures. This level of design automation frees teams to focus on client relationships.

Satellite-to-3D in 60 Seconds

Choose from multiple high-resolution mapping providers including Google 3D, Near Map, Esri, and Bing to ensure pixel-perfect site assessments.

Custom Geometry Handling

Design around dormers, pitched roofs, and complex architectural features with specialized tools that ensure accurate solar layouts on any structure.

Design Tools

Intuitive Controls for Faster, Smarter Layouts

Take complete control of your design process with intuitive tools that adapt to your specific project requirements and workflow preferences. See our panel layout design guide for best practices.

Automated module placement replaces the hand-drafting step: set setbacks and row spacing once, and the layout regenerates whenever the roof or module changes.

Versatile Module Placement

Streamline panel layouts with automatic arrangement tools or add modules manually with fill face and subarray options to optimize energy production.

Intuitive Editing Tools

Enhance design flexibility with our lasso tool for seamless panel manipulation and precise measurements to ensure code compliance and optimal aesthetics.

Multi-Surface Compatibility

Handle any project with specialized tools for flat roofs, shed roofs, pitched structures, and custom faces - all within a single, powerful platform.

Visualization

Stunning 3D Views That Impress Clients

Switch perspectives, verify compliance, and present designs at any scale - all from one unified platform.

A shaded 3D view of the customer’s own roof answers the questions that stall approvals — where panels sit, what shades them, and what the array will actually produce.

Interactive 2D/3D Views

Switch between different perspectives to provide clients with immersive project presentations that help clients visualize the project and approve faster.

Fire Safety Compliance

Automatically identify and maintain code-compliant safety paths on rooftops, ensuring designs meet regulatory requirements without sacrificing production.

Enterprise-Scale Capability

Design with confidence on projects of any size - from residential installations to commercial systems up to 10MW on a single rooftop - without performance limitations. Pair designs with financial modeling to deliver complete project proposals.

Evidence-first evaluation

What Solar Professionals Say

SurgePV does not publish customer names, quotations, or performance outcomes without retained consent and substantiation. Use a representative project during a guided demonstration and validate workflow, outputs, assumptions, and fit against your own requirements.

What is PV system design software?

PV system design software is a digital tool that lets solar professionals model rooftops, place photovoltaic panels, run shading analysis, and generate permit-ready drawings. SurgePV combines all of these steps in one cloud platform so EPCs and installers do not need separate CAD, simulation, and proposal tools.

How does solar design software work?

Modern solar design software uses satellite imagery and AI to build 3D roof models in seconds. Designers then add modules, run shade simulations, size strings, and export SLDs and BOMs. SurgePV automates compliance checks and connects the design directly to financial modeling and branded proposals.

Why do EPCs choose SurgePV for solar design?

EPCs choose SurgePV because it replaces four or more disconnected tools with one platform. Designs that took hours in AutoCAD and PVsyst now take minutes. The result is fewer errors, faster permits, and proposals that close on the first visit.

Frequently Asked Questions

How does SurgePV ensure design accuracy?

SurgePV uses high-resolution imagery, auto-roof detection, and inbuilt compliance rules to deliver code-ready designs. Every layout factors in setbacks, tilt, azimuth, and fire pathways to ensure precision. This reduces errors, accelerates permitting, and makes it a reliable software for solar design trusted by EPCs.

Can I model complex rooftops with this PV design software?

Yes. SurgePV handles irregular rooftops with dormers, multi-tilts, and custom roof planes. Unlike legacy software, it balances speed with accuracy for both simple and complex projects.

Does SurgePV include compliance with local codes?

SurgePV applies the fire setback, electrical and national-standard rules you select to the layout as you design, and flags placements that break them. It reduces the rework that surfaces at approval, but the stamped design remains the responsibility of the engineer of record.

How fast can I create a complete design?

Design time depends on roof complexity, but the repetitive steps are automated: module placement, stringing logic and BOM generation all run from the same roof model, so the manual work is reviewing and adjusting rather than drafting from scratch.

Can SurgePV replace my current design tools?

Yes. SurgePV consolidates layouts, shading, BOMs, and proposals into one workflow. Instead of juggling separate design, drafting, and spreadsheet tools, EPCs can design, analyze, and sell from one platform, reducing costs and complexity.

Can solar design software replace AutoCAD?

For solar-specific layouts, yes. SurgePV generates permit-ready SLDs, roof plans, and BOMs without manual drafting. While AutoCAD remains useful for structural or architectural drawings, most EPCs find that SurgePV covers every solar design deliverable faster and with fewer errors.

How accurate is AI roof modeling versus manual surveys?

SurgePV builds the roof model from high-resolution imagery and elevation data, then lets you correct planes, ridges and obstructions before the layout is generated. For roofs where dimensional accuracy is critical, verify the model against a site measurement before issuing the design.

Design More. Sell More. Build More.

See how SurgePV connects solar design, simulation, financial analysis, and proposals in one workflow.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.