Solar Civil & Structural Engineering
Structural analysis and civil engineering for solar structures — STAAD Pro analysis, foundation design, and the mounting and building structures a plant needs to stand up.
Delivered by Heaven Designs, SurgePV's trusted solar design partner
What Is Solar Civil & Structural Engineering?
This is the engineering that establishes whether a solar structure carries its loads and stays where it was put. It covers the mounting system, the foundations under it, and the buildings that house inverters and control equipment.
Analysis is produced in STAAD Pro alongside standard engineering methodology, with the aim of designs that are both safe and cost-optimised rather than over-specified by default.
Design follows the codes and standards specified for the project — for example ASCE-based wind and snow criteria in US markets — and the applicable code set is confirmed at kickoff rather than assumed.
Engineering Services
STAAD Pro Analysis
Structural analysis of solar mounting structures and their foundations, produced in STAAD Pro.
Foundation Design
Pile, raft and isolated footing designs matched to the soil conditions on site.
PEB Structure Design
Pre-engineered buildings for inverter rooms, control rooms and equipment shelters.
MS/GI Mounting Structures
Mild steel and galvanised iron mounting structure design for rooftop and ground-mount arrays.
Code-Specific Criteria
Design to the project's specified codes and standards, confirmed at kickoff.
Combined Packages
Structural work delivered alongside electrical and layout drawings where the EPC scope calls for it.
Built for Teams That Need Structural Depth on Demand
EPC Companies
Bring in structural analysis for a specific project instead of carrying it year-round.
Utility-Scale Developers
Get foundations designed against the soil conditions actually found on site.
Engineering Firms
Extend structural capacity during peak load while keeping review in-house.
Commercial Solar Companies
Confirm that an existing roof or structure takes the array before committing to it.
How It Works
Submit Project
Send the structure type and the structural scope you need covered.
Share Project Information
Provide site data, load criteria, soil notes where available and array layout assumptions.
Confirm Code Basis
The applicable codes and standards for the project are agreed at kickoff.
Analysis and Design
STAAD Pro analysis is run and foundations and structures are designed against it.
Final Delivery
Structural drawings and calculations are issued, on their own or inside a wider package.
What You Need to Send
- Site data
- Structure type
- Load criteria
- Soil notes, where available
- Array layout assumptions
Tools and Standards
- STAAD Pro
- ASCE-based criteria in US markets
- Project-specified codes confirmed at kickoff
Need Professional Solar Design Support?
SurgePV gives your team the software to design solar projects in-house. When a project needs more design capacity than you have, Heaven Designs — our professional services partner — takes it on. One brief, one point of contact.

Delivered by Heaven Designs.Visit site
Often scoped alongside Civil & Structural Engineering
Ground Mount Design
Utility-scale ground mount design with terrain analysis.
Explore serviceRooftop Detailed Engineering
Detailed engineering packages for rooftop solar projects.
Explore serviceSite Survey & Feasibility
Contour mapping, soil testing, and geotechnical reports.
Explore service
The SurgePV platform
Everything above is a service someone else delivers for you. SurgePV is the software your own team designs in — the two are separate, and plenty of customers use both.
Want to see who does the work?
Every service on this site is delivered by Heaven Designs, an engineering practice working with EPCs, installers and developers. Their own site carries their project portfolio, sample drawing sets and the full detail of each discipline.
- Solar design & engineering
- Permit and CEIG documentation
- Civil & structural analysis
- Site survey & feasibility
- MW-scale project management
heavendesigns.inHeaven Designs is a separate company. SurgePV has a commercial partnership with them and links to their site are marked accordingly.
Frequently Asked Questions
What structural services are provided for solar?
Foundation design, structural analysis including STAAD Pro, PEB, MS and GI structure calculations, and the associated civil packages.
Do you cover rooftop as well as ground mount?
Yes. Scope can cover rooftop mounting systems and ground-mount foundations, as scoped for the project.
Which wind and snow codes are followed?
Design follows the codes and standards specified for the project — ASCE-based criteria in US markets, for example — and these are confirmed at kickoff.
Can structural work be delivered with electrical drawings?
Yes. EPC packages frequently bundle civil and structural work with electrical and layout drawings.
What inputs are required?
Site data, structure type, load criteria, soil notes where available, and array layout assumptions.
Get a Free Solar Design Quote
Tell us about your civil & structural engineering project and our team will connect you with the right solar design experts.
Scoped, not guessed
Your brief is reviewed before anything is quoted, so the scope matches the project.
One point of contact
Submit through SurgePV and stay with a single thread for the platform and the services.
Your data stays yours
Project details are used to prepare your quote — nothing else.
Delivered by Heaven Designs. Enquiries submitted here are shared with our services partner so they can prepare your quote.
Request received
Thanks — your project brief is with the team. We'll be in touch about scope and the next steps. If you have drawings or site photos to add, reply to the confirmation email.
Browse all solar design services