solar sales
Solar Quoting Best Practices: Markup and Margin
Solar quoting best practices for installers and EPCs: what a quote must include, markup vs margin, financing options and follow-up that closes without discounting.
Blog archive
Browse older SurgePV articles. Each archive page is intentionally limited to keep transfer size, parsing cost, and crawl depth predictable.
solar sales
Solar quoting best practices for installers and EPCs: what a quote must include, markup vs margin, financing options and follow-up that closes without discounting.
solar sales
Solar sales objection handling scripts for cost, timing, trust and roof objections, plus a 48-hour follow-up plan and post-tax-credit talking points.
solar sales
The 9 solar sales pipeline stages defined, with an exit criterion for each, planning ranges per stage, and how to find where deals stall.
solar business
Adapt a ten-section solar scope of work worksheet for deliverables, exclusions, change review, payment events and project-specific acceptance conditions.
solar installation
Use this solar site survey checklist to capture roof, shading, electrical and access evidence, and to hand a clean record to the designer.
solar business
Solar software buyer's guide for installers: the 9 questions to ask, pricing models, a 2-week trial method and ROI math to run before you sign.
solar design
Design solar plus storage: size the battery from critical loads, choose AC or DC coupling, plan the backup panel and check NEC 706 rules, with worked examples.
solar sales
Solar survey-to-proposal workflow, step by step: what to capture on site, how to hand off to design, suggested turnaround targets and common failure points.
solar sales
How to respond to solar tenders and RFPs: document anatomy, compliance matrices, bid security, public vs private rules, and submission mechanics.
solar policy
UAE rooftop solar rules by emirate: DEWA Shams Dubai, Abu Dhabi, approved contractors, connection standards and why exports earn credits.
solar policy
The 30% federal residential solar tax credit expired on December 31, 2025. This guide explains what changed under OBBBA, what credits remain, and how to model solar ROI in 2026.
solar policy
Commercial solar tax credit under Section 48E: 30% base ITC, adders up to 50%, the 2027 placed-in-service deadline, depreciation and ownership structures.
solar sales
WhatsApp for solar sales: scripts for each pipeline stage, broadcast and status tips, Business API automation, and Meta opt-in rules for solar EPCs.
solar sales
Win commercial solar bids: a 4-gate bid/no-bid check, bottom-up pricing with a margin floor, response structure evaluators score, and BAFO tactics.
solar design
Central inverter design guide 2026: sizing, MPPT voltage windows, DC/AC ratios, cooling, grid codes, and when to choose central over string inverters.
solar design
Flow battery solar storage design: when to specify vanadium redox over lithium-ion, how to size power and energy separately, and which standards to check.
solar design
Lead acid battery solar storage design: size flooded, AGM and tubular banks with DoD, autonomy and temperature corrections, plus a worked example.
solar design
Build a solar 3D site model with reliable survey inputs, clear accuracy checks and coordinated shading assumptions before final design or permitting.
solar design
Solar air mass explained: why AM1.5G rates PV modules, the formulas to calculate it by site and altitude, and worked examples for Denver and Mumbai.
solar business
Calculate solar churn rate with clear cohort formulas, distinguish cancellations from missed upgrades, and build a practical retention dashboard.
solar design
Clearness index (Kt) is GHI divided by extraterrestrial irradiance. See the formula, a worked example, documented PVsyst and pvlib limits, and common mistakes.
solar sales
Solar close rate explained: how to calculate it, which benchmarks are published, and a 90-day plan to close more of the leads you already have.
solar sales
Solar consultation booking bridges lead generation and a signed contract. Learn how to qualify, schedule, confirm, and hand off each consultation.
solar installation
A solar continuity test proves earth and bonding paths are complete before a PV system is energized. Steps, meters, limits and how to check DC strings.