Quick answer
What is the best alternative to Energy Toolbase? It depends on what you want to change. HOMER Grid suits battery and rate studies at a published $4,200 per year. Aurora Solar, Enact, HelioScope, OpenSolar and SurgePV add design tools. Energy Toolbase does not publish its ETB Developer price. Checked October 2026.
Energy Toolbase (ETB) sells ETB Developer. It is a web tool that models solar and battery projects and builds proposals. The right alternative depends on what you want to change: the missing public price, the missing panel layout tool, battery and rate depth, or a sales pipeline.
SurgePV publishes this page and is a vendor in this category: it sells solar design software, so it competes with several tools below, and SurgePV is one of the seven. The facts here come from the vendors’ public pages, checked October 2026. We have not compared the products side by side on a live project.
Criteria used: published price, panel layout, battery and utility rate modelling, proposals, and how you can try the product.
Looking for an Energy Toolbase alternative with a design tool?
Book a guided demo and see SurgePV handle layout, shading, yield, financial modeling and proposals on your own project.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Which tool fits which need?
Five picks, by situation
- Battery and utility rate studies with a published price: HOMER Grid. Its pricing page lists $4,200 per year for one user on the annual plan. It imports PV production data from a solar modelling tool such as HelioScope or PVsyst.
- Commercial layout with storage and financial modelling: HelioScope on the Pro plan, listed at $2,640 per license per year. The Pro plan lists storage modelling, financial modelling and sales proposals.
- Design, rates and proposals from one vendor, mostly residential: Enact. Its plan lists unlimited residential projects and proposals, and 10 new commercial projects per month.
- A free core app: OpenSolar. It describes its core app as “Free of charge”. API Access and supported connectors are charged from 16 April 2026.
- Layout, shading, yield, financial modelling and proposals in one product, priced per user: SurgePV, at $1,899 per user per year for 1 user. Access starts with a guided demo, not a self-serve trial.
Aurora Solar and Sunbase Data fit narrower cases. Aurora describes its Basic plan as “essential tools for residential design and sales”. Sunbase Data is a sales and project platform. Their entries are below.
The options at a glance
Listed alphabetically. This is not a ranking; pick by the situation above. Energy Toolbase is the first row only so you can compare.
| Tool | Best for | Price as published (checked October 2026) | One scope fact |
|---|---|---|---|
| Energy Toolbase (the tool you compare against) | Solar and battery proposals with deep rate modelling | ETB Developer: not published (“Request Pricing”). Pricing page | 120,000+ verified rates. Its own table shows a cross for in-app PV layout tools |
| Aurora Solar | Residential design and sales | Basic $159 per user per month, or $135 per user per month billed annually. Premium $259, or $220 billed annually. Pricing page | Battery storage modeling is listed on Premium |
| Enact Solar | Design, rates and proposals from one vendor | Design & proposals: “$279 / month billed annually” (or “$299/month – 2 users”). Pricing page | Unlimited residential projects; 10 new commercial projects per month |
| HelioScope | Commercial layout and yield | Basic $159 USD per license per month, or $1,620 USD per year. Pro $259 per month, or $2,640 per year. Pricing page | Storage and financial modelling are listed on Pro |
| HOMER Grid | Battery, tariff and demand charge studies | Annual plan $350 per month (“$4,200/yr”). Monthly plan $665 per month. Pricing page | Imports PV production data from HelioScope or PVsyst |
| OpenSolar | A free core app | Core app “Free of charge”. API Access and connectors are charged from 16 April 2026. Home page | Design, sell and manage projects in one app |
| Sunbase Data | Sales and project pipeline | “Plans start from $59 per user per month”. Pricing page | Modules include CRM, proposals and project management |
| SurgePV | Layout, shading, yield, financial model and proposals | $1,899 per user per year (1 user). $1,499 (3 seats) and $1,299 (5 seats), each per user per year. Pricing page | Guided demo. No self-serve trial |
Each price is in the unit and currency the vendor shows. Where a page shows only “$”, the vendor does not name the currency. Taxes are not added. Compare tools in one unit, such as dollars per user per year, before you decide.
- Aurora Basic (per user, billed annually)$1,620
- Aurora Premium (per user, billed annually)$2,640
- HelioScope Basic (per license)$1,620
- HelioScope Pro (per license)$2,640
- SurgePV (1 user)$1,899
- HOMER Grid (annual plan, 1 user)$4,200
Source: vendor pricing pages, checked October 2026.
Energy Toolbase, Enact, OpenSolar and Sunbase Data are not charted: ETB Developer has no published price, Enact and Sunbase publish monthly or starting figures with different terms, and OpenSolar’s core app is free. Bars are not like-for-like, because limits and scope differ.
What does Energy Toolbase publish?
We read four Energy Toolbase pages in October 2026: the pricing page, the ETB Developer page, the ETB Developer FAQ and the comparison with spreadsheets.

What ETB Developer does. The FAQ says it is web-based. It can model standalone storage, solar plus storage, and grid services. It compares cash, power purchase agreement (PPA), loan and lease financing. It models demand charge cuts by simulating battery dispatch. A demand charge is a utility fee based on your highest power peak. The page also lists unlimited proposals, white-labeled designs, and tracking of proposal opens and clicks. It lists lead management too.
Utility rates. ETB says it has a dedicated in-house utility rates team and “120,000+ verified rates”. Its comparison table marks both as ticks for ETB Developer.
Price. ETB does not publish an ETB Developer price. The pricing page shows “Request Pricing”. It says you get pricing for your team size on a 30-minute demo call, and that no credit card is needed. Implementation and support packages are listed separately.
The page does show prices for two other products. ETB Controller is “As low as $34,000” and also “As low as $12,400”. The $12,400 figure goes with the smallest size in the page’s size picker, 100 kWh. ETB Monitor is “As low as $4,700” for setup, a one-year subscription and a hardware kit. No currency is named. ETB Controller and ETB Monitor control and watch batteries and other assets. This page compares the modelling and proposal side, ETB Developer.
Panel layout. The ETB Developer page has a table that compares ETB Developer, Excel and “Competitors”. It uses only ticks and crosses. In the page code, ETB Developer has a cross for “In-app PV panel layout tools” and a cross for “Residential storage modeling”. It has a tick for “PV design partnerships with leading design software tools”. So layout happens in a partner design tool. The ETB Developer page also names Tesla, Socomec and Sungrow as hardware partners whose batteries you can model.
Reasons to compare, from ETB’s own pages:
- The ETB Developer price is not public.
- The comparison table shows no in-app layout tool.
- The same table shows a cross for residential storage modeling.
Where ETB is strong. Its own pages list 120,000+ verified rates, battery simulation, demand response value stacking and indicative lender quotes. If those decide your deals, check each tool below against that list before you switch.
The seven options, A to Z
Aurora Solar
Best for: teams that sell residential solar and want design and proposals in one tool. Aurora describes its Basic plan as “essential tools for residential design and sales”.
Not the right choice if: you need more than one user or more than 50 projects a month on a standard plan. Basic and Premium list 1 user and 50 projects per month. Enterprise is custom.
What the vendor documents: 3D roof modeling and trees, performance simulation, web and PDF proposals, integrated and custom financing, and a utility rate database listed as “Custom and integrated”. Premium adds LIDAR-assisted modeling, bankable shade reports, and battery storage modeling for backup, self-consumption and arbitrage. Aurora’s menu lists HelioScope under Commercial.
Price: Basic $159 per user per month billed monthly, or $135 per user per month billed annually. Premium $259 per user per month billed monthly, or $220 per user per month billed annually. Enterprise is “Custom per project”. The page says annual plans carry a one year commitment, and monthly plans have no minimum commitment. Source: aurorasolar.com/pricing, checked October 2026.
Switch from Energy Toolbase if: layout and residential proposals matter more to you than rate depth.

Enact Solar
Best for: teams that want design, rates and proposals from one vendor, mostly on residential work.
Not the right choice if: you build many commercial projects. The Design & proposals plan lists “10 new commercial projects per month”.
What the vendor documents: on its pricing page, “Solar + Storage Design”, custom proposals, pricing and a bill of materials (BOM, the parts list), and API integration support. On its providers page, 3D designs with roof detection and shading analysis, storage sizing, time-of-use simulations, rates “in any zip code”, and loan, lease and PPA options. It also lists a dashboard of all installed systems in its Asset Management product.
Price: Design & proposals is “$279 / month billed annually - save $240/yr (Or $299/month – 2 users)”. The page does not say what the “2 users” refers to, so ask Enact. Two engineering plans cost “$267 / month billed annually” (PVCAD plug-in, for teams that already hold a CAD license) and “$333 / month billed annually” (bundle that includes the CAD license). Asset Management says “Contact Us for Pricing”. Source: enact.solar pricing, checked October 2026. The providers page shows “Start Trial” buttons and does not state a trial length.
Switch from Energy Toolbase if: you want design, rates and proposals together, and your work is mostly residential.

HelioScope
Best for: commercial layout and yield studies in the browser. HelioScope is an Aurora Inc. product, as its page footer says.
Not the right choice if: you need rate and financial tools on the entry plan. Basic lists 1 user, 10 projects per month, 120 projects per year, and designs up to 1.25 MW (DC). The Utility Rate Editor, financial analysis tools and sales proposals are listed under Pro and Enterprise.
What the vendor documents: rooftop, carport, ground mount and battery layout on all projects, CAD export, single-line diagrams (simple drawings of how the system is wired), an 8760 production report (yield for each hour of the year) and shade reports. Pro adds storage modelling, financial modelling and sales proposals, and designs up to 5 MW (DC).
Price: Basic $159 USD per license per month, or $1,620 USD per license per year. Pro $259 USD per license per month, or $2,640 USD per license per year. Enterprise is “Custom per-project pricing”. Each license includes 1 user. Source: helioscope.aurorasolar.com/pricing, checked October 2026. The page shows a “Free Trial” button and does not state a trial length.
Switch from Energy Toolbase if: you want commercial layout and some storage and financial modelling in one tool, and you do not need ETB’s rate database.

HOMER Grid
Best for: battery, tariff and demand charge studies for grid-connected sites, including EV charging. A tariff is a utility’s rate plan. HOMER Grid is a UL Solutions product.
Not the right choice if: you want to draw panel layouts. The two HOMER pages we read list no layout tool. They describe importing PV production data from a solar modelling tool such as HelioScope or PVsyst.
What the vendor documents: a tariff database and tariff builder, with “Genability’s over 35,000 commercial and industrial utility tariffs database” for the U.S., Canada and Mexico. It lists demand charge reduction, value stacking, EV charging, resilience, and client-facing proposal reports. The two vendors publish different counts, so test both on your own utility.
Price: The annual plan is $350 per month (“$4,200/yr, auto-renews”), for one user. It includes 6-hour instructor-led training and a second computer activation. The monthly plan is $665 per month (“$7,980/yr, auto-renews”), with 6-hour training for $500 extra. Enterprise says “Contact us for pricing”. Source: homerenergy.com pricing, checked October 2026. The page shows “Try It Free” and does not state a trial length.
Switch from Energy Toolbase if: battery and rate studies are the reason you use ETB, and you want a price you can see.

OpenSolar
Best for: teams that want a free core app to design, sell and manage projects.
Not the right choice if: you connect OpenSolar to other tools. OpenSolar’s post of 16 February 2026 says charges for API Access and supported connectors start on 16 April 2026. Paid Enterprise Services also exist: Support is US$500 per month and Customize is US$1,350 per month.
What the vendor documents: OpenSolar describes its software as a way to design, sell and manage projects. Its menu lists Auto Design, Single Line Diagrams, Integrated Finance and a Project Management CRM. The vendor says the core app stays free for work done inside the app.
Price: The home page shows “100%” next to “Free of charge”. Source: opensolar.com, checked October 2026.
Switch from Energy Toolbase if: you want to remove a design-tool fee. Check its rate and battery features against your projects first.

Sunbase Data
Best for: solar contractors who need a sales and project platform. Sunbase serves solar, roofing and construction firms.
Not the right choice if: you want a fixed list price or battery modelling. The pricing page says Sunbase does not use fixed pricing tiers. The page does not list battery or tariff modelling.
What the vendor documents: modules that “may include” contractor CRM and sales management, proposal and estimation, project management, inventory and asset management, financial tools, and reporting dashboards.
Price: “Plans start from $59 per user per month, with pricing customized based on your requirements.” The page does not state the billing period. Source: sunbasedata.com/sunbase-pricing, checked October 2026.
Switch from Energy Toolbase if: your gap is leads and project tracking. ETB Developer also lists lead management, so compare the two first.

SurgePV
Best for: teams that want roof modelling, panel layout, shading analysis, energy-yield modelling, financial modelling, electrical workflow support, bill-of-materials output and proposals in one product. This is SurgePV’s published scope. See its pages on 3D design and layout, shading analysis, yield and financial modelling and proposals.
Not the right choice if: you need battery dispatch simulation, a utility rate database, or battery controls and monitoring. SurgePV’s published scope does not list them. Also look elsewhere if you want a self-serve trial, because SurgePV offers a guided demo. The product scope SurgePV publishes does not list a CRM.
Limits SurgePV states: results depend on source data, assumptions, equipment models, configuration and review. Outputs support design and documentation work. They do not replace approval by the responsible engineer, authority, lender, insurer or utility.
Price: Individual $1,899 per user per year (1 user). 3 seats $1,499 per user per year. 5 seats $1,299 per user per year. Confirm taxes and contract terms in your quote. Source: surgepv.com/pricing.
Switch from Energy Toolbase if: having layout and proposals in one product matters more to you than rate and battery depth.
Want layout and proposals in one product?
Bring one of your own projects to a guided SurgePV demo and check the outputs and the fit.
Book a Free DemoChecking cost first? See the SurgePV pricing page.

How do you choose?
Answer these four questions in order. The first clear yes points to your pick.
1. Do utility rates or battery dispatch decide your deals? Stay with Energy Toolbase, or test HOMER Grid on your own utility. Compare them on a real project before you move.
2. Do you want a design tool in the same product? Look at Aurora Solar, Enact, HelioScope, OpenSolar and SurgePV. Check each one against your project size. Residential and commercial limits differ by plan.
3. Is price the problem? Energy Toolbase does not publish an ETB Developer price, so ask for a quote and compare in one unit, such as dollars per user per year. The other tools publish the figures above.
4. Is your gap leads and project tracking? Look at Sunbase Data. ETB Developer also lists lead management, so check that too.
Bottom line
Pick HOMER Grid for rate and battery studies you can price, pick a design tool if layout is what ETB lacks, and stay with Energy Toolbase if its 120,000+ verified rates decide your deals. To see SurgePV on your own project, book a demo or check the SurgePV pricing. See also the Energy Toolbase vs SurgePV comparison and the Energy Toolbase review.
Sources
Vendor pages, checked October 2026.
- Energy Toolbase: pricing, ETB Developer, ETB Developer FAQ, ETB vs. spreadsheets
- Aurora Solar: pricing
- Enact: pricing, providers page
- HelioScope: pricing
- HOMER Grid: pricing, product page
- OpenSolar: home page, Enterprise Services, API and connector charges
- Sunbase Data: pricing
- SurgePV: pricing