
Quick answer
Energy Toolbase and HOMER Grid both model solar and storage economics. Energy Toolbase's site cites 120k+ monitored utility rates and adds controls and monitoring; UL Solutions says HOMER Grid has tariff structures for over 90% of zip codes in the US, Canada and Mexico, with demand charge management. Neither lists a price. Pick by workflow and ask for a trial project. Checked November 2026.
Comparing Energy Toolbase with HOMER Grid?
If your work starts with design and proposals, book a SurgePV demo to see how it handles layout, shading and financial modeling before you add a tariff tool.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
SurgePV publishes this page and is a vendor in this category. SurgePV is not one of the two products compared here; it appears only as a third option. The facts come from the vendors’ public pages, checked November 2026.
Energy Toolbase vs HOMER Grid: how do they compare?
Both target storage and tariff economics. The vendors describe their reach in different ways, so compare them on a real project.
| Energy Toolbase | HOMER Grid (UL Solutions) | |
|---|---|---|
| Positioning | Financial analysis for solar and storage, plus controls and monitoring | Platform for optimizing EV charging and renewable energy projects |
| Tariff coverage | “120k+ Utility Rates Monitored” | “Utility tariff structures for more than 90% of the zip codes in the U.S., Canada and Mexico” |
| Demand charges | Not detailed on the page read | “Minimize costs through precise demand charge management” |
| Storage | ETB Controller for storage control; Developer for storage analysis | “advanced on-site generation and storage modeling” |
| Proposals | “3M+ Proposals Generated” | Page implies sales teams can create customer proposals; not detailed |
| Price | Not published; given on a call | Not published; “Schedule a demo” |
Sources: both vendors’ pages, read November 2026. Figures are the vendors’ own and use different measures (rate count versus zip-code coverage), so they are not directly comparable.
Energy Toolbase

Energy Toolbase lists ETB Developer, Controller, Monitor and Consulting. The Controller is the part that operates storage; the others model and monitor.
Pros: modeling, control and monitoring from one vendor. Cons: no published price; the page read does not describe site design.
HOMER Grid

UL Solutions describes HOMER Grid for EV charging and renewable projects, including demand charge management and on-site generation and storage modeling. The page does not state pricing or an explicit storage-sizing feature.
Pros: explicit demand charge and EV charging focus; broad tariff coverage across three countries. Cons: no published price; the page read does not detail dispatch or proposals.
How much do Energy Toolbase and HOMER Grid cost?
Neither vendor publishes a price on the pages read. Energy Toolbase quotes pricing on a call; HOMER Grid’s page offers a demo. SurgePV’s public price is USD per user per year: $1,899 for one user, $1,499 per user for three seats and $1,299 per user for five seats (SurgePV pricing page, November 2026).
- SurgePV, 1 user$1,899
- SurgePV, 3 seats$1,499
- SurgePV, 5 seats$1,299
Source: SurgePV pricing page (Energy Toolbase and HOMER Grid publish no price on the pages read), checked November 2026.
Need the design side of the project too?
SurgePV lists 3D roof modeling, layout, shading, yield, financial modeling and proposals in its scope.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Who should pick which?
- Pick Energy Toolbase if you also want controls and monitoring in the same family.
- Pick HOMER Grid if EV charging and demand charge management drive your projects.
- Use both only if a customer needs a second opinion on tariff modeling.
- Consider SurgePV if you need design, shading and proposals first, with financial modeling in the same subscription.

SurgePV’s public scope, per its product claims, is 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. Outputs support design work and do not replace sign-off by the responsible engineer, authority, lender or utility.
Bottom line
Energy Toolbase and HOMER Grid overlap on storage economics, so the choice is workflow, coverage for your utilities and quote. For design-led teams, book a SurgePV demo or see SurgePV pricing. Related: the Energy Toolbase review, the HOMER review, Energy Toolbase alternatives and the demand charge glossary entry.
Sources
- Energy Toolbase homepage: products, rates figure. Checked November 2026.
- Energy Toolbase pricing page: pricing on a call. Checked November 2026.
- UL Solutions HOMER Grid page: demand charges, tariff coverage, storage modeling, demo call to action. Checked November 2026.
Frequently asked questions
Is Energy Toolbase better than HOMER Grid?
Neither is clearly better; the vendors describe overlapping jobs differently. Energy Toolbase cites 120k+ monitored rates plus controls and monitoring, while HOMER Grid cites tariffs for over 90% of zip codes in three countries (checked November 2026). Test both on one project.
Does HOMER Grid handle demand charges?
Yes, per UL Solutions. The HOMER Grid page says it can minimize costs through precise demand charge management. It does not publish pricing or detail dispatch (checked November 2026).
How much does HOMER Grid cost?
UL Solutions does not publish HOMER Grid pricing on the page read; the call to action is Schedule a demo. Ask for a written quote naming the license type and term (checked November 2026).
How much does Energy Toolbase cost?
Energy Toolbase does not publish ETB Developer pricing. Its page says pricing for your team size is covered on a call (checked November 2026).
Which is better for EV charging projects?
HOMER Grid describes EV charging optimization as a core use. Energy Toolbase’s homepage does not mention EV charging, so confirm with the vendor if that is your focus (checked November 2026).
What if I need design and proposals as well as storage economics?
Use a design and proposal tool alongside, or choose one that covers both. SurgePV lists 3D roof modeling, layout, shading, yield, financial modeling and proposals, from $1,899 per user per year for one user (SurgePV pricing page, November 2026).

