Comparison2026
E
Energy Toolbase
VS
S
Sunbase Data

Energy Toolbase vs Sunbase Data 2027: Modeling vs CRM

Energy Toolbase vs Sunbase Data from vendor pages: solar and storage modeling against a contractor CRM with estimating and proposals, with the pricing each publishes.

Keyur Rakholiya

Written by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

Energy Toolbase vs Sunbase Data 2027: Modeling vs CRM: comparison cover

Quick answer

Energy Toolbase and Sunbase Data do different jobs. Energy Toolbase's site describes financial modeling, controls and monitoring for solar and storage. Sunbase's site describes a configurable contractor platform with CRM, estimating, proposals and solar design, with plans starting at $59 per user per month. Pick Energy Toolbase for tariff economics, Sunbase to run sales and jobs. Checked November 2026.

Comparing Energy Toolbase with Sunbase Data?

Book a SurgePV demo to see design, shading, financial modeling and proposals in one place, then decide what a CRM needs to add.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

SurgePV publishes this page and is a vendor in this category. SurgePV is not one of the two products compared here; it appears only as a third option. The facts come from the vendors’ public pages, checked November 2026.

Energy Toolbase vs Sunbase Data: modeling or CRM?

Energy Toolbase models project economics; Sunbase runs the contractor’s sales pipeline and estimating. They solve different parts of a solar business.

Energy ToolbaseSunbase
Core job Financial analysis, controls and monitoring for solar and storage Configurable platform for solar installers, roofing contractors and construction companies
CRM Not described on the page read Leads, customers, companies, opportunities, appointments, follow-ups, sales pipeline
Design Not described on the page read “system design and shading analysis” listed for solar
Proposals “3M+ Proposals Generated” Estimating and proposal module: scope, quantities, labor, materials, markup, approval
Utility rates “120k+ Utility Rates Monitored” Not described on the page read
Price Not published; given on a call “Plans start at $59/user/month”; final price depends on users, capabilities, configuration, integrations and implementation

Sources: both vendors’ homepages, read November 2026. Sunbase’s page does not state the billing period behind its monthly figure or the currency; confirm both in a quote.

Energy Toolbase

Energy Toolbase public website page, captured 29 October 2026
Energy Toolbase public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Energy Toolbase lists ETB Developer for financial analysis, Controller for control software, Monitor for monitoring and Consulting for outsourced analysis.

Pros: storage and tariff modeling with controls and monitoring. Cons: no published price; no CRM or job management on the page read.

Sunbase Data

Sunbase public website page, captured 29 October 2026
Sunbase public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Sunbase says it does not have to replace every specialist tool and notes that integration availability should be confirmed per system. Its CRM covers the commercial side “before work is approved”.

Pros: one platform for pipeline, estimating and proposals; a published starting price. Cons: price depends on configuration and implementation; tariff-based storage modeling is not described.

How much do Energy Toolbase and Sunbase Data cost?

Sunbase publishes a starting price of $59 per user per month and says final pricing depends on users, capabilities, workflow configuration, integrations and implementation. Energy Toolbase does not publish a price and quotes it on a call. SurgePV’s public price is USD per user per year: $1,899 for one user, $1,499 per user for three seats and $1,299 per user for five seats (SurgePV pricing page, November 2026).

SurgePV annual price per user, for a like-for-like yearly view (USD per user per year)
  • SurgePV, 1 user$1,899
  • SurgePV, 3 seats$1,499
  • SurgePV, 5 seats$1,299

Source: SurgePV pricing page (Sunbase quotes $59 per user per month as a starting price, billing period and currency not stated; Energy Toolbase publishes none), checked November 2026.

Looking for design and proposals before the CRM?

SurgePV lists layout, shading, yield, financial modeling and proposals in one subscription.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Who should pick which?

  • Pick Energy Toolbase if you need tariff and storage economics for commercial customers.
  • Pick Sunbase Data if you need CRM, estimating and proposals for a contracting business.
  • Use both if sales runs in Sunbase and storage modeling in Energy Toolbase.
  • Consider SurgePV if the gap is design, shading, financial modeling and proposals; it is not listed as a CRM.
SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV’s public scope, per its product claims, is 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. Outputs support design work and do not replace sign-off by the responsible engineer, authority, lender or utility.

Bottom line

Energy Toolbase and Sunbase are complements, not rivals. Pick by whether your bottleneck is modeling or pipeline. To see the design and proposal side, book a SurgePV demo or review SurgePV pricing. Related: the Energy Toolbase review, the Sunbase Data review, Energy Toolbase vs SurgePV and the best solar CRM list.

Sources

Frequently asked questions

Is Energy Toolbase better than Sunbase Data?

Neither is better; they do different jobs. Energy Toolbase’s site describes financial modeling, controls and monitoring, while Sunbase’s describes a contractor platform with CRM, estimating and proposals (checked November 2026). Choose by whether modeling or pipeline is your bottleneck.

Does Sunbase Data model utility tariffs or storage?

The Sunbase homepage lists system design and shading analysis for solar, estimating and proposals, and does not describe tariff or storage modeling. For that, look at tools like Energy Toolbase (checked November 2026).

How much does Sunbase Data cost?

Sunbase says plans start at $59 per user per month. Final pricing depends on users, capabilities, workflow configuration, integrations and implementation, so ask for a written quote (checked November 2026).

How much does Energy Toolbase cost?

Energy Toolbase does not publish ETB Developer pricing. Its page says pricing for your team size is covered on a call (checked November 2026).

Does Energy Toolbase include a CRM?

The Energy Toolbase homepage does not describe a CRM. It lists ETB Developer, Controller, Monitor and Consulting, so pair it with a CRM if you need one (checked November 2026).

What is a design and proposal tool I can pair with a CRM?

SurgePV lists 3D roof modeling, layout, shading, yield, financial modeling and proposals, from $1,899 per user per year for one user (SurgePV pricing page, November 2026). It is not listed as a CRM. Access is by guided demo.

About the Contributors

Author
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Ready to See the Difference?

Start a free trial and experience why solar teams are switching to SurgePV.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.