Comparison2026
A
Aurora Solar
VS
E
Energy Toolbase

Aurora Solar vs Energy Toolbase 2026: Design vs Finance

Aurora Solar vs Energy Toolbase from vendor pages: a design and sales platform against storage and tariff modeling, with published Aurora prices. See which fits.

Keyur Rakholiya

Written by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

Aurora Solar vs Energy Toolbase 2026: Design vs Finance: comparison cover

Quick answer

Aurora Solar and Energy Toolbase solve different problems. Aurora's site describes a residential platform for design, proposals, contracts and permit plan sets; Energy Toolbase describes financial analysis, controls and monitoring for solar and storage. Pick Aurora to design and sell, Energy Toolbase to model storage economics. Only Aurora publishes prices. Checked November 2026.

Comparing Aurora Solar with Energy Toolbase?

Book a SurgePV demo to see design, shading, financial modeling and proposals in one workflow before you stack two subscriptions.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

SurgePV publishes this page and is a vendor in this category. SurgePV is not one of the two products compared here; it appears only as a price reference and a third option. The facts come from the vendors’ public pages, checked November 2026.

Aurora Solar vs Energy Toolbase: design platform or economics tool?

Aurora Solar is where you design and propose; Energy Toolbase is where you model what a solar and storage system earns. They can sit side by side in one workflow.

Aurora SolarEnergy Toolbase
Core job Design, sales, contracting, permitting (residential platform) Financial analysis, controls and monitoring for solar and storage
Design and shading Design Mode “models the roof, places panels, runs shading analysis” Not described on the page read
Proposals Sales Mode interactive proposal; cash, loan, TPO and prepaid TPO side by side “3M+ Proposals Generated”
Storage Premium: “Battery modeling: backup, self-consumption, and arbitrage” ETB Developer for solar and storage analysis; ETB Controller for control
Utility rates Not described on the page read “120k+ Utility Rates Monitored”
Permit documents Instant Plan Sets; Plan Sets Service in 24-48 hours (add-on) Not described on the page read
Commercial work Homepage links to HelioScope for commercial; not described further Commercial not detailed on the page read
Price Published: Basic $135, Premium $220 per user per month, billed annually Not published; given on a call

Sources: the vendors’ homepages and the Aurora pricing page, read November 2026.

Aurora Solar

Aurora Solar public website page, captured 29 October 2026
Aurora Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Aurora’s homepage describes Design Mode, Sales Mode, Contract Manager for e-signature and Instant Plan Sets. It reports “20M+ Projects designed on Aurora” and “7,000+ Solar organizations supported”, which are vendor figures. The homepage presents it as a residential platform and links HelioScope for commercial work.

Pros: published pricing; design, proposal, contract and permit steps in one product; battery modeling on Premium. Cons: no tariff-database claim on the page read; commercial work points to a separate product.

Energy Toolbase

Energy Toolbase public website page, captured 29 October 2026
Energy Toolbase public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Energy Toolbase lists ETB Developer, ETB Controller, ETB Monitor and ETB Consulting. Its pricing is quoted on a call that covers “pricing for your team size”.

Pros: storage and tariff focus; controls and monitoring from the same vendor; consulting option. Cons: no published price; the page read does not describe panel layout or shading.

How much do Aurora Solar and Energy Toolbase cost?

Aurora Solar publishes plan prices; Energy Toolbase does not. Aurora Basic is $135 per user per month billed annually ($1,620 per year), and Premium is $220 per user per month billed annually ($2,640 per year). Monthly billing is $159 and $259 per user per month. Annual plans carry a one-year commitment, per Aurora’s pricing page.

Published list price per user, annual billing (USD per user per year)
  • Aurora Solar Basic$1,620 $135 per month, billed annually
  • Aurora Solar Premium$2,640 $220 per month, billed annually
  • SurgePV (1 user)$1,899 one user; $1,499 per user at 3 seats

Source: Aurora Solar pricing page and SurgePV pricing page (Energy Toolbase not published), checked November 2026.

The three bars are not like for like: they cover different scopes, and Energy Toolbase has no published figure to add.

Paying for design and modeling separately?

SurgePV lists layout, shading, yield, financial modeling and proposals in one subscription from $1,899 per user per year.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Who should pick which?

  • Pick Aurora Solar if you sell and install residential systems and want design, proposal, contract and permit steps together.
  • Pick Energy Toolbase if your commercial or storage customers need tariff-based savings and dispatch analysis.
  • Use both if you design in Aurora and need deeper storage economics than a design tool gives.
  • Consider SurgePV if you want design, shading, financial modeling and proposals under one published price.
SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV’s scope, per its product claims, is 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. Outputs support design work and do not replace sign-off by the responsible engineer, authority, lender or utility.

Bottom line

Aurora Solar fits teams that design and sell; Energy Toolbase fits teams that model storage and tariffs. If you would rather have one tool for the design-to-proposal path, book a SurgePV demo or see SurgePV pricing. Related reading: the Aurora Solar review, the Energy Toolbase review, Aurora Solar vs SurgePV and Energy Toolbase alternatives.

Sources

Frequently asked questions

Is Energy Toolbase a design tool?

Energy Toolbase’s homepage describes financial analysis, controls and monitoring rather than panel layout or shading. ETB Developer is described as financial analysis for solar and energy storage. Use a design tool for layouts (checked November 2026).

Can Aurora Solar replace Energy Toolbase?

Possibly for simple projects, not for tariff-heavy storage analysis. Aurora Premium lists battery modeling for backup, self-consumption and arbitrage, while Energy Toolbase cites 120k+ monitored utility rates. Test both on a real project (checked November 2026).

How much does Aurora Solar cost?

Aurora Basic is $135 per user per month billed annually and Premium is $220. Monthly billing is $159 and $259 per user. Enterprise is custom, per Aurora’s pricing page, checked November 2026.

How much does Energy Toolbase cost?

Energy Toolbase does not publish ETB Developer prices. Its page says pricing for your team size is covered on a demo call. Ask which products the quote includes (checked November 2026).

Can I use Aurora Solar and Energy Toolbase together?

Yes, they cover different steps, but the pages read do not describe a direct integration. Plan for two subscriptions and for moving project data between them (checked November 2026).

What is a single-tool alternative to Aurora Solar and Energy Toolbase?

SurgePV lists 3D roof modeling, layout, shading, yield, financial modeling and proposals in one product, from $1,899 per user per year for one user (SurgePV pricing page, November 2026). Access is by guided demo.

About the Contributors

Author
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Ready to See the Difference?

Start a free trial and experience why solar teams are switching to SurgePV.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.