Solargraf Alternatives: 10 Tools Compared by Use Case

A desk comparison of 10 tools to look at if you are leaving or adding to Solargraf: what each vendor publishes about design, proposals, leads, project size and price. SurgePV is one of the 10.

SurgePV publishes this list and sells solar design and proposal software, so we have a commercial interest in this category. This is a desk comparison of what each vendor publishes; we have not run side-by-side tests. Prices and vendor facts checked October 2026. How we evaluate software

Published Last updated
Keyur Rakholiya

Written by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

If you want a free core app with leads, design and proposals, look at OpenSolar. If you want to pay per project instead of per user, look at Pylon. If you design commercial projects and want P90 yield values, look at HelioScope Pro. SurgePV is our product. It fits teams that want design, financial modeling and proposals in one product, with a per-user price. P90 is a yield expected to be met or exceeded in 90% of years (P50: 50%).

This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side tests. SurgePV competes with Solargraf, so check our sources.

About Solargraf. We could not read Solargraf’s main site. solargraf.com returned HTTP 403 (access denied) to automated reads, including a headless browser. What we say about Solargraf comes from the Solargraf Help Center at solargrafsupport.enphase.com, which carries an Enphase Energy copyright line. Each Solargraf fact below has the Help Center link. We do not state a Solargraf price, because we found none.

Criteria used: design and shading, proposals and signing, leads, project size, yield values (P50 and P90), and published price.

Want to see SurgePV on your own project?

Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Best-For Picks by Situation

  • A free core app with leads, design and proposals: OpenSolar. Its pages list leads, design, proposals, e-signature and a project management CRM (customer relationship management, a tool to track leads and jobs). API Access (a link to other software) and connectors are charged from 16 April 2026.
  • Paying per project, with no monthly minimum: Pylon. Standard is $4.00 per project and Pro is $10.00 per project. The page does not name the currency. New users get free credits for five Standard projects.
  • Commercial design with P90 values: HelioScope. Pro lists designs up to 5 MW DC (the size of the solar array) and P90, P95 and P99 values. It costs $259 per license per month or $2,640 per license per year.
  • Design and sales proposals from one vendor: Aurora Solar. Basic is $159 per user per month billed monthly. Contract signing (Contract Manager) is listed on Enterprise only.
  • Design, financial modeling and proposals in one product, priced per user per year: SurgePV. It starts with a guided demo.

What Does the Solargraf Help Center Document?

Start here, so you know what you would replace. This list covers only what the Help Center pages we read describe.

  • Shading: panel shading calculates each time you calculate a production estimate or save a design. You can download a shade report as a web link or PDF. See the shade report guide.
  • Electrical: you can generate a single line diagram (SLD, a simple drawing of how the system is wired). See the line diagram guide.
  • Proposals: the Express Editor lets a salesperson change panels, battery, pricing and financing while presenting. See the Express Editor guide.
  • Contracts: you can connect a DocuSign account and send contracts from a project. Your DocuSign account limits how many documents you can send. See the DocuSign guide.
  • Leads: a Leads page lets you add leads by hand, import a CSV file, or connect through an open API. You can export leads to CSV. See the leads guide.
  • Permits: the self-service permit plan set covers residential rooftop PV and PV plus storage. Its FAQ lists commercial systems, ground mounts, carports and three-phase inverters as not supported. It says some of those may be available through Solargraf Managed Services. See the permit FAQ.
  • Commercial work: a C&I (commercial and industrial) article lists a financial product suitability questionnaire and a savings breakdown. See the C&I features guide.
  • Price: not found. Enphase’s Solargraf page shows a “Book a demo” button and no price.

The Help Center release notes list a release in each month from January to October 2026 (release notes).

Comparison Table

Listed alphabetically. This is not a ranking; pick by the situation above.

Tool Best for Price (checked October 2026) Free or paid Decisive scope fact
Arka360 Design, proposals and lead management Basic $199 per month (1 user); Premium $358 per month (2 users) (arka360.com) Paid Basic lists lead management and a shade report; Premium adds battery sizing and CAD export
Aurora Solar Design and sales proposals Basic $159 per user per month billed monthly, $135 billed annually; Premium $259 monthly, $220 annually; Enterprise custom per project (aurorasolar.com) Paid Contract Manager on Enterprise only; Basic and Premium list 1 user and 50 projects per month
Energy Toolbase Utility rates and storage in proposals Not published for ETB Developer; pricing is given on a demo call (energytoolbase.com) Paid Lists 120,000+ verified utility rates; marks in-app PV layout tools with a cross
HelioScope Commercial design Basic $159 per license per month or $1,620 per license per year; Pro $259 or $2,640; Enterprise custom per project (helioscope.aurorasolar.com) Paid; 14-day trial (help article) Pro lists P90, P95 and P99 values and sales proposals; Basic designs up to 1.25 MW DC
OpenSolar Free core app with leads, design and proposals Core app free (opensolar.com); API Access and connectors charged from 16 April 2026 (vendor post) Free core app; paid add-ons Project management CRM, e-signature and proposals on one platform
PVComplete Plan sets in AutoCAD and web layouts PVSketch paid plans from $299 / mo; PVCAD plug-in from $267 / mo (annual) (pvcomplete.com) Free PVSketch version; paid plans PVCAD lists permit-ready drawings for rooftop, carport and ground mount
PVsyst Yield simulation with P50 and P90 PVsyst 8 Professional CHF 700 per year (pvsyst.com) Paid; one-month free trial Runs on Windows only; one license per computer
Pylon Pay per project Standard $4.00 per project; Pro $10.00 per project; currency not named (getpylon.com) Pay as you go; free credits for five Standard projects Standard lists a 30 kW maximum DC size; Pro lists 99 kW+
SolarEdge Designer Designs of SolarEdge systems “No license or subscription fees” (solaredge.com) Free per the vendor Applies SolarEdge design rules; lists sales proposals with financial analysis
SurgePV Design to proposal in one product $1,899 per user per year (1 user); see /pricing Paid; guided demo, no self-serve trial Roof modeling, layout, shading, yield, financial modeling, bill of materials (parts list) and proposals

Every price above was read on the vendor’s own page in October 2026. Units differ, so compare the unit before the amount. Taxes, discounts and plan limits change, so confirm them with the vendor before you buy.

Tool-by-Tool Comparison

Listed alphabetically. This is not a ranking; pick by the situation above.

Arka360

Arka360 sells design, proposal and lead management software. It also sells permit plan set services.

Best for: installers that want design, proposals and lead management in one product, and want to order permit plan sets from the same vendor.

Not the right choice if: you work in India and expect the US prices. Arka360 has separate rupee pricing pages for India, such as arka360.com/pricing-in. We did not compare them.

What the vendor documents: Basic lists basic design software, an engineering service portal, lead management, a shade report and a basic proposal. Premium adds AI assisted modeling, battery storage and backup sizing, CAD export and a customizable proposal. Enterprise adds API integration, advanced user management and custom development. The permit services page lists residential and commercial plan sets, and electrical and structural PE stamps (a seal from a professional engineer).

Price (checked October 2026): Basic is $199 per month and says “Includes 1 user”. Premium is $358 per month and says “Includes 2 user”. Enterprise is “Talk to Sales”. Source: Arka360 pricing.

Limitations: the services page shows no price for plan sets or stamps. PE stamps are “available on request”.

Vendor link: arka360.com

Arka360 public website page, captured 29 October 2026
Arka360 public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Aurora Solar

Aurora Solar sells a design and sales platform. HelioScope, a commercial design tool, is an Aurora company and has its own entry below.

Best for: teams that want design and tablet-friendly sales proposals from one vendor, with contract signing on the Enterprise plan.

Not the right choice if: you need e-signature on Basic or Premium, because the pricing table lists Contract Manager on Enterprise only. Also look elsewhere if you need P90 values. Aurora’s help article says its energy estimates are P50 values and that it “does not natively output P90 for solar energy production”.

What the vendor documents: the pricing page lists 3D roof modeling and trees, performance simulation, ground mounts and tablet-friendly proposals. It also lists automated panel placement, automated stringing (wiring panels into strings), and integrated and custom financing. Premium adds LIDAR-assisted modeling (laser-based roof measurements), bankable shade reports and battery modeling (backup, self-consumption and arbitrage). Enterprise adds AI-assisted site models, drone mapping, unlimited users, APIs and integrations, and Contract Manager.

Price (checked October 2026): Basic is $159 per user per month billed monthly, or $135 per user per month billed annually ($1,620 a year). Premium is $259 per user per month billed monthly, or $220 per user per month billed annually ($2,640 a year). Enterprise is custom, per project. Source: Aurora pricing.

Limitations: Basic and Premium list 1 user and 50 projects per month. On-demand site models start at $9.99 on those plans. Plan sets and engineering stamps are listed as add-ons.

Vendor link: aurorasolar.com

Aurora Solar public website page, captured 29 October 2026
Aurora Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Energy Toolbase

Energy Toolbase sells ETB Developer for modeling solar and storage proposals. It also sells controller, monitoring and consulting products, which are not compared here.

Best for: teams that need utility rate analysis and storage modeling in proposals, and design the roof layout in another tool.

Not the right choice if: you want a published price or an in-app PV layout tool. The pricing page gives pricing on a demo call. The comparison table on the ETB Developer page marks “In-app PV panel layout tools” and “Residential storage modeling” with a cross for ETB Developer.

What the vendor documents: a database of 120,000+ verified utility rates kept by an in-house team. It lists time-of-use modeling, modeling for net metering programs, and storage simulations. It also lists “Demand response participation and value stacking”, unlimited proposals, and real-time indicative pricing quotes from lenders. The same table ticks “PV design partnerships with leading design software tools”.

Price (checked October 2026): not published for ETB Developer. The pricing page says to book 30 minutes to get a demo and pricing for your team size. Implementation and support packages are listed separately.

Limitations: the two crosses come from the vendor’s own comparison table. Ask Energy Toolbase what it offers for those two features.

Vendor link: energytoolbase.com

Energy Toolbase public website page, captured 29 October 2026
Energy Toolbase public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

HelioScope

HelioScope is “an Aurora Inc. Company” and sells design and simulation software for commercial solar and storage.

Best for: teams that design commercial rooftop, carport and ground mount projects and want P90 values and sales proposals on the Pro plan.

Not the right choice if: you want a single-axis tracker design or PVsyst export on a lower plan. The pricing page lists both on Enterprise only. Basic designs up to 1.25 MW DC.

What the vendor documents: all plans list rooftop, carport and ground mount layout, single line diagrams and CAD export. They also list shade reports and an 8760 production report (hourly output for a year). The pricing page says “Production estimates within 1% of PVsyst”. Pro adds LIDAR-assisted modeling, storage modeling, AI-based obstruction detection and a utility rate editor. Pro also adds financial modeling, sales proposals, and P90, P95 and P99 values. Pro designs go up to 5 MW DC.

Price (checked October 2026): Basic is $159 per license per month or $1,620 per license per year. Pro is $259 per license per month or $2,640 per license per year. Each license includes 1 user and 10 projects per month. Enterprise is custom, per project. The free trial article says standard trials are 14 days. Source: HelioScope pricing.

Limitations: the plan limits are per license: 1 user, and 10 projects per month on Basic and Pro.

Vendor link: helioscope.aurorasolar.com

HelioScope public website page, captured 29 October 2026
HelioScope public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

OpenSolar

OpenSolar says it funds its free core app through partners, such as product makers, finance companies and distributors. Read its “Is OpenSolar really free?” page for its own explanation.

Best for: installers that want leads, design, proposals, e-signature and job tracking in one platform. It suits teams that work inside the app and do not need API Access or connectors.

Not the right choice if: you connect OpenSolar to other tools through the API, or you design large 3D arrays. API Access and connectors are charged from 16 April 2026. OpenSolar’s help center recommends keeping 3D designs under 500 kW. It says larger designs are possible but can bring slow simulation, calculation timeouts or save errors (help article).

What the vendor documents: the Pro page lists leads, 3D auto design, a proposal tool, e-signature and a project management CRM. It also lists invoicing and payments, finance options, single line diagrams, a shop with bill of materials, and permitting. It says the software works on “Tablet or smartphone, iOS or Android, PC or Mac”.

Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor (free page). From 16 April 2026 the vendor charges for API Access and supported connectors, per its 16 February 2026 post. Optional Enterprise Services cost US$500 per month (Support) and US$1,350 per month (Customize). Enterprise is custom (Enterprise Services).

Limitations: the 500 kW figure is a recommendation for 3D designs, not a hard limit.

Vendor link: opensolar.com

OpenSolar public website page, captured 29 October 2026
OpenSolar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVComplete

PVComplete says on its home page that it is now part of Enact Systems. It sells PVSketch, a web layout and proposal tool, and PVCAD, an AutoCAD-based engineering tool.

Best for: engineering-led teams that already work in AutoCAD and want permit-ready drawings, plus a web tool for quick layouts.

Not the right choice if: you want leads or a CRM. The pages we read describe layouts, proposals and plan sets, not a CRM. The PVCAD plug-in also needs an AutoCAD license, unless you buy the bundle.

What the vendor documents: the PVSketch page lists layouts from satellite imagery, savings and production estimates, and proposals and report export. The PVCAD page lists permit-ready drawings for rooftop, carport and ground-mounted residential and C&I projects. It also lists stringing, a single line diagram, a bill of materials, and export to PVsyst.

Price (checked October 2026): PVSketch paid plans start at “$299 / mo”, with 2 users included and “$149/mo per Addl.” user. They list unlimited residential designs and 10 C&I designs per month. The PVCAD plug-in starts at “$267 / mo (annual)” and needs an AutoCAD license. The PVCAD bundle starts at “$333 / mo (annual)” with AutoCAD included. Source: PVComplete distributed generation pricing. The page also says “Free Version Available!” for PVSketch.

Limitations: the pricing page does not say whether the monthly figures are per user. The Enact pricing page lists the plug-in at “$267/month billed annually” or “$347/month - billed monthly”.

Vendor link: pvcomplete.com

PVComplete public website page, captured 29 October 2026
PVComplete public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVsyst

PVsyst is a yield simulation program from PVsyst SA in Switzerland. It is not a sales proposal tool.

Best for: engineers who need detailed yield simulation and P50 and P90 values for grid-connected systems.

Not the right choice if: you need customer proposals, you use a Mac, or you need P50 and P90 for stand-alone or pumping systems. The help pages we searched, read October 2026, do not describe a customer proposal or quotation output. PVsyst only runs on Windows. Its help page says the P50-P90 tool is not available for stand-alone and pumping systems.

What the vendor documents: the product page lists design of grid-connected, standalone or pumping systems. It lists a 3D scene for near shading, sub-hourly simulation, and bifacial systems and trackers. Its economic assessment calculates NPV (net present value), LCOE (cost per unit of energy over the system’s life) and ROI (return on investment). A single line diagram editor exists for grid-connected systems. Its help page says storage is not included and the feature is “still work in progress”.

P50 and P90 in PVsyst’s words: P50 and P90 are values for yearly output. PVsyst’s help page says “the annual production has a 50% probability of exceeding the P50 value and a 90% probability of exceeding the P90 value”. In plain words, a P90 yield is met or beaten in 90% of years. You must enter the uncertainty values yourself. PVsyst says they are “not provided by the simulation”.

Price (checked October 2026): PVsyst 8 Professional is CHF 700 per year, in Swiss francs. Discounts are 5% for 2 to 4 licenses, 15% for 5 to 9, and 20% for 10 or more. The product page lists a “One-month free trial”. Source: PVsyst shop.

Limitations: PVsyst needs one license per computer. It does not support Remote Desktop, Citrix or similar servers. The workspace cannot sit on a synced drive such as OneDrive or Dropbox.

Vendor link: pvsyst.com

PVsyst public website page, captured 29 October 2026
PVsyst public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Pylon

Pylon is a design and proposal tool that charges per project. The company behind it is Saru Technologies Pty. Ltd.

Best for: small teams whose number of quotes changes from month to month, and who want unlimited users with no monthly minimum.

Not the right choice if: you design systems above the Standard size or want one price in a named currency. The Standard plan lists a 30 kW maximum DC size. Pro lists 99 kW+. The generic pricing page does not name the currency.

What the vendor documents: all plans list 3D shading simulation, financial projections, instant web and PDF proposals, and up to 5 designs per project. Pro adds a custom load profile, battery storage design and commercial-sized projects. Single line diagrams are on the SLD page, with “no additional fees per diagram”. A Solar CRM add-on starts at $49.00 per user per month, billed monthly.

Price (checked October 2026): Standard is $4.00 per project and Pro is $10.00 per project. eSignature is “80c/project” on every plan. Enterprise is “Get in touch”. The page says there is no monthly minimum spend and that new users get free credits for five Standard projects. Credits are bought in packs inside the web app. Source: Pylon pricing.

Limitations: the page does not name the currency. Pylon also has a New Zealand pricing page, which we did not compare.

Vendor link: getpylon.com

Pylon public website page, captured 29 October 2026
Pylon public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SolarEdge Designer

SolarEdge Designer is a design tool from SolarEdge, which makes inverters and power optimizers.

Best for: installers that design SolarEdge systems and want design, stringing and a sales proposal without a software fee.

Not the right choice if: you design other makes of equipment. The Designer page talks about “all your SolarEdge systems” and SolarEdge design rules. Check with SolarEdge whether Designer covers other makes.

What the vendor documents: HD satellite imagery, and AI-assisted 3D modeling and roof detection. It lists automatic panel layout using an irradiance map and shading analysis, and automatic stringing and DC cabling. It also lists battery and backup planning. The page says you can generate sales proposals with energy simulation, financial analysis and ROI forecasts. It says one design can move to AutoCAD, PVsyst and the SolarEdge Monitoring Platform.

Price (checked October 2026): the page says “no license or subscription fees”. Its button reads “Register - No Extra Cost”.

Limitations: the page does not say who can register, so confirm the terms with SolarEdge.

Vendor link: solaredge.com

SolarEdge Designer public website page, captured 29 October 2026
SolarEdge Designer public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV

SurgePV is our product. SurgePV publishes this list, is one of the vendors on it, and competes with Solargraf.

Best for: installers and EPC teams that want roof modeling, layout, shading, yield modeling and financial modeling in one product. The same product covers electrical workflow support, bill of materials and proposals. The per-user price is published.

Not the right choice if:

  • you want a full CRM, project management or monitoring product. SurgePV’s published product scope does not list a CRM. Its published scope does not include project management or monitoring. OpenSolar documents a project management CRM on its own site.
  • you need a self-serve trial. SurgePV offers a guided demo and does not advertise a trial.
  • you need approval from a lender, authority or engineer. SurgePV outputs support design and documentation. They do not replace that approval.
  • you want a free core app, or to pay per project. OpenSolar says its core app is free, and Pylon charges per project.

What the vendor documents: 3D roof modeling, solar array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials (BOM) output and proposal generation. See the pages on solar design, solar proposals and the generation and financial tool.

Price (checked October 2026): $1,899 per user per year for 1 user. It is $1,499 per user per year for 3 seats, and $1,299 per user per year for 5 seats. The pricing page lists unlimited projects, shadow analysis, generation and financial analysis, and proposal generation under “Everything included”. Access starts with a guided demo.

Limitations: results depend on the source data, assumptions and equipment models you use. Confirm final terms and any fair-use limits with sales.

Vendor link: SurgePV solar design software

Sources and Dates

Vendor pages were read in October 2026, and prices are the figures each vendor published on those pages. The links below are the vendor pages the entries rely on, grouped by tool. SurgePV facts come from its own pricing and demo pages.

Comparing Solargraf alternatives? See design and proposals in one workflow

Book a guided demo and bring a recent project.

Book a Free Demo

Guided demo. SurgePV does not advertise a self-serve trial.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

What a Team of Three Would Pay at Published Per-User Prices

Scope differs a lot, so this is a budgeting aid and not a value comparison. It uses only per-user or per-license figures, for three users, over 12 months.

Tool Published figure Arithmetic Per year for three users
Aurora Solar (Basic, billed annually) $135 per user per month $135 x 12 x 3 $4,860
HelioScope (Basic, per license) $1,620 per license per year $1,620 x 3 $4,860
SurgePV (3 seats) $1,499 per user per year $1,499 x 3 $4,497

Pylon has unlimited users, so its cost depends on project count. For example, 100 Standard projects at $4.00 come to 100 x $4.00 = $400 (the page does not name the currency). OpenSolar’s core app is free, but API Access and connectors are charged from 16 April 2026. We left out Arka360, Energy Toolbase, PVComplete and PVsyst, because their prices are not per user or are not published. Aurora Basic and HelioScope Basic each list 1 user per plan or license, so check how the vendor counts seats.

Stay With Solargraf or Switch?

Stay if your work is residential rooftop and the Help Center tools above cover it. We cannot say more about fit, because we could not read Solargraf’s main site.

Look at another tool if you need something the Help Center says the self-service permit tool does not cover. That list includes commercial systems, ground mounts and carports. Three vendors list related work on their own sites:

  • Arka360 lists a commercial plan set for rooftop and ground-mount systems on its permit services page.
  • PVComplete’s PVCAD page lists permit-ready drawings for rooftop, carport and ground-mounted projects.
  • Aurora lists plan sets and engineering stamps as add-ons on its pricing page.

Look at a different pricing model if you want to pay per project (Pylon) or per user per year (SurgePV). For a direct view, read our Solargraf and SurgePV comparison.

How to Choose

  • You want to spend less on software: compare OpenSolar, SolarEdge Designer (if you design SolarEdge systems) and Pylon. Check each price unit and each limit first.
  • You design commercial projects: compare HelioScope, PVComplete and Arka360. Check the project size each plan lists.
  • You need yield values with P50 and P90: compare PVsyst and HelioScope Pro. Aurora says its estimates are P50.
  • You need storage in the proposal: compare Energy Toolbase, Aurora Premium, HelioScope, Pylon Pro and Arka360 Premium. All list storage work, on the plans named.
  • You want design and proposals in one product: compare Aurora, Arka360, OpenSolar, Pylon and SurgePV.

Before you leave Solargraf, export what you need. Its Help Center describes CSV export of the projects list and of the leads list. We did not find a guide for exporting proposal templates on the pages we read. Ask Solargraf what you can take with you.

Then ask each vendor for a demo or trial, if it offers one. Use a project you already know, and compare the production number with your current tool.

How We Ordered These Tools

SurgePV publishes this page and is a vendor on this list. Its entry uses the same vendor-page sources and template as every other tool here.

The tools are listed alphabetically, and nothing here is scored. The tables record what each vendor publishes, not what we saw in use.

Design and shading. It matters because the design sets the numbers every later step uses. We did not compare design output on one roof.

Proposals and signing. It matters because this step turns a design into a signed sale. We did not open sample proposals or test signing.

Leads. It matters if leads now live in a separate tool. We did not assess how deep each lead tool is.

Project size. It matters because plan limits and size limits can rule a tool out. We did not test large designs.

Yield values. It matters if a lender or buyer asks for P50 or P90. We did not check any tool’s yield against measured output.

Published price. It matters because a published number lets you plan a budget. We did not request quotes, and we left out add-ons, taxes and volume discounts.

SurgePV sits in the alphabetical list like the other nine. It is a best-for pick only where design, financial modeling and proposals in one product are the need. We left out other tools that could fit, and the choice of 10 is ours.

Frequently Asked Questions

What is a free Solargraf alternative?

OpenSolar says its core app is free to design, sell and manage solar projects. It charges for API Access and supported connectors from 16 April 2026. SolarEdge says Designer has no license or subscription fees, and its page describes designs of SolarEdge systems. Pylon gives free credits for five Standard projects, then charges per project. PVComplete lists a free version of PVSketch.

How much does Solargraf cost?

We could not read Solargraf’s main site, so we do not state a Solargraf price. solargraf.com returned HTTP 403 (access denied) to automated reads. We found no price in the Solargraf Help Center or on the Enphase page for Solargraf. Ask Solargraf for a quote, then compare units: Aurora lists prices per user per month, Pylon per project, and SurgePV per user per year.

How does Aurora Solar compare with Solargraf?

We cannot compare prices, because we could not read Solargraf’s main site. Aurora lists Basic at $159 per user per month billed monthly, or $135 billed annually. Aurora lists its Contract Manager (e-signature tools) on the Enterprise plan only. Solargraf’s Help Center describes a DocuSign connection for sending contracts. For a longer view, see our Aurora Solar and Solargraf comparison.

How does OpenSolar compare with Solargraf?

OpenSolar’s pages list leads, design, proposals, e-signature and a project management CRM, and say the core app is free. API Access and connectors are charged from 16 April 2026. Solargraf’s Help Center describes a Leads page, a shade report, a line diagram and an Express Editor for proposals. See our OpenSolar and Solargraf comparison for more.

Which Solargraf alternative can quote batteries?

Several list battery work. Aurora lists battery modeling on Premium and Enterprise. HelioScope lists storage design on Basic and storage modeling on Pro. Pylon lists a battery design tool on Pro. Arka360 lists battery storage and backup sizing on Premium. Energy Toolbase lists storage simulations. Check each plan, because the battery feature is not on every plan.

What should I check before I leave Solargraf?

Export what you need first. Solargraf’s Help Center describes CSV export of the project list and of the leads list. We did not find a guide for exporting proposal templates on the pages we read, so ask Solargraf what you can take with you. Then book a demo of any new tool and test it on a project you know well.

About the Contributors

Author
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Ready to Design and Propose Faster?

SurgePV covers solar design, energy-yield modeling, financial modeling, and proposals in one platform. Book a guided demo to see it on a project like yours.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.