Back to Best Solar Software
Best Listsolar-design9 tools compared

Best Solar Mapping Software: 9 Tools Compared by Data Source

Nine solar mapping tools compared by the imagery, LiDAR, drone and terrain data each vendor documents, and by published price. SurgePV is one of the nine.

SurgePV publishes this list and sells solar design and proposal software, so we have a commercial interest in this category. This is a desk comparison of what each vendor publishes; we have not run side-by-side tests. Prices and vendor facts checked October 2026. How we evaluate software

Published Last updated
Keyur Rakholiya

Written by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

If you need remote roof models from imagery and LiDAR (laser height scans), look at Aurora Solar. For drone survey data, look at Scanifly. For utility-scale sites and terrain, look at RatedPower. OpenSolar states its core app is free of charge. API Access and connectors are charged from 16 April 2026. SolarEdge Designer states no license or subscription fees. SurgePV fits teams that want 3D roof modeling in the same web application as layout, shading, financial modeling and proposals. This page does not state which imagery sources SurgePV uses, so ask in the demo if the source matters to you. PVsyst’s product page describes a map to locate the project, weather data and a 3D shading scene you build or import. It does not describe tracing roofs from imagery.

This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side tests. SurgePV publishes this page and is one of the 9 tools on it.

Criteria used: data source (imagery, LiDAR, drone or terrain), what the vendor states about resolution and coverage, and what the model feeds next. Also published price, and who each tool is not for.

This list covers nine tools. Solargraf is not compared on this page. Its site, solargraf.com, returned HTTP 403 to automated reads, including a headless browser, read October 2026.

Mapping sites for solar? See SurgePV on an address

Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Best-For Picks by Use Case

  • Remote roof models from imagery and LiDAR: Aurora Solar. Its design page describes remote site assessment, LiDAR-based shade analysis and AI-assisted 3D modeling. Its pricing page lists LiDAR-assisted modeling on Premium.
  • Drone survey data for the install stage: Scanifly. It states its drone-based design is accurate to within 1 to 3 inches of hand measurements. It works with any drone that has GPS and a camera. Plan for the drone, because its pricing is not published.
  • Utility-scale sites and terrain: RatedPower. Its page documents setbacks, roads, slope limits and cut-and-fill in the design, and parcel and substation data in selected geographies.
  • A free core app: OpenSolar. It states its core app is 100% free of charge. API Access and connectors are charged from 16 April 2026. It also sells premium imagery by project where available.
  • Roof modeling inside a design-to-proposal web app: SurgePV. Its published scope covers 3D roof modeling, array layout, shading, yield, financial modeling and proposals in one product.

Comparison Table

Listed alphabetically. This is not a ranking; pick by the situation above.

Tool Best for Data source the vendor states Price (checked October 2026) Free or paid
Aurora Solar Remote roof models Google HD and Vexcel imagery included, Nearmap add-on; LiDAR-assisted modeling (Premium); drone mapping (Enterprise) Basic $135 and Premium $220 per user per month billed annually (aurorasolar.com) Paid; trial not stated on the pricing page
HelioScope Commercial sites “Quality global imagery” and LiDAR; LiDAR-assisted modeling on Pro Basic $1,620 and Pro $2,640 per license per year (helioscope.aurorasolar.com) Paid; 14-day free trial (help center)
OpenSolar Free core app Imagery in the design tool; photogrammetry-based surface model; optional paid imagery by project Core app free; API Access and connectors charged from 16 April 2026; premium imagery priced per purchase in the app (opensolar.com) Core app free, with paid imagery
PVsyst Resource data and shading scenes Bing or OpenStreetMaps locator; weather databases such as Meteonorm and PVGIS CHF 700 per year, PVsyst 8 Professional (pvsyst.com) Paid; one-month free trial
Pylon Pay-per-project residential High resolution aerial imagery in select countries; blueprint and drone photo upload $4.00 Standard, $10.00 Pro, per project; currency not named on the page (getpylon.com) Pay per project; free credits for five Standard projects
RatedPower Utility-scale sites Parcel, substation and transmission data; topography and slope limits Not published; talk to sales (ratedpower.com) Paid; free product tour
Scanifly Drone surveys Drone photogrammetry; satellite, Nearmap and LiDAR for remote designs Not published (scanifly.com) Paid; demo
SolarEdge Designer SolarEdge systems HD satellite imagery with AI-assisted 3D modeling and roof detection No license or subscription fees (solaredge.com) Free
SurgePV Roof modeling with design and proposals Not stated on this page $1,899 per user per year (1 user); see /pricing Paid; guided demo, no self-serve trial

Every price above was read on the vendor’s own page in October 2026. Taxes, discounts and plan limits change, so confirm them with the vendor before you buy.

Data Source, Resolution and Coverage

“Not stated” means the pages listed under “How We Ordered These Tools” did not say; the feature may still exist.

Tool Imagery or data source Resolution stated Coverage stated
Aurora Solar Google HD and Vexcel included, Nearmap add-on; LiDAR; drone upload on Enterprise Not stated The 25,000-plus jurisdiction database is for US jurisdictions; imagery and LiDAR coverage by region not stated
HelioScope “Quality global imagery” and LiDAR Not stated “Global” on the design page; LiDAR coverage not stated
OpenSolar Free imagery in the core app, or MetroMap, Nearmap and 3D Plus from the Imagery Marketplace Not stated MetroMap in Australia; Nearmap in Australia, New Zealand, the USA and Canada; 3D Plus in the UK, USA, Canada, New Zealand, parts of Europe and other supported countries
PVsyst Bing or OpenStreetMaps locator; Meteonorm 9, NASA-Power, PVGIS-TMY, NLR/NSRDB TMY, Solcast TMY, Solar Anywhere TGY, Solargis Not applicable Not applicable
Pylon High resolution aerial imagery; Nearmap with your own API key Not stated “Select countries”
RatedPower Parcel, substation and transmission datasets; your own GIS layers; topography Not applicable “Selected geographies”
Scanifly Drone photogrammetry; satellite, Nearmap and LiDAR for PrelimDesign Within 1 to 3 inches of hand measurements (DroneDesign) Not stated
SolarEdge Designer HD satellite imagery Not stated Not stated
SurgePV Not stated on this page Not stated Not stated

Satellite, Drone or LiDAR: Which Source Fits

The vendors describe three sources, and they are used at different stages.

  • Satellite or aerial imagery is the sales-stage source. Aurora, OpenSolar, Pylon and SolarEdge Designer all document designing on imagery. Check the imagery date and coverage on your own addresses, because none of the pages we read gives a refresh interval.
  • LiDAR adds heights and shading data from above. Aurora lists LiDAR-assisted modeling on Premium, HelioScope lists it on Pro, and Scanifly’s PrelimDesign uses LiDAR with satellite and Nearmap imagery. For more on this source, see our list of LiDAR solar design software.
  • Drone capture is the install-stage source. Scanifly says quality solar projects need two design phases: preliminary designs for sales and inch-accurate drone designs for installation. Aurora lists drone mapping on Enterprise. There it turns uploaded images or video into a processed map with imagery, LiDAR and a 3D mesh.

If your jobs are mostly standard pitched roofs in well-imaged areas, imagery may be enough for the quote. If a shading or fit surprise costs you a change order, price a drone step into the project. Then compare the results on a few finished jobs.

Tool Entries

Listed alphabetically. This is not a ranking; pick by the situation above.

Aurora Solar

Best for: teams that want to model roofs remotely from imagery and LiDAR. They keep design, proposals and contracts in one product.

Not the right choice if: you want LiDAR-assisted modeling on the entry plan, because the pricing page lists it on Premium and not on Basic. It is also not for you if you work outside the US and rely on local permit data, because the jurisdiction database is a US list.

What the vendor documents: its design page lists remote site assessment, LiDAR-based shade analysis and AI-assisted 3D modeling. The pricing page lists HD imagery (Google HD and Vexcel included, Nearmap as an add-on), 3D roof modeling and trees, and irradiance analysis (sunlight levels). It lists AI-assisted site models and drone mapping under Enterprise. Its Aurora AI page says it generates 3D roof models in under 10 seconds in one heading and under 15 seconds in its body text. Those are the vendor’s figures, and we have not checked them. Expert-built site models are sold as an add-on, starting at $9.99 on the pricing page, which does not state the unit.

Price (checked October 2026): Basic is $159 per user per month billed monthly or $135 per user per month billed annually ($1,620 per year). Premium is $259 per user per month billed monthly or $220 per user per month billed annually ($2,640 per year). Enterprise is “custom per project”. Basic and Premium list one user and 50 projects per month. Source: Aurora pricing.

Limitations: LiDAR coverage by region and imagery resolution are not stated on the pricing or design pages we read. Whether there is a free trial is not stated on the pricing page.

Vendor link: aurorasolar.com.

Aurora Solar public website page, captured 29 October 2026
Aurora Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

HelioScope

HelioScope’s footer reads “an Aurora Inc. Company”.

Best for: commercial rooftop, carport and ground-mount designers who want imagery, LiDAR on the Pro plan and simulation in one design tool.

Not the right choice if: you need LiDAR-assisted modeling or AI-based obstruction detection without paying for Pro. It is also not for you if you design above 5 MW (DC), which needs the Enterprise plan.

What the vendor documents: its design page lists “quality global imagery”, project profiles and LiDAR. It lets you lay out arrays before modeling the building. The pricing page lists LiDAR-assisted modeling, AI-based obstruction detection, financial modeling and sales proposals on Pro. It also lists P90, P95 and P99 values on Pro. It states designs up to 1.25 MW (DC) on Basic, 5 MW on Pro and 30 MW on Enterprise. It says accuracy is within 1% of PVsyst. The 1% figure is the vendor’s statement, and we have not checked it.

Price (checked October 2026): Basic is $159 per license per month or $1,620 per license per year. Pro is $259 per license per month or $2,640 per license per year. Each includes 1 user and 10 projects per month or 120 projects per year. Enterprise is custom per-project pricing. The help center describes a standard 14-day free trial. It allows one trial per customer and has Pro-level features. Source: HelioScope pricing.

Limitations: the imagery providers and LiDAR coverage are not named on the pages we read.

Vendor link: helioscope.aurorasolar.com.

HelioScope public website page, captured 29 October 2026
HelioScope public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

OpenSolar

Best for: teams that want a core app the vendor describes as free. They can start from free imagery and buy premium imagery only when a job needs it.

Not the right choice if: you need to know imagery cost before you start, because premium imagery is priced per purchase inside the app. It is also not for you if you want Auto Design in production, because the vendor labels it beta.

What the vendor documents: the homepage states “100% Free of charge”, 28,000-plus active solar professionals and 185-plus countries. Its Auto Design page describes a photogrammetry-based digital surface model (a height map built from overlapping photos). It also describes shading calculated automatically and a built-in modeling tool for sites with no imagery. The Imagery Marketplace sells MetroMap, Nearmap and 3D Plus imagery pay-as-you-go with no upfront subscription. It says availability depends on your location. OpenSolar reports on its accuracy page that a US national laboratory compared its shading values with on-site measurements at 81 points. It also reports that PVEL (a solar module testing lab) found scale accurate to within 1 and 1/3 feet 100% of the time. Both are the vendor’s reports, and we have not checked them.

Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access (a per-project fee). The per-project API fee is on OpenSolar’s API page. It also charges for supported connectors (a monthly fee per organization), per its 16 February 2026 post. Its free page says partners that pay OpenSolar fund the platform. It also sells optional paid Enterprise Services: Support US$500 per month, Customize US$1,350 per month, Enterprise custom. Premium imagery is pay per image. The price is shown in the app before purchase.

Limitations: project size limits are not stated on the pages we read. Imagery resolution is not stated.

Vendor link: opensolar.com.

OpenSolar public website page, captured 29 October 2026
OpenSolar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVsyst

PVsyst is a Windows desktop program from PVsyst SA in Switzerland.

Best for: engineers who need weather and horizon data for a yield simulation. They also need a 3D shading scene, not a roof trace.

Not the right choice if: you want to trace roof planes from imagery. The product page documents a map for locating the project, not a roof model.

What the vendor documents: on-board mapping with Bing or OpenStreetMaps to locate a project. It imports weather data from Meteonorm 9, NASA-Power, PVGIS-TMY, NLR/NSRDB TMY, Solcast TMY, Solar Anywhere TGY and Solargis. Near shadings come from a 3D scene that you model or import from another CAD tool. Horizon data can be imported through Meteonorm and PVGIS. Its help pages describe a 2D ground image that you supply for the scene. Source: PVsyst 8 product page.

Price (checked October 2026): CHF 700 per year for PVsyst 8 Professional, with updates included. Discounts are 5% for 2 to 4 licenses, 15% for 5 to 9 and 20% for 10 or more. The PVsyst 8 product page lists a one-month free trial of PVsyst 8. Price source: PVsyst shop.

Limitations: it runs on Windows only, and the product page lists remote desktop and server installs as unsupported.

Vendor link: pvsyst.com.

PVsyst public website page, captured 29 October 2026
PVsyst public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Pylon

Best for: small residential teams who want to pay per project instead of per seat. They must work in the countries where Pylon has high resolution imagery.

Not the right choice if: your projects exceed 30 kW (DC). The Standard plan’s maximum DC size is 30 kW, and the Pro plan lists 99 kW and above. It is also not for you if you work outside the countries where it offers high resolution imagery.

What the vendor documents: designing on high resolution aerial imagery (“available in select countries”). It also lists uploading blueprints or drone photography, 3D shading simulations, and five designs per project. An integration page shows how to connect Nearmap with your own Nearmap API key. The pricing page lists high resolution imagery as a Standard feature. Whether Nearmap imagery needs your own subscription is not explained there.

Price (checked October 2026): Standard is $4.00 per project and Pro is $10.00 per project. The page names no currency. Enterprise is “get in touch”. New users get free credits for five Standard projects, with no card. Source: Pylon pricing.

Limitations: the pages we read do not state imagery resolution or which countries are covered.

Vendor link: getpylon.com.

Pylon public website page, captured 29 October 2026
Pylon public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

RatedPower

RatedPower is now branded Enverus RatedPower on its site.

Best for: developers and EPCs who evaluate utility-scale PV, storage or hybrid sites. They want parcel, terrain and layout in one tool.

Not the right choice if: you design rooftops or small commercial systems, because the vendor describes the product as design for utility-scale PV, storage and hybrid projects. It is also not for you if you need a published price, because all plans say “Talk to sales”.

What the vendor documents: parcel, substation and transmission data, your own GIS layers (map data layers) next to its datasets, and buildable-acreage analysis “in selected geographies”. The design covers setbacks, roads, slope limits and cut-and-fill priced into CAPEX (up-front build cost). It has a CAD round trip that the vendor says is not lossless in every case. The pricing page says site analysis and prospecting uses Enverus PRISM International datasets for markets outside the US and Canada.

Price (checked October 2026): not published. Basic, Advanced and Enterprise plans all show “Talk to sales”, with unlimited users, projects and designs in every plan. A free product tour is offered. Source: RatedPower pricing.

Limitations: site analysis and prospecting appears under the Enterprise plan on the pricing page. What it includes depends on plan and geography.

Vendor link: ratedpower.com.

RatedPower public website page, captured 29 October 2026
RatedPower public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Scanifly

Best for: installers who want drone-verified measurements before install day, with a remote design for the sales stage.

Not the right choice if: you do not want to fly a drone or pay for a survey. The drone step needs a drone with GPS and a camera, or an outsourced survey for an additional fee. It is also not for you if you need a published price. We found no pricing page on scanifly.com, and its /pricing address returns a 404 error.

What the vendor documents: its PV design page separates two products. PrelimDesign is a remote design on satellite or Nearmap imagery and LiDAR-based shading. DroneDesign, it says, is accurate to within 1 to 3 inches of hand measurements. The field operations page says it works with any drone that takes geo-tagged images. It offers a free mobile app with any design subscription. It can outsource the drone survey for an additional fee with delivery in 3 to 5 business days. The vendor says its Viewshed shading is approved by NYSERDA, MassCEC, CEC, Austin Energy and others. We have not checked those approvals.

Price (checked October 2026): not stated on the product pages. Its /pricing address returns a 404. The site points to a Book a Demo page.

Limitations: the pages we read do not state LiDAR coverage by region.

Vendor link: scanifly.com.

Scanifly public website page, captured 29 October 2026
Scanifly public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SolarEdge Designer

SolarEdge Designer’s own page returned a 403 error to a standard request, so we read it in a headless Chrome browser.

Best for: installers who build SolarEdge systems and want a free design tool with imagery and automatic stringing.

Not the right choice if: your projects use other makers’ inverters. The page describes designs of SolarEdge systems and compliance with SolarEdge design rules. Check what it supports for other makers’ inverters.

What the vendor documents: HD satellite imagery with AI-assisted 3D modeling and roof detection. It also lists automatic placement using an irradiance map and shading analysis, and automatic stringing and DC cabling. A single design works across AutoCAD, PVsyst and the SolarEdge Monitoring Platform. Source: SolarEdge Designer.

Price (checked October 2026): “free automatic upgrades with no license or subscription fees”.

Limitations: imagery resolution and coverage are not stated on the page we read.

Vendor link: solaredge.com.

SolarEdge Designer public website page, captured 29 October 2026
SolarEdge Designer public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV

SurgePV is our product. We publish this list and sell this software.

Best for: installers and EPC teams that want 3D roof modeling, array layout, shading, yield modeling, financial modeling, electrical workflow support and proposals. All of it is in one web application.

Not the right choice if:

  • you need a self-serve trial. SurgePV offers a guided demo and does not advertise one.
  • your decision depends on a specific imagery, LiDAR or drone source. This page does not state SurgePV’s data sources, so confirm them in the demo. Aurora Solar and HelioScope document LiDAR, and Scanifly documents drone capture.
  • you need survey-grade drone measurements or utility-scale terrain analysis. Scanifly and RatedPower document those.
  • you need approval from a lender, authority or engineer. SurgePV outputs support design and documentation but do not replace that approval.
  • you need a full CRM, monitoring or ERP product. SurgePV’s published product scope does not list a CRM. Monitoring and ERP are outside its scope.

What the vendor documents: SurgePV’s published scope is 3D roof modeling, solar array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation, in a web application. The roof model sits in the same product as the rest of the design. See SurgePV’s 3D roof design page and its solar design software.

Price (checked October 2026): $1,899 per user per year for one user. It is $1,499 per user per year for 3 seats and $1,299 per user per year for 5 seats. The pricing page lists unlimited projects, 3D embedded designing, shadow analysis and proposal generation under “Everything included”. For unlimited projects, confirm fair-use limits. Access starts with a guided demo.

Limitations: results depend on the source data, assumptions and equipment models you use.

Vendor link: SurgePV solar design software.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

See SurgePV roof modeling on a project like yours

Book a guided demo and bring an address you want modeled.

Book a Free Demo

Where the Map Goes Next

A roof model is only useful for what it feeds. Before you pick a tool, check what the model drives next: shading, array placement, string layout and the proposal. Our list of solar layout software compares tools by how they place and string arrays. Our list of mobile solar design apps covers tablet and phone use on site. Roof structure and loading are separate checks; see our list of solar structural design software for tools aimed at that step.

For related comparisons, see best solar roof modeling software, best 3D solar modeling software and best solar shading analysis software.

How We Ordered These Tools

The tools are listed alphabetically, and the tables record what each vendor documents, not what we saw in use. “Not stated” means the pages we read did not say; the feature may still exist. The pages read were the vendors’ own pricing, product and design pages, opened in October 2026.

Data source. It matters because the source sets what the model can see. Imagery shows planes, LiDAR adds height, and a drone adds measured detail. We did not compare models of the same roof.

Resolution and coverage. They matter because a sharp source that does not cover your area is no use. Most vendors do not publish resolution, so we recorded the cell as “Not stated” and did not estimate.

What the model feeds next. It matters because a map that dead-ends means re-entering data. We did not test exports or handoffs between tools.

Published price. It matters because a published number lets you plan a budget. We did not negotiate quotes, and we left out add-ons, taxes and volume discounts, except where noted.

Who it is not for. It matters because every tool has a limit, such as hardware, size, region or platform. We took each limit from the vendor’s own page and did not test it.

SurgePV sits in the alphabetical list like the others. The data-source table shows where it differs. The page does not state SurgePV’s data sources. So its best-for pick rests on its documented scope, which spans roof modeling to proposals. It does not rest on a data-source advantage.

Sources and Dates

Vendor pages were read in October 2026. Aurora Solar (design page, Aurora AI page, Aurora pricing). HelioScope (design page, help center, HelioScope pricing, helioscope.aurorasolar.com). OpenSolar (Auto Design page, Imagery Marketplace, accuracy page, OpenSolar’s API page, 16 February 2026 post, free page, Enterprise Services, opensolar.com). PVsyst (help pages, PVsyst 8 product page, PVsyst shop). Pylon (integration page, Pylon pricing, getpylon.com). RatedPower (RatedPower pricing, ratedpower.com). Scanifly (PV design page, field operations page, a Book a Demo page, scanifly.com). SolarEdge Designer (SolarEdge Designer). SurgePV pricing is on the SurgePV pricing page.

Frequently Asked Questions

What is solar mapping software?

Solar mapping software turns satellite imagery, aerial photos, LiDAR or drone scans into a measurable site model. Designers use that model to place panels, set back from edges and run shading analysis before anyone visits the roof.

What is the best satellite imagery for solar design?

No source is named best on this page. Aurora Solar lists Google HD and Vexcel imagery as included and Nearmap as an add-on. OpenSolar sells MetroMap, Nearmap and 3D Plus imagery by project, depending on location. Pylon says high resolution imagery is available in select countries. Check coverage on your own addresses before you pay for any source.

What is the best free solar mapping software?

OpenSolar describes its core app as 100% free of charge. It sells premium imagery separately by project. The vendor charges for API Access and supported connectors from 16 April 2026. SolarEdge Designer states no license or subscription fees, and it designs SolarEdge systems. Pylon is not free but charges per project. It gives free credits for five Standard projects.

Is drone mapping better than satellite mapping for solar?

The vendors frame it as two stages. Scanifly says a quality project needs a preliminary remote design for sales and an inch-accurate drone design for installation. It states its drone design is accurate to within 1 to 3 inches of hand measurements. Aurora says its remote assessment lets you create accurate designs without a site visit. We have not checked either claim, so run your own comparison on a few past roofs.

Can solar mapping software replace a site survey?

It can shorten the survey, but it does not remove it. Structural checks, electrical tie-in points and approval by the responsible engineer or authority still depend on someone confirming the roof. Where a vendor offers a drone survey, as Scanifly does, that survey is a separate step after the remote design.

How much does solar mapping software cost?

Aurora Solar lists Basic at $135 per user per month billed annually. It lists Premium at $220 per user per month billed annually. HelioScope lists $1,620 per license per year for Basic and $2,640 for Pro. PVsyst lists CHF 700 per year. Pylon lists $4.00 and $10.00 per project. RatedPower and Scanifly do not publish prices. OpenSolar says its core app is free, but API Access and connectors are charged from 16 April 2026. SolarEdge Designer states no license or subscription fees. All checked October 2026.

About the Contributors

Author
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Ready to Design and Propose Faster?

SurgePV covers solar design, energy-yield modeling, financial modeling, and proposals in one platform. Book a guided demo to see it on a project like yours.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.