Back to Best Solar Software
Best Listsolar-design7 tools compared

Best Solar Design Apps for Phone and Tablet: 7 Tools Compared

A desk comparison of seven solar design tools for phone and tablet use: what each vendor says about apps and device support, field survey, proposals and price. SurgePV is one of the seven.

SurgePV publishes this list and sells solar design and proposal software, so we have a commercial interest in this category. This is a desk comparison of what each vendor publishes; we have not run side-by-side tests. Prices and vendor facts checked October 2026. How we evaluate software

Published Last updated
Keyur Rakholiya

Written by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

If you want to design and sell from a phone or tablet, OpenSolar’s Sales Mode page says it supports tablet or smartphone on iOS or Android, and its core app is free. For a drone survey app, Scanifly publishes one for iOS and Android. For proposals and leads from a phone in India, Arka360’s ArkaGo is built for that market. For pay-per-project design, Pylon is a web application priced per project, and SurgePV fits teams that want a web application covering design, shading, financial modeling and proposals without a native app.

This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side tests.

Criteria used: phone or tablet access, field survey, proposals, published price, free or trial access.

Solargraf is not compared on this page. Its site, solargraf.com, returned HTTP 403 (access refused) to automated reads, including a headless browser, read October 2026. SolarEdge Designer and Sunbase are not compared on this page.

SurgePV publishes this page and is one of the vendors on this list.

Want to see SurgePV on your own project?

Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Best-For Picks by Use Case

  • Designing and selling from a tablet or smartphone: OpenSolar. Its Sales Mode page says “Tablet or smartphone, iOS or Android, PC or Mac”, and its February 2026 post says the core app stays free.
  • Drone site survey with a phone app: Scanifly. Its field operations page lists a free iOS and Android app with any design product subscription.
  • Small crews that want to pay per project: Pylon. Its pricing page lists $4.00 per Standard project, unlimited users and free credits for five Standard projects.
  • Proposals and lead tracking from a phone in India: Arka360. Its ArkaGo page describes a phone app for proposals, a lead manager and a solar calculator, built for India’s installers.
  • Design, shading, financial modeling and proposals in one web application: SurgePV. It documents all of these in its scope and publishes per-user annual prices, with no native app.

Comparison Table

Listed alphabetically. This is not a ranking; pick by the situation above.

Tool Best for Phone or tablet access (vendor wording) Price (checked October 2026) Free or paid
Arka360 Phone proposals and leads, India ArkaGo phone app; Google Play listing linked ArkaGo price not stated; platform plans on the pricing page Paid platform; ArkaGo terms not stated
Aurora Solar Full design platform with tablet-friendly proposals “Tablet-friendly sales proposals” (pricing page) Basic $135 per user per month billed annually; Premium $220 per user per month billed annually Paid; trial not stated on the pricing page
Enact Solar Homeowner app after installation Enact Customer App on Apple App Store and Google Play, for system owners Design and proposals $279 per month billed annually Paid; “Start Trial” offered, terms not stated
OpenSolar Design and sell from a tablet or smartphone “Tablet or smartphone, iOS or Android, PC or Mac” Core app free; API Access and connectors charged from 16 April 2026 Free core app, paid API and connectors
Pylon Pay-per-project design Web application; device support not stated $4.00 per Standard project; $10.00 per Pro project (currency not stated) Pay per project; free credits for five Standard projects
Scanifly Drone site survey Mobile app on iOS and Android Not published; page points to a demo Paid; app free with any design subscription
SurgePV One web application for design to proposal Web application; no native app published $1,899 per user per year (1 user); see /pricing Paid; guided demo, no self-serve trial

Every price above was read on the vendor’s own page in October 2026. Taxes, discounts and plan limits change, so confirm them with the vendor before you buy.

Tool-by-Tool Comparison

Listed alphabetically. This is not a ranking; pick by the situation above.

Arka360

Best for: installers in India who want to build proposals, track leads and run a solar calculator from a phone.

Not the right choice if: you work outside India and want ArkaGo, because the page says it is “Built for India’s Installers”. The page also says proposal generation needs an internet connection, and it lists proposals, leads and a calculator, not full design.

What the vendor documents: the ArkaGo page describes proposals created “right from your phone”, a lead manager to “view conversations, update status, set reminders”, and a solar calculator for system size, savings and payback. It says proposals can be shared by WhatsApp, email or PDF, that the app works offline for saving contacts and leads, and that it supports residential and commercial workflows. The page links a Google Play listing; it does not state iOS availability.

Price (checked October 2026): the ArkaGo page states no price. The platform’s pricing page shows US-dollar cards: Basic at $199 per month (1 user), Premium at $358 per month (2 users), and Enterprise as “Talk to Sales”. The page also holds rupee tables, for example Lite at ₹7,500 per month or ₹46,000 per year plus 18% GST (goods and services tax). A second rupee set sits on the India pricing page, and more dollar tables are not shown. Ask Arka360 which prices apply to you.

Limitations: the ArkaGo page mentions early access users. We did not read the app store listing.

Vendor link: arka360.com/arkago.

Arka360 public website page, captured 29 October 2026
Arka360 public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Aurora Solar

Best for: teams that want a full design and sales platform with proposals built for tablets.

Not the right choice if: you want a free tier or a stated trial: the pricing page we read lists paid plans and no trial. It also does not name a native app, so confirm device support with Aurora if an app is a requirement.

What the vendor documents: the pricing page lists “Tablet-friendly sales proposals” and Sales Mode among its features. The Sales Mode page says it sends customers “personalized, interactive, mobile-friendly sales proposals”. The Aurora AI page says an address and one month’s utility bill are all you need to generate a 3D home solar design.

Price (checked October 2026): Basic is $159 per user per month billed monthly or $135 per user per month billed annually ($1,620 per year). Premium is $259 per user per month billed monthly or $220 per user per month billed annually ($2,640 per year). Enterprise is custom. Source: Aurora pricing.

Limitations: the pricing page lists 50 projects per month and one user on Basic and Premium, and its jurisdiction database (more than 25,000) is a U.S. list.

Vendor link: aurorasolar.com/sales-mode.

Aurora Solar public website page, captured 29 October 2026
Aurora Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Enact Solar

Best for: installers who want a design and proposal platform plus a monitoring app to hand to the homeowner after installation.

Not the right choice if: you want an app for field design. The app on Enact’s monitoring page is for system owners; the installer platform pages we read do not describe a field design app.

What the vendor documents: the monitoring page describes the Enact Home monitoring software and an Enact Customer App, with links to the Apple App Store and Google Play. The providers page lists roof, shading and storage design, financing options, proposal templates and a Lead API.

Price (checked October 2026): the design and proposals plan is shown as “$279/month billed annually - save $240/yr (Or $299/month – 2 users)”. The page does not say whether “2 users” describes a separate tier or the monthly-billing price, so confirm with Enact. The plan lists unlimited residential projects and proposals and 10 new commercial projects per month. Source: Enact pricing.

Limitations: the providers page shows “Start Trial” buttons but does not state trial terms.

Vendor link: enact.solar.

Enact Solar public website page, captured 29 October 2026
Enact Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

OpenSolar

Best for: installers who want to design, sell and close from a tablet or smartphone with a free core app.

Not the right choice if: you connect OpenSolar to other tools through the API or a connector, which its February 2026 post says are charged from 16 April 2026. If offline use matters, note that the pages we read do not state it.

What the vendor documents: the Sales Mode page says “Tablet or smartphone, iOS or Android, PC or Mac, we’ve got you covered”, and lists producing “detailed designs on the fly, right from your mobile device” and a full sales mode to present face to face and close on-site. The proposals page quotes a customer saying OpenSolar is web-based and has its own mobile app.

Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor (free page). The February 2026 post says the vendor charges for two things from 16 April 2026. API Access, which lets other software connect to OpenSolar, is a per-project fee. The per-project API fee is on OpenSolar’s API page. Supported connectors are a flat monthly subscription. Optional paid Enterprise Services: Support US$500 per month, Customize US$1,350 per month, Enterprise custom. Premium imagery is pay per image.

Limitations: the pages we read give no amounts for API Access or connectors.

Vendor link: opensolar.com/salesmode.

OpenSolar public website page, captured 29 October 2026
OpenSolar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Pylon

Best for: small installers who want to pay per project and add unlimited users.

Not the right choice if: you need to know before signing up which phones or tablets it supports. The Pylon pages we read (pricing, home and design tool pages) describe a web application and do not name devices. Standard also lists a maximum DC generation size of 30kW.

What the vendor documents: the pricing page says credits are purchased “within our web application” and lists system design, high resolution imagery in select countries, financial projections, instant web and PDF proposals, 3D shading simulation and AS/NZS 5033:2021 site information. Standard lists “30kW” as the maximum DC generation size; Pro and Enterprise list “99kW+”. Pro adds battery storage design and commercial sized projects. The same page lists eSignature at 80c per project.

Price (checked October 2026): Standard is $4.00 per project and Pro is $10.00 per project. The page does not state the currency of these figures. There is “no monthly minimum spend”, unlimited users, and new users get free credits for five Standard projects, with “no credit card required”. Source: Pylon pricing.

Limitations: the pricing page says high resolution imagery is available only in select countries.

Vendor link: getpylon.com.

Pylon public website page, captured 29 October 2026
Pylon public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Scanifly

Best for: crews that survey roofs with a drone and want a phone app for field data.

Not the right choice if: you need a price before a sales conversation, because Scanifly’s pages point to a demo. The app is also free only “with any design product subscription”.

What the vendor documents: the field operations page describes a mobile app on iOS and Android, with links to both stores, that “digitizes your solar site survey, installation, and maintenance processes”, with checklists and drone images submitted from the app. It says any drone that takes geo-tagged images pairs with the Scanifly software. On its home page, Scanifly says its shading analysis has been approved by regulators and lenders, naming NYSERDA, MassCEC, CEC and others, and claims accuracy within 1 to 3 inches of hand measurements. These are Scanifly’s statements and we have not checked them.

Price (checked October 2026): not published. The page says the mobile app “is free with any design product subscription” and shows “Book a Demo”.

Limitations: the drone work needs a drone and a pilot, which the page says Scanifly helps with.

Vendor link: scanifly.com/product/field-ops.

Scanifly public website page, captured 29 October 2026
Scanifly public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV

SurgePV is our product. We publish this list and sell this software.

Best for: installers and EPC teams that want roof modeling, layout, shading, yield, financial modeling, electrical workflow support, bill-of-materials output and proposals in one web application.

Not the right choice if:

  • you need a native iOS or Android app. SurgePV does not publish one; OpenSolar and Scanifly document mobile apps.
  • you need drone-based survey capture on a phone. Scanifly documents that app.
  • you need a self-serve trial. SurgePV offers a guided demo and does not advertise one.
  • you need approval from a lender, authority or engineer. SurgePV outputs support design and documentation but do not replace that approval.
  • you need a CRM, monitoring or ERP product. SurgePV is not one.

What the vendor documents: a web application covering 3D roof modeling, solar array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar design software.

Price (checked October 2026): $1,899 per user per year for one user, $1,499 per user per year for 3 seats, and $1,299 per user per year for 5 seats. Access starts with a guided demo. See the pricing page.

Limitations: results depend on the source data, assumptions and equipment models you use. Use on a phone or tablet is not described in SurgePV’s published product facts, so ask about your device at the demo.

Vendor link: SurgePV solar design software.

See SurgePV on a project of yours

Book a guided demo and ask how it works on the devices your crew carries.

Book a Free Demo

No commitment required · 20 minutes · Live project walkthrough

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Which Step of the Field Workflow Each Tool Documents

A field visit has three jobs: capture the site, design the system, and present a proposal. The vendors document different parts of that.

  • Capture the site: Scanifly lists a mobile app for site survey data and drone images. Arka360’s ArkaGo page lists proposals, lead tracking and a calculator; it does not mention site capture.
  • Design in the field: OpenSolar says you can produce designs from a mobile device. Pylon and SurgePV are web applications; neither publishes device support on the pages we read.
  • Present the proposal: Aurora Solar lists tablet-friendly sales proposals. OpenSolar lists a full sales mode for face-to-face closing. ArkaGo shares proposals by WhatsApp, email or PDF. Pylon lists instant web and PDF proposals.

For how phones and tablets fit a design workflow, see our mobile solar design guide. For drone surveys, see our guide to solar drone surveys.

How to Choose a Solar Design App

Check four things before you commit.

  1. The job on the device. Decide whether the phone or tablet captures, designs or presents. A tool that lists only proposals and leads does not replace a design tool.
  2. Your own hardware. Ask the vendor to confirm your exact phone or tablet, and test it on a real roof with your usual signal.
  3. What needs a connection. Few vendors state offline use. On the pages we read, only ArkaGo says so, and only for saving contacts and leads.
  4. The price unit. Per project, per user per month, per user per year and free all scale differently as a crew grows.

How We Ordered These Tools

The tools are listed alphabetically, and the table records what each vendor documents, not what we saw in use. “Not stated” means the pages we read did not say; the feature may still exist.

  • Phone or tablet access: matters because a field tool has to open where you stand. We did not test any app on a device.
  • Field survey: matters because a survey is the step that most needs a mobile app. We did not compare survey accuracy.
  • Proposals: matters because the proposal is what the customer sees on site. We did not compare proposal output.
  • Published price: matters because you can plan a budget before a call. We did not request quotes, and we left out add-ons and taxes.
  • Free or trial access: matters because you can test on your own roof. We did not check the limits of any free tier.

We did not assess offline performance, battery use, data security or support quality. SurgePV sits in the alphabetical list like the other six; it is the best-for pick only for a web application that covers design to proposal.

Sources and Dates

Vendor pages were read in October 2026. Prices and features come from the vendor pages linked here and in the entries above. Each vendor page can change, so check the vendor before you buy.

Frequently Asked Questions

What is the best solar design app for a phone or tablet?

It depends on the job. OpenSolar’s Sales Mode page says you can design and sell from a tablet or smartphone, on iOS or Android. Scanifly publishes a mobile app for iOS and Android that collects site survey data and drone images. Pylon is a web application with per-project prices. Pick by the job you need to finish in the field, then confirm device support with the vendor.

Is there a free solar design app?

OpenSolar’s February 2026 post says its core app stays free, with charges only for API Access and supported connectors from 16 April 2026. Pylon says new users get free credits for five Standard projects. Scanifly’s mobile app is free with any design product subscription, so it is not free on its own.

Can I design solar on an iPad?

Only some vendors say anything about tablets. OpenSolar says tablet or smartphone, iOS or Android. Aurora Solar’s pricing page lists tablet-friendly sales proposals. The Pylon pages we read describe a web application and do not name tablets, and SurgePV does not publish tablet support. Ask each vendor to confirm the tablet you own.

What is the best app for a drone site survey?

Scanifly is the drone-based option on this list. Its field operations page lists a free mobile app on iOS and Android for site survey data and drone images, and says any drone that takes geo-tagged images pairs with its software. Its price is not published; the page points to a demo.

Do solar design apps work offline?

Few vendors say. Arka360’s ArkaGo page says the app works offline for saving contacts and leads, while proposal generation needs an internet connection. The other vendors on this list do not state offline use on the pages we read.

Does SurgePV have a mobile app?

SurgePV is a web application and does not publish a native iOS or Android app. It covers roof modeling, layout, shading, yield, financial modeling and proposals. Access starts with a guided demo, where you can ask how it works on your devices.

Related lists

For desktop design tools, see best solar design software and best free solar design software. For what happens after the survey, see solar mapping software, software for small solar installers and solar proposal tracking tools. For proposals, see best solar proposal software.

About the Contributors

Author
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Ready to Design and Propose Faster?

SurgePV covers solar design, energy-yield modeling, financial modeling, and proposals in one platform. Book a guided demo to see it on a project like yours.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.