LiDAR is a technology where a scanner sends laser pulses at buildings and trees. It times how long each pulse takes to return. Solar design tools use the resulting elevation data to account for shade from trees and neighboring buildings. Two tools list LiDAR-assisted modeling on their own pricing pages: Aurora Solar (Premium plan) and HelioScope (Pro plan). Budget for those tiers if you need remote LiDAR shading. Scanifly adds drone-captured 3D models and uses USGS LiDAR as a reference layer. PV*SOL documents LiDAR-derived building models for Germany only. OpenSolar and SurgePV are listed as design tools without documented LiDAR.
This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side tests. SurgePV publishes this page and is one of the 6 tools on it.
Criteria used: LiDAR source, regional coverage, shading and report output, published price and plan needed, and trial access.
This list covers fewer tools than the query suggests. Not compared: Solargraf. The site solargraf.com returned HTTP 403 (access denied) to automated reads, including a headless browser, read October 2026. Also not compared: RatedPower. The pages we read describe terrain and topography for utility-scale (large power plant) sites and do not mention LiDAR. Also not compared: PVcase, whose solar farm design page mentions LiDAR only as an example of a terrain data import. Also not compared: Arka360. Its US demo page lists “advanced LIDAR analysis” in its Design Studio. It gives no source, coverage or plan detail. PVcase and Arka360 may belong on a longer list. We did not find enough detail to compare them.
Modeling roofs with trees? See SurgePV on one
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks by Use Case
- Remote shade analysis from LiDAR with capture date and point density shown per address: Aurora Solar. LiDAR-assisted modeling and bankable shade reports are listed on Premium.
- LiDAR-assisted commercial rooftop and ground-mount design with P90, P95 and P99 values: HelioScope. Pro lists both. The vendor’s 14-day free trial includes LiDAR-assisted modeling. P90, P95 and P99 are yearly yield levels expected to be met or exceeded in 90%, 95% and 99% of years.
- A drone-captured 3D model with LiDAR as a reference layer: Scanifly. Its November 2023 announcement says it incorporated USGS public LiDAR data. It says the LiDAR can be viewed with drone-based models.
- Windows desktop design in Germany from LiDAR-derived building models: PV*SOL. Its release notes list automatically generated 3D building models from LiDAR scans for locations in Germany.
- Browser-based roof modeling, shading, yield, financial modeling and proposals where LiDAR is not needed: SurgePV. Its published scope lists these, and it does not list LiDAR.
Comparison Table
Listed alphabetically. This is not a ranking; pick by the situation above. “Not stated” means the pages we read did not say.
| Tool | Best for | LiDAR documented | Price (checked October 2026) | Trial or demo |
|---|---|---|---|---|
| Aurora Solar | Remote residential shade analysis | LiDAR-assisted modeling on Premium; drone mapping on Enterprise | Premium $220 per user per month billed annually; $259 billed monthly (aurorasolar.com) | Not stated on the pricing page |
| HelioScope | Commercial rooftop and ground mount | LiDAR-assisted modeling on Pro | Pro $259 per license per month or $2,640 per license per year (helioscope.aurorasolar.com) | 14-day free trial includes LiDAR-assisted modeling |
| OpenSolar | 3D design, free core app | Not stated; photogrammetry-based surface model | Core app free (“100% Free of charge”); API Access and connectors charged from 16 April 2026 (opensolar.com) | Core app free to use |
| PV*SOL | Windows desktop design in Germany | 3D building models from LiDAR scans, Germany only | 845.00 EUR plus VAT per named-user license for 1 year (valentin-software.com) | 30-day free trial, report printing and saving disabled |
| Scanifly | Drone model plus LiDAR reference | LiDAR-enabled shading in remote design; USGS LiDAR | Not stated (scanifly.com) | Book a demo |
| SurgePV | Design to proposal where LiDAR is not required | Not in published scope | $1,899 per user per year (1 user); see /pricing | Guided demo, no self-serve trial |
Every price above was read on the vendor’s own page in October 2026. Taxes, plan limits and discounts change, so confirm them with the vendor before you buy.
Where LiDAR Data Is Available
LiDAR coverage differs by country and by address. These are the statements the vendors and the US government publish.
| Region | What is stated | Source |
|---|---|---|
| United States, public data | USGS states that all 3DEP products “are available free of charge and without use restrictions”, and that it has completed a first national baseline of high-resolution elevation data, including 3D point clouds, as of September 30, 2026 | USGS 3DEP |
| United States and Europe, Aurora | “LIDAR coverage throughout many parts of the United States, Europe, and select international locations”; sources are Aurora LIDAR, Google 3D and Vexcel, and the map shows point density and capture date by location | Aurora help center |
| United States, HelioScope | “LIDAR coverage through many parts of the United States and selected international locations”; sources are Aurora LIDAR and Google 3D; specific coverage “can only be determined once a project has been created at a specific address” | HelioScope help center |
| Germany, PV*SOL | 3D building models from LiDAR scans through the Rexplorer API, “available only for locations in Germany” | Valentin Software |
| United States, Scanifly | Its November 2023 announcement says it incorporated the USGS’s publicly available LiDAR data into its remote design product; the vendor’s own blog says some regions have not been updated since 2017 or earlier | Scanifly announcement and blog |
Other regions: the pages we read do not name coverage for Canada, the United Kingdom, Australia, India or other markets. Check the vendor’s coverage map for your address. Do this before you buy a plan that depends on it.
Tool Entries
Listed alphabetically. This is not a ranking; pick by the situation above.
Aurora Solar
Aurora Solar sells a solar design and sales platform. HelioScope, listed below, describes itself as an Aurora Inc. company.
Best for: teams that want to assess shade remotely from LiDAR. They can check the data’s capture date and point density before they design.
Not the right choice if: you need LiDAR-assisted modeling on the Basic plan. The pricing page lists it as an additional Premium feature. It also may not fit if your site is outside the regions on Aurora’s coverage map.
What the vendor documents: LiDAR-assisted modeling and bankable shade reports on Premium. The pricing page describes this as “Access the most extensive LIDAR available” (the vendor’s wording; we have not checked it). The help center says LiDAR shading accounts for shade from trees and neighboring buildings. It says you still draw roof obstructions such as vents and chimneys. LiDAR sources are Aurora LIDAR, Google 3D and Vexcel. Drone mapping, listed on Enterprise, returns “a processed drone map with imagery, LIDAR, and 3D mesh”.
Price (checked October 2026): Basic is $159 per user per month billed monthly. It is $135 per user per month billed annually. Premium is $259 per user per month billed monthly. It is $220 per user per month billed annually ($2,640 per year). Enterprise is custom. Source: Aurora pricing.
Limitations: the LiDAR shading article states that “LIDAR shading is only as accurate as the LIDAR behind it”. So check the source, capture date and alignment before you simulate. Basic and Premium list 1 user and 50 projects per month.
Vendor link: aurorasolar.com.

HelioScope
HelioScope is part of Aurora Inc.; its footer reads “an Aurora Inc. Company”.
Best for: commercial rooftop, carport and ground-mount designers. They want LiDAR-assisted modeling and P90, P95 and P99 values in one tool.
Not the right choice if: you want LiDAR on the Basic plan, because it is listed under Pro. Also skip it if you design above 5 MW (DC), which needs Enterprise. MW (DC) means megawatts of direct current.
What the vendor documents: Pro adds LiDAR-assisted modeling and AI-based obstruction detection. It also adds financial modeling, sales proposals and P90, P95 and P99 values. The design page lists “quality global imagery, project profiles, robust design tools, and LIDAR”. The help center says coverage spans many parts of the United States and selected international locations. The sources are Aurora LIDAR and Google 3D.
Price (checked October 2026): Basic is $159 per license per month or $1,620 per year, with 1 user. Pro is $259 per license per month or $2,640 per year. It has 1 user and designs up to 5 MW (DC). Enterprise is custom. Source: HelioScope pricing. The standard free trial is 14 days, per the HelioScope help center.
Limitations: the coverage map shows general coverage only. The help center says specific coverage is known only after you create a project at the address. The pricing page lists 1 user and 120 projects per year on Basic and Pro.
Vendor link: helioscope.aurorasolar.com.

OpenSolar
OpenSolar offers solar design, proposal and project software with a free core app. Listed here as a design tool without documented LiDAR.
Best for: installers who want 3D design and shading from a photogrammetry-based surface model. The core app is free. Photogrammetry builds 3D models from photos.
Not the right choice if: you need LiDAR-assisted modeling that the vendor documents. The auto design page describes a photogrammetry-based Digital Surface Map and does not mention LiDAR. A help center search for “lidar” on 28 October 2026 returned one article, about a UK imagery provider.
What the vendor documents: “Photogrammetry-based Digital Surface Map (DSM) technology”. It lists global HD imagery with 3D, 2D or custom properties. It also lists a sketch tool on 2D imagery “for when there’s no 3D imagery available”. Shading features include heatmaps, shade reports and dynamic solar tracing across the day, month and year.
Price (checked October 2026): the core app is “100% Free of charge” on the Why OpenSolar page. From 16 April 2026 the vendor charges for API Access (a way to connect other software) and supported connectors. API Access is a per-project fee. The per-project API fee is on OpenSolar’s API page. Connectors are a monthly fee per organization. The 16 February 2026 post says accounting connectors are billed as a monthly fee per organization. Optional paid Enterprise Services: Support US$500 per month, Customize US$1,350 per month, Enterprise custom. Premium imagery is pay per image (price shown in the app).
Limitations: LiDAR is not stated on the pages we read.
Vendor link: opensolar.com auto design.

PV*SOL
PV*SOL premium is a Windows program from Valentin Software.
Best for: designers in Germany who want 3D building models made from LiDAR scans. The program is a Windows desktop design tool.
Not the right choice if: you work outside Germany and need LiDAR-derived models. The vendor limits that feature to German locations. PV*SOL premium is also a Windows 10 or 11 (64 bit) install, not a browser tool.
What the vendor documents: release notes list “System planning using automatically generated 3D building models from LiDAR scans of the Rexplorer API (available only for locations in Germany)”. The product page lists high-resolution orthophotos (aerial photos corrected to true scale) and elevation data through the Google Solar API. It lists 3D building models for Germany through Rexplorer, the service that supplies them. It also lists shading calculated from 3D objects.
Price (checked October 2026): 845.00 EUR plus VAT for a named-user license for one year. A named-user license is for one named person. The vendor offers a 30-day free trial with all features except report printing and saving. Source: Valentin Software and pvsol.software.
Limitations: the Rexplorer help page says the first 10 locations are free. It says unlimited access needs a paid Rexplorer plan. It also says each query returns buildings within a 100-meter radius. The pages we read do not describe importing your own LiDAR point clouds (the raw scan points). Buildings can also be extruded (raised into 3D shapes) from floor plans, cadastral maps (official land maps) and map screenshots.
Vendor link: pvsol.software.

Scanifly
Scanifly sells drone-based and remote solar design software.
Best for: teams that survey with a drone. They want LiDAR as a reference layer beside a drone-captured 3D model.
Not the right choice if: you need a published price before a sales call. Also skip it if you do not fly drones and want an on-site model. The pages we read show “Book a Demo” and no amount.
What the vendor documents: its remote product, PrelimDesign, creates layouts “using satellite or Nearmap imagery and LiDAR-enabled shading to calculate production”. A November 2023 company announcement says Scanifly incorporated the USGS’s publicly available LiDAR data. It says the LiDAR can be viewed with drone-based models. The drone product, DroneDesign, builds a 3D model from drone data with onsite shade data. The vendor states it is accurate to within 1 to 3 inches of hand measurements. We have not verified this.
Price (checked October 2026): not stated on the pages we read.
Limitations: the vendor’s own blog says LiDAR is “not a completely accurate source and it’s not always available”. It lists data recency, sparse detail and difficulty seeing through dense tree canopy as limits. It also says some regions have not been updated since 2017 or earlier. It recommends combining remote and on-site data.
Vendor link: scanifly.com.

SurgePV
SurgePV is our product. We publish this list and sell this software.
Best for: installers and EPC teams (engineering, procurement and construction companies) that want one web application. It covers 3D roof modeling, array layout, shading analysis, yield and financial modeling, and proposals. This suits projects where LiDAR is not required.
Not the right choice if:
- you need LiDAR-assisted modeling or drone data. SurgePV’s published scope does not list either, and Aurora Solar, HelioScope and Scanifly document LiDAR.
- you need a self-serve trial. SurgePV offers a guided demo and does not advertise one.
- you need approval from a lender, authority or engineer. SurgePV outputs support design and documentation but do not replace that approval.
- you need a full CRM (software for customer and sales records), monitoring or ERP product. SurgePV’s published product scope does not list a CRM. Its published scope does not include monitoring or ERP (software that runs a company’s back office).
What the vendor documents: a scope of 3D roof modeling, array layout, shading analysis, energy-yield modeling and financial modeling. The scope also has electrical workflow support, bill-of-materials (parts list) output and proposal generation. The pricing page lists shadow analysis, unlimited projects, generation and financial analysis, proposal generation and 3D embedded designing under “Everything included”.
Price (checked October 2026): $1,899 per user per year for one user. It is $1,499 per user per year for 3 seats and $1,299 per user per year for 5 seats. Access starts with a guided demo.
Limitations: results depend on the source data, assumptions and equipment models you use. So check the roof model against site photos or a survey.
Vendor link: SurgePV solar designing. The 3D roof design page and the shadow analysis page cover the product detail.

See SurgePV roof modeling on a project like yours
Book a guided demo and bring a roof with trees or neighboring buildings.
Book a Free DemoWhen LiDAR Is Not Enough
Two vendors state the limits themselves. Aurora Solar’s help center says LiDAR shading is only as accurate as the LiDAR behind it. It tells designers to check the capture date and alignment before they simulate. Scanifly’s blog calls LiDAR a great preliminary dataset. It says LiDAR varies in resolution and age. It also says confirming measurements takes on-site data such as a drone model.
If a project has tall trees close to the array (the group of solar panels), check the LiDAR capture date for your address first. If the data is old, ask whether the trees have been trimmed, removed or grown since. The shading analysis list compares tools by shading method. The roof modeling list compares how each builds the roof.
How We Ordered These Tools
The tools are listed alphabetically. The tables record what each vendor documents, not what we saw in use.
LiDAR source. It matters because public airborne LiDAR, vendor-licensed LiDAR and drone data differ in age and density. We did not open any point cloud or compare data quality.
Regional coverage. It matters because a tool is only useful where it has data for your address. We did not test coverage at any address, and the vendors’ maps change.
Shading and report output. It matters because the shade result feeds the yield estimate and any lender or client report. We did not compare sample reports or check whether any lender accepts one.
Published price and plan. It matters because two vendors list LiDAR only on a higher plan. We did not negotiate quotes and left out add-ons, taxes and volume discounts.
Trial access. It matters because LiDAR coverage is easiest to judge on your own addresses. We did not sign up for any trial.
For related tool choices, see the 3D modeling list, the layout software list and, for utility-scale terrain tools, the PVcase alternatives list.
Sources and Dates
Vendor pages were read in October 2026. Aurora Solar (help center, Aurora pricing, aurorasolar.com). HelioScope (design page, HelioScope pricing, HelioScope help center, helioscope.aurorasolar.com). OpenSolar (Why OpenSolar page, OpenSolar’s API page, 16 February 2026 post, Enterprise Services, opensolar.com auto design). Scanifly (November 2023 company announcement, scanifly.com). Other sources: solar farm design page, US demo page, valentin-software.com, USGS 3DEP, Aurora help center, HelioScope help center, blog, pvsol.software, Rexplorer help page. SurgePV pricing is on the SurgePV pricing page.
Frequently Asked Questions
What is LiDAR in solar design?
LiDAR is a technology where a scanner sends laser pulses at buildings and other objects. It measures how long each pulse takes to return. Solar design tools use the resulting elevation data to account for shade from trees and neighboring buildings. Aurora Solar’s help center describes LiDAR shading this way. It notes that you still draw roof obstructions such as vents and chimneys yourself.
Which solar design software has LiDAR shading?
Aurora Solar lists LiDAR-assisted modeling on its Premium plan. HelioScope lists it on its Pro plan. Scanifly documents LiDAR-enabled shading in its remote design product and uses USGS LiDAR data. PV*SOL documents 3D building models from LiDAR scans for locations in Germany only.
Is public LiDAR data free?
In the United States, yes. The USGS states that all 3D Elevation Program (3DEP) products are available free of charge and without use restrictions. 3DEP is a USGS program that supplies high-quality elevation data. Design tools may package this data into a paid plan. So the data itself is free, but access inside a tool is not.
How accurate is LiDAR data for solar design?
It depends on point density and capture date. Aurora Solar’s help center says a point density of 0.7 is acceptable. It says 4 or more is quite good and 10 or higher is excellent. It also says LiDAR shading is only as accurate as the LiDAR behind it. Scanifly’s own blog says some regions have not been updated since 2017 or earlier.
How much do LiDAR solar design tools cost?
Aurora Solar lists Premium at $259 per user per month billed monthly or $220 per user per month billed annually. HelioScope lists Pro at $259 per month or $2,640 per year per license. PV*SOL premium is 845.00 EUR plus VAT for a one-year named-user license. Scanifly does not state a price on the pages we read. OpenSolar’s core app is free of charge. The vendor charges for API Access and supported connectors from 16 April 2026.
Do I need LiDAR for a solar design?
Not for every project. Scanifly’s own blog calls LiDAR a great preliminary dataset. It says you still need on-site data to confirm measurements. SurgePV’s published scope lists roof modeling and shading analysis and does not list LiDAR. OpenSolar builds surface models from photogrammetry. Whether LiDAR is needed depends on your trees, roof complexity and who reviews the result.
Related lists
For related comparisons, see best roof modeling software, best 3D solar modeling software and best solar shading analysis software. For the product behind the SurgePV entry, see solar design software.


