This page is for engineers, installers and EPCs checking racking loads on solar projects. Short answer: start with the free tool from your racking brand, K2 Base or Unirac U-Builder.
For wind and snow load output tied to a specific racking brand (the maker of the frames that hold the panels), start with the free tool from that brand. Use K2 Base for K2 mounting systems. Use U-Builder for Unirac racking. For ballast and wind and snow load calculations inside a commercial CAD workflow, Virto.CAD lists them. For utility-scale ground mounts, PVCase and RatedPower document grading and piling. SurgePV is a design and proposal product. It models the roof and lays out the array. Its published scope does not include structural load calculation. So a structural review still needs a racking tool or an engineer.
This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side tests.
Criteria used: load output (wind and snow), ballast, fixing and piling output, standards named, engineer or stamp services sold by the vendor, and published price.
Terms used: ballast is weight that holds an array on a flat roof without drilling. Piling means driven posts for ground mounts. A stamp is an engineer’s signed approval of a design. A PE is a professional engineer. BOM means bill of materials, the parts list. AHJ means authority having jurisdiction. AutoCAD is a CAD (computer-aided design) drawing program. ASCE 7 is a loading standard titled “Minimum Design Loads and Associated Criteria for Buildings and Other Structures”.
Handing a structural reviewer a clean layout?
Book a guided demo and bring a roof with the obstructions you need to model. SurgePV models the roof and lays out the array; it does not calculate structural loads.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks by Use Case
- Free load output for one racking brand: K2 Base for K2 mounting systems, or Unirac U-Builder for Unirac racking. K2 says Base determines wind and snow loads automatically and calculates roof fasteners and ballasting. Unirac lists design load calculations and an array ballast map in the U-Builder engineering report. Both say they are free.
- Ballast and wind and snow load calculations in a commercial CAD workflow: Virto Solar. Virto.CAD lists ballast calculation and wind and snow load calculations. Virto’s Static Engineering page lists support for Eurocode, ASCE and other standards.
- Utility-scale ground mount grading and piling: PVCase and RatedPower. PVCase Ground Mount lists piling analysis and ground grading. RatedPower lists tracker-level grading that respects slope and piling limits.
- A drone-measured roof model with plan sets and stamps from the same account: Scanifly. Its FAQ says drone designs are accurate to within 1-3 inches of hand measurements. Its design services page lists plan sets and engineering stamps.
- Roof model, array layout and bill of materials as the starting geometry for a structural review: SurgePV. That is its published scope; it does not calculate structural loads.
Comparison Table
Listed alphabetically. This is not a ranking; pick by the situation above.
| Tool | Best for | Structural scope the vendor documents | Price (checked October 2026) | Access |
|---|---|---|---|---|
| IronRidge Design Assistant | IronRidge racking, with permit packs | Design tools for pitched, attached flat, ballasted flat and ground-based systems; permit packs and PE stamps through GreenLancer | No price listed; free account (ironridge.com) | Free account |
| K2 Base | K2 mounting systems | Automatic wind and snow loads; roof fasteners and ballasting; structural analysis report | Free of charge (k2-systems.com) | Browser, no install |
| PVCase | Utility-scale ground mount and commercial rooftops | Piling analysis, slope and grading (Ground Mount); mounting calculator (Roof Mount) | Not published; request pricing (pvcase.com) | AutoCAD-based; trial not stated |
| PVComplete | AutoCAD plan sets with stamping services | Structural stamping service; PVCAD plan sets | PVCAD Bundle from $333 per month billed annually (pvcomplete.com) | AutoCAD-based; trial offered |
| RatedPower | Utility-scale earthwork and piling | Cut and fill per structure group; grading within slope and piling limits | Not published; plans listed without amounts (ratedpower.com) | Demo offered |
| Scanifly | Drone-measured roofs | Racking-tool handoff; plan sets and engineering stamps as a service | Not stated on the product pages read (scanifly.com) | Mobile app (free with a design subscription); demo |
| SurgePV | Roof model, layout and BOM for review | Not a structural calculation tool; see entry | $1,899 per user per year (1 user); see /pricing | Web; guided demo, no self-serve trial |
| Unirac U-Builder | Unirac racking, with plan set services | Engineering report with ballast map, racking weight and design load calculations; PE stamps through paid Plan Set services | Free for everyone (unirac.com) | Free |
| Virto Solar | Commercial CAD with mounting logic | Ballast and wind and snow load calculations; Eurocode and ASCE support listed | Not published; plans listed without amounts (virtosolar.com) | Free trial offered |
Every price above was read on the vendor’s own page in October 2026. Taxes, discounts and plan limits change, so confirm them with the vendor before you buy.
Tool-by-Tool Comparison
Listed alphabetically. This is not a ranking; pick by the situation above.
IronRidge Design Assistant
IronRidge makes racking and offers Design Assistant tools. Its footer says IronRidge is part of the Enstall Group.
Best for: installers who use IronRidge racking. They want the layout, bill of materials and an optional permit pack in one session.
Not the right choice if: you use another racking brand. The pages we read describe IronRidge product systems (Aire, XR, ClickFit and BX Ballast). They do not say whether Design Assistant works with other brands. The pages we read also do not describe the wind and snow load output of Design Assistant itself.
What the vendor documents: the design tools page lists applications for flush mount on pitched roofs, attached tilt on flat roofs, BX ballasted flat roofs and ground-based mounting. It also lists design, quoting, permitting and installation support. The GreenLancer page says installers can request permit plans, engineering reviews and PE stamps. They do this from the Bill of Materials page of a Pitched Roof or Ground-Based project. IronRidge’s pitched-roof resources page lists certification letters by state and by ASCE 7 edition (7-10, 7-16 and 7-22). These are for its pitched-roof rail platforms.
Price (checked October 2026): no price is listed. The tools page says a free account lets you save and edit projects, share designs and send orders to distributors. GreenLancer services are separate paid offerings. The GreenLancer page says the partnership gives about 25% off most offerings.
Limitations: the permit pack applies to Pitched Roof and Ground-Based projects on the page we read. Stamps are a paid service from a partner network.
Vendor link: ironridge.com.
K2 Base
K2 Base is a planning tool from K2 Systems GmbH, which makes mounting systems.
Best for: installers who plan with K2 mounting systems. They want wind and snow loads, fasteners and ballast worked out in a web tool.
Not the right choice if: you use another mounting brand, or you need a named standard. The K2 Base page we read describes planning “of your K2 mounting system”. It does not name Eurocode, ASCE or another loading standard. It does not name an engineer or stamp service.
What the vendor documents: a five-step workflow with Google Maps integration and drawing tools. It lists “Automatic determination of wind and snow loads” and “Automatic calculation and depiction of roof fasteners and ballasting”. It also lists an editable bill of materials. A structural analysis report, assembly plans and ballasting come as PDF reports. It runs in a browser on a PC or Mac with no installation. The page says data can transfer directly into planning tools from SolarEdge, SMA, Fronius, Kostal, GoodWe, PV*SOL premium and archelios Pro. It also says the item list can go to the cart of some wholesalers’ webshops.
Price (checked October 2026): the page says K2 Base is “free of charge”.
Limitations: the report is for the K2 mounting system on the roof inputs you enter. The building’s own capacity still needs review by the responsible engineer.
Vendor link: k2-systems.com.
PVCase
PVCase sells AutoCAD-based Ground Mount and Roof Mount products, among others.
Best for: engineering teams on utility-scale ground mounts who want terrain, grading and piling analysis in the layout. It also suits commercial rooftop teams that already work in AutoCAD.
Not the right choice if: you want a browser tool. Both products are described as AutoCAD-based. It is also not right if you need wind and snow load calculations from the same product. The plan pages we read do not list them. The Roof Mount list includes a mounting calculator for “early material planning”. Pricing is not published.
What the vendor documents: the Ground Mount plan page lists piling analysis (“based on terrain conditions and frame geometry”) and slope analysis. It also lists ground grading with heatmaps, collision analysis, front views and cross sections. The Roof Mount plan page lists rooftop setbacks, parapets and obstructions, and a mounting calculator. It also lists stringing, single-line diagram export, shading analysis and a bill of materials export. The home page says Ground Mount is built on AutoCAD. The Roof Mount page describes AutoCAD-based layouts.
Price (checked October 2026): not published. Both plan pages direct you to talk to sales or request pricing.
Limitations: trial access is not stated on the pages we read. The pages offer a demo request.
Vendor link: pvcase.com.

PVComplete
PVComplete sells PVSketch (web) and PVCAD (AutoCAD-based), plus design and engineering services.
Best for: US installers who want AutoCAD plan sets. They can order structural stamping from the same vendor.
Not the right choice if: you need wind and snow load output from the software itself. The PVCAD page we read describes plan sets, layouts, stringing and single-line diagrams. It lists “mounting system” among the layout inputs, not a load calculation.
What the vendor documents: the services page lists plan sets, electrical stamping and structural stamping. It describes structural stamping as “detailed assessments and certifications that comply with state-specific building codes”. The PVCAD page says it is available with or without an AutoCAD license. The FAQ page says the equipment database includes “prominent racking suppliers”.
Price (checked October 2026): the pricing page lists the PVCAD Bundle (AutoCAD included) from $333 per month billed annually on its Distributed Generation tab. The services page prices plan sets from $150 for a residential project to $950 above 1 MW commercial. It does not list a structural stamp price on the page we read.
Limitations: the pricing page shows the Utility Scale tab first. The pages offer a trial through “Start Trial” links.
Vendor link: pvcomplete.com.

RatedPower
RatedPower is a utility-scale design and simulation platform; its pages now also carry the Enverus name.
Best for: developers and EPCs on utility-scale sites. They want grading and piling cost visible while the layout can still change.
Not the right choice if: you design rooftops. The pricing page describes its plans as for “utility-scale plants”. The earthwork page also says drainage design and flood risk sit outside what it models.
What the vendor documents: cut and fill (moving soil to level the ground) per group of structures in 3D. It lists tracker-level grading that “respects slope and piling limits”. A tracker is a mount that turns to follow the sun. It also lists a setting for your manufacturer’s installation limit. Results go into the bill of quantities, topography analysis and design reports.
Price (checked October 2026): not published. The pricing page lists Basic, Advanced and Enterprise plans without amounts. It says all include unlimited users, projects and designs.
Limitations: the earthwork page does not say which plan includes earthwork estimating. It does not describe wind or snow load calculation.
Vendor link: ratedpower.com.

Scanifly
Scanifly sells PrelimDesign (remote), DroneDesign (drone-based) and design services.
Best for: residential and commercial teams that want measured roof geometry before a structural review. Plan sets and stamps are available as a service.
Not the right choice if: you want published pricing or load calculations from the software. The product pages we read list no price and no load calculation. Scanifly hands the layout to racking tools to finish the racking design.
What the vendor documents: per its PV design page, DroneDesign is “accurate to within 1-3 inches of hand measurements”. PrelimDesign uses satellite and Nearmap imagery and LiDAR. The integrations page lists racking layouts and bills of materials with IronRidge, Pegasus, K2 Systems and EcoFasten. It also lists plan sets from designs for Unirac and SnapNrack. The design services page lists AHJ-approved plan sets and engineering stamps “in under 48 hours” (residential only).
Price (checked October 2026): not stated on the product pages we read. Demo booking is offered.
Limitations: the 1-3 inch figure is the vendor’s own statement and we did not test it.
Vendor link: scanifly.com.

SurgePV
SurgePV is our product. SurgePV publishes this list and is one of the vendors on it.
Best for: installers and EPC (engineering, procurement and construction) teams that want one web application. It covers roof modeling, array layout, shading, yield, financial modeling, bill-of-materials output and proposals. It also gives a clean layout to hand to a structural reviewer.
Not the right choice if:
- you need wind, snow, ballast or pull-out calculations. SurgePV’s published scope does not include them; K2 Base, Unirac U-Builder and Virto.CAD document load outputs.
- you need a stamp or engineer sign-off from the software vendor. SurgePV outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender, insurer or utility.
- you need a self-serve trial. SurgePV offers a guided demo and does not advertise one.
- you need a full CRM, monitoring or ERP product. SurgePV’s published product scope does not list a CRM. Monitoring and ERP are not in its published scope.
What the vendor documents: SurgePV’s published scope covers 3D roof modeling, solar array layout and shading analysis. It also covers energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. For the design side see solar design software. Under “Everything included”, the pricing page lists unlimited projects, AI solar designing and shadow analysis. It also lists generation and financial analysis, and proposal generation.
Price (checked October 2026): $1,899 per user per year for one user. It is $1,499 per user per year for 3 seats. It is $1,299 per user per year for 5 seats. Access starts with a guided demo.
Limitations: results depend on the source data, assumptions and equipment models you use.
Vendor link: SurgePV solar design software.

Sources and Dates
Vendor pages were read in October 2026, and prices are the figures each vendor published on those pages. The links below are the vendor pages the entries rely on, grouped by tool. SurgePV facts come from its own pricing and demo pages.
- IronRidge Design Assistant: design tools page, GreenLancer page, pitched-roof resources page
- K2 Base: K2 Base page
- PVCase: Ground Mount plan page, Roof Mount plan page, Roof Mount page, pvcase.com
- PVComplete: services page, PVCAD page, FAQ page, pricing page, pvcomplete.com
- RatedPower: pricing page, earthwork page, ratedpower.com
- Scanifly: PV design page, integrations page, design services page
Hand a structural reviewer a clean layout
Book a guided demo and bring a roof with the obstructions you need to model.
Book a Free DemoUnirac U-Builder
U-Builder is a design tool from Unirac, which makes racking and sells Plan Set services.
Best for: installers on residential or commercial rooftops. They want a ballast map, racking weight and design load calculations for Unirac racking at no cost.
Not the right choice if: you use another racking brand. The U-Builder page does not say whether it supports other brands. Stamped documents are a separate paid service, not part of the free tool.
What the vendor documents: layout design from Google Maps imagery and “code-specific criteria by zip code”. It also lists a bill of materials, CAD export and state certification letters. The engineering report covers “building/roof information, array module counts and total array area, array ballast map, racking weight, design load calculations and maps”. The page offers two paths. One is a fast bill-of-materials and layout path. The other is an engineering and permit design path. It says U-Builder has HelioScope compatibility.
Price (checked October 2026): the page says U-Builder “is free for everyone to use”. Plan Set services are paid and include “PE stamps in all 50 states”. Pricing is not listed on the page we read.
Limitations: the page we read does not name the loading standard or edition the report applies.
Vendor link: unirac.com.

Virto Solar
Virto Solar sells Virto.MAX, Virto.CAD and Virto.CORE.
Best for: commercial and industrial engineering teams that want mounting-system logic, ballast and load calculations inside their CAD design.
Not the right choice if: you need a published price. It is also not right if you want to know before a trial which Virto.CAD plan includes the ballast and load calculations. The pricing page lists plan names without amounts. Its feature table does not list ballast or wind and snow load calculations by plan.
What the vendor documents: the Virto.CAD page lists “Ballast calculation for secure rooftop installations” and “Wind and snow load calculations for structural compliance”. It also lists fixed tilt, east-west and single-axis tracker rack design. It lists piling length calculation based on terrain and layout. The Static Engineering page lists “Built-in support for Eurocode, ASCE, and other standards”, load distribution analysis, and ballast and fixation calculations.
Price (checked October 2026): not published. The Virto.CAD pricing page lists Professional, Advanced and Enterprise plans, and the site offers a free trial.
Limitations: the pages do not describe an engineer or stamp service.
Vendor link: virtosolar.com.

What Structural Software Can and Cannot Sign Off
On the pages we read, the software calculates or estimates; the sign-off is separate. Unirac, IronRidge (through GreenLancer), Scanifly and PVComplete each describe stamps or structural stamping as a service. The service comes from the vendor or a partner. It is not an output of the software. Unirac labels its Plan Set support as paid. SurgePV’s own published limit is the same. Outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender, insurer or utility.
Whether a stamp is required depends on your authority having jurisdiction. So does the loading standard edition. ASCE publishes ASCE/SEI 7-22 and keeps earlier editions available. Our ASCE 7 glossary entry explains how it is used. IronRidge lists certification letters for ASCE 7-10, 7-16 and 7-22. So check which edition your permit office has adopted before you pick a letter. For a worked view of the assessment steps, see our guide to rooftop solar structural assessment.
How to Choose
Start with the surface, then the racking, then who signs.
- Pitched or flat roof with a known racking brand: use that brand’s tool first (K2 Base, U-Builder or IronRidge Design Assistant). Our guide to flat roof ballast calculation covers the physics of flat-roof ballast. See also the ballasted racking glossary entry.
- Commercial roof in CAD, mixed racking brands: look at Virto.CAD, which lists ballast and load calculations. PVCase Roof Mount lists a mounting calculator for material planning. Ask each vendor which standard and edition it applies.
- Utility-scale ground mount: compare PVCase and RatedPower on grading and piling. Then see our lists of solar layout software, ground mount design software and solar mapping software. For sites that combine crops and panels, see agrivoltaic design software.
- Measured input: if roof geometry is your weak point, a measured model gives the reviewer real dimensions to work from. Scanifly states that its drone designs are accurate to within 1-3 inches of hand measurements.
- Who signs: if you have no in-house engineer, price the stamp service as part of the tool. Do not add it after.
How We Ordered These Tools
SurgePV publishes this page and is a vendor on this list. Its entry uses the same vendor-page sources and template as every other tool here.
The tools are listed alphabetically. The matrix records what each vendor documents, not what we saw in use. “Not stated” means the pages we read did not say; the feature may still exist. Cells quote or closely follow the vendor’s wording.
| Tool | Load calculation | Ballast, fixing or piling | Standards named | Engineer or stamp service | Price published |
|---|---|---|---|---|---|
| IronRidge Design Assistant | Not stated | “BX Ballasted Flat Roofs” application | Certification letters list ASCE 7-10, 7-16, 7-22 | “PE stamps” through GreenLancer | No; free account |
| K2 Base | “Automatic determination of wind and snow loads” | “roof fasteners and ballasting” | Not stated | Not stated | “Free of charge” |
| PVCase | Not stated | “Piling analysis” (Ground Mount); “Mounting calculator” (Roof Mount) | Not stated | Not stated | No; request pricing |
| PVComplete | Not stated | Not stated | “state-specific building codes” (stamping) | “Structural Stamping” | PVCAD Bundle from $333 per month |
| RatedPower | Not stated | “slope and piling limits” | Not stated | Not stated | No |
| Scanifly | Not stated | Racking-tool handoff | Not stated | “Engineering Stamps” | Not stated |
| SurgePV | Not in published scope | Not in published scope | Not applicable | Not in published scope | Yes, USD per user per year |
| Unirac U-Builder | “design load calculations and maps” | “array ballast map” | “code-specific criteria by zip code” | “PE stamps in all 50 states” (paid) | “free for everyone” |
| Virto Solar | “Wind and snow load calculations” | “Ballast calculation” | “Eurocode, ASCE, and other standards” | Not stated | No |
Load calculation. It matters because wind uplift and snow load decide attachment spacing and ballast. We did not check any calculation against a hand calculation or a code edition.
Ballast, fixing or piling. It matters because these are the quantities that reach the bill of materials and the site crew. We did not compare how any tool rounds or distributes them.
Standards named. It matters because a permit office reviews against its adopted edition. We did not check which edition any tool applies, and most pages do not say.
Engineer or stamp service. It matters because a stamp or engineering review is a separate step after the design is drawn. We did not buy or compare turnaround of any service.
Price published. It matters because a listed price lets you plan a budget. We did not negotiate quotes, and we left out add-ons, taxes and volume discounts.
SurgePV sits in the alphabetical list like the other eight. The matrix shows where it differs. It documents roof modeling, layout and bill-of-materials output with a published price. K2 Base, Unirac U-Builder and Virto.CAD document load outputs that SurgePV’s published scope does not include. That is why SurgePV is the best-for pick only for supplying the starting geometry to a structural review.
Frequently Asked Questions
What is solar structural design software?
Solar structural design software helps plan how a PV (solar panel) array attaches to a roof or the ground. Depending on the tool, it covers racking layout, ballast and roof fixings, piling and grading, and wind and snow load output. It can also cover the drawings a structural engineer or permit office asks for.
Can solar design software replace a structural engineer?
No. The tools on this page calculate or estimate loads and quantities. The stamps they mention are paid engineering services from the vendor or a partner. Whether a stamp is required depends on your authority having jurisdiction, so ask the permit office before you rely on software output.
What is the best free solar structural design software?
K2 Base says it is free of charge, and Unirac says U-Builder is free for everyone. IronRidge offers a free account for its Design Assistant tools. Each one is made by a racking vendor. The pages we read describe it around that vendor’s own racking. So the right choice is the one that matches the racking you plan to buy.
What is solar racking design software?
Solar racking design software lays out the mounting system for a roof or ground array. It also produces a bill of materials. K2 Base, Unirac U-Builder and IronRidge Design Assistant come from racking makers. Scanifly passes module layouts to the racking tools of IronRidge, Pegasus, K2 Systems and EcoFasten.
Is there an ASCE 7 solar calculator?
ASCE 7 is a loading standard, not a calculator. ASCE publishes ASCE/SEI 7-22 and earlier editions, and it offers the ASCE Hazard Tool. K2 Base says it determines wind and snow loads automatically. Unirac’s U-Builder engineering report lists design load calculations. Virto.CAD lists wind and snow load calculations. The pages we read do not say which ASCE edition each tool applies, so ask the vendor.
How is structural design different from solar panel layout design?
Layout design decides where modules sit to meet an energy target. Structural design checks whether the roof or ground and the mounting system can carry them. The layout feeds the structural review, and the review can force the layout to change.
Related lists
For related comparisons, see best solar design software, best solar CAD tools and best solar permitting software. For the product behind the SurgePV entry, see solar design software.


