Comparison2026
M
Multiple
VS
S
SurgePV

Best Solar Proposal Software 2027: 8 Compared

Best solar proposal software in 2027: 8 tools compared on published prices, proposal features, financing and design. Find the right fit for your team.

Keyur Rakholiya

Written by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

Best Solar Proposal Software 2027: 8 Compared: comparison cover

Quick answer

Eight solar proposal tools compared on what each vendor publishes: OpenSolar is free at the core, Aurora starts at $135 per user per month billed annually, Pylon charges $4.00 per project, Enact $279 per month billed annually, and SurgePV USD 1,899 per user per year. Solargraf and Solo publish no usable price. This is not a ranking. Checked November 2026.

Picking solar proposal software for your team?

Bring a real quote to a SurgePV demo and see design, shading, yield and the finished proposal in one workflow.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

SurgePV publishes this page and is one of the eight tools on it, so check each claim against the linked vendor page. The facts come from the vendors’ public pages and our reviews of them, read October to November 2026. Last checked: 4 November 2026. Tools are listed alphabetically, not ranked.

What do the 8 solar proposal tools cost?

Only some vendors publish prices, so the table marks the rest as not published.

Tool Published price Billing basis Proposal and design scope
Arka360 Basic USD 199 per month (1 user); Premium USD 358 (2 users) Monthly cards; conflicting second listing 3D design, shade report, proposals, CRM
Aurora Solar Basic $135, Premium $220 per user per month Billed annually; $159 and $259 monthly Design, proposals, financing integrations
Enact Solar $279 per month (Design and proposals) Billed annually; currency not named Design, proposals, storage; PVCAD separate
OpenSolar Core free; Enterprise Services US$500 per month Add-ons paid Design, proposals, payments, CRM
Pylon $4.00 Standard, $10.00 Pro per project Per project; currency not named Design, proposals, SLDs; CRM from $49 per user per month
Solargraf Not read (site blocked automated reads) Not read 3D design, proposal editor, permit plan sets
Solo (GoSolo) Current page lists no amounts Older page: per-proposal fee Proposals, financing, design service
SurgePV USD 1,899 per user per year (1 user) Annual; 3 and 5 seat tiers lower 3D modeling, shading, yield, financials, proposals

Sources are listed at the end. A price shown with $ and no currency named is as the vendor shows it.

Entry price where the vendor publishes one (dollars per month, billing basis in note)
  • Pylon Standard$4 per project, not per month
  • Aurora Basic$135 per user, billed annually
  • SurgePV$158 USD 1,899 per year divided by 12
  • Arka360 Basic$199 monthly card
  • Enact Design and proposals$279 billed annually

Source: Vendor pricing pages (SurgePV annual price divided by 12), checked November 2026.

Which proposal tool fits which team?

Each tool below opens with what it suits.

Aurora Solar

Aurora suits sales teams that want design, proposals and financing in one published-price plan. Premium adds LIDAR-assisted modeling and bankable shade reports. Aurora’s help says its solar production figures are P50 values.

Aurora Solar public website page, captured 29 October 2026
Aurora Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

OpenSolar

OpenSolar suits installers who want free core software for design, proposals, payments and project tracking. Its help recommends keeping 3D designs under 500 kW.

OpenSolar public website page, captured 29 October 2026
OpenSolar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Pylon

Pylon suits small teams, mostly in Australia and New Zealand, that want to pay per project. Standard stops at 30 kW DC, and the vendor lists SLDs and a CRM add-on from $49 per user per month.

Pylon public website page, captured 29 October 2026
Pylon public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Enact Solar

Enact suits teams that want design, proposals and later system monitoring from one vendor. Design and proposals lists unlimited residential projects and 10 new commercial projects per month. PVCAD engineering is a separate plan.

Enact Solar public website page, captured 29 October 2026
Enact Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Solo (GoSolo)

Solo suits in-home sales teams for solar, roofing and HVAC that want interactive proposals, lender financing and a design team on call. It says designs can be made “in under 5 minutes” and asks you to book a demo.

Solo public website page, captured 29 October 2026
Solo public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Arka360

Arka360 suits teams that want a built-in CRM next to design, and can buy permit plan sets from the same vendor. Its pricing page lists conflicting USD figures.

Arka360 public website page, captured 29 October 2026
Arka360 public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Solargraf

Solargraf suits rooftop teams that want proposals, 3D design and permit plan sets. Its main site blocked our automated reads, so this entry relies on its help center on an Enphase address.

SurgePV

SurgePV suits teams that want shading, yield and financial modeling feeding the same proposal, at a USD per-user annual price.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Who should pick which?

  • Free to start: OpenSolar.
  • Published monthly plan with financing integrations: Aurora Solar.
  • Per-project billing, small systems: Pylon.
  • Design and proposals, then monitoring: Enact Solar.
  • In-home sales with design team: Solo.
  • CRM next to design: Arka360.
  • Rooftop with permit plan sets: Solargraf.
  • One annual price for design through proposal: SurgePV.

Want to see the finished proposal before you buy?

Book a guided SurgePV demo and walk one project from roof model to customer proposal.

Book a Free Demo

Pricing is listed on the SurgePV pricing page.

Bottom line

There is no single best proposal tool, because prices, billing bases and scope differ. Start with the one that fits your project size and sales process, then test it on a live quote. To see SurgePV on your project, book a demo or review the pricing. Related: the proposal software list by country and task, the Aurora Solar review, Pylon review, Enact Solar review, GoSolo review and the solar proposal glossary entry.

Frequently Asked Questions

What is the best solar proposal software in 2027?

It depends on your team: OpenSolar has free core software, Aurora Solar publishes plan prices from $135 per user per month billed annually, and Pylon charges $4.00 per project on Standard. Enact, Solo, Arka360, Solargraf and SurgePV complete the eight tools here. This list is not a ranking. Prices checked November 2026.

How much does solar proposal software cost?

Published prices range from free core software (OpenSolar) to Aurora Basic at $135 per user per month billed annually, Enact Design and proposals at $279 per month billed annually, Arka360 Basic at USD 199 per month, and SurgePV at USD 1,899 per user per year. Pylon charges $4.00 or $10.00 per project. Solargraf, Solo and Arka360 Enterprise give no usable price.

Is free solar proposal software good enough?

It can be for small teams. OpenSolar says its core software is free, and lists proposals, CashFlow payments, e-signature and finance. Paid items include Enterprise Services from US$500 per month, API Access and accounting connectors. Check which of these you need.

Which proposal tools include e-signature?

OpenSolar lists a built-in signing flow, PandaDoc or DocuSign. Pylon lists digital signatures at 80c per project. Enact lists DocuSign e-signatures, Aurora lists Contract Manager with DocuSign on Enterprise, and Solo lists e-signatures in proposals. Check plan limits with each vendor.

Which proposal software has built-in financing options?

Aurora lists named lender integrations such as LightReach, GoodLeap, Mosaic, Dividend, Sungage Financial and EnFin. Solo lists finance partners including GoodLeap, LightReach, Sungage, Dividend and Mosaic. Arka360, OpenSolar, Enact and Solargraf also list financing options in proposals.

Can I get a proposal tool that includes design?

Yes. Aurora, OpenSolar, Enact, Pylon, Solargraf, Arka360 and SurgePV all list design features alongside proposals. Solo lists AI-enabled design tools and a concierge design team. SurgePV lists 3D roof modeling, array layout, shading analysis and proposal generation.

Which tools offer a free trial?

OpenSolar is free at the core, and Pylon offers free credits for five Standard projects. Arka360, Solo and SurgePV point to demos and no free trial was found on the pages read. Aurora’s pricing page offers monthly plans with no minimum commitment.

Sources

About the Contributors

Author
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Ready to See the Difference?

Start a free trial and experience why solar teams are switching to SurgePV.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.