This page is for installers and EPC teams in Montenegro choosing solar design and proposal software. Short answer: if you can quote in a listed language on a free core app, pick OpenSolar; if a Montenegrin lender asks for P50 to P90 evidence, pick PVsyst.
Pick by the job and by which Montenegrin rules apply. A 2024 renewables law and a December 2024 operator guide now sit on top of the older Law on Energy that this page cites. OpenSolar’s core app is free, but its proposal language list does not include Montenegrin. PVsyst documents P50 to P90 yield results. HelioScope and Aurora Solar publish prices in US dollars. SurgePV lists roof modeling, bill of materials (a parts list) and proposals in one product, priced per user. No vendor here states a Montenegrin surplus settlement rule or grid-operator form on the pages we read.
This is a desk comparison of what each vendor publishes, checked November 2026. We have not run side-by-side tests. SurgePV publishes this page and is a vendor on this list. Tool facts come from each vendor’s own site. Other tools are not compared here. See the global list of solar design software for them.
Criteria used: Montenegrin support, surplus rules, diagrams and price.
Want to see SurgePV on a Montenegro project?
Book a guided demo and bring a real Montenegro site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Montenegro
- If you can quote in a listed language on a free core app: OpenSolar. Its help article lists 13 proposal languages and does not list Montenegrin. The core app is free. API Access and connectors are charged from 16 April 2026.
- If a Montenegrin lender asks for P50 to P90 evidence: PVsyst. Its help describes P50 to P90 evaluations. It lists 11 translations besides English, not Montenegrin. It runs on Windows only.
- If your Montenegrin jobs are commercial and you want published plan prices: HelioScope. Pro is $2,640 per license per year for designs up to 5 MW (DC), with P90, P95 and P99 values.
- If you want one per-user package for Montenegrin design and proposals: Aurora Solar. Basic is $135 per user per month billed annually. Prices are in US dollars.
- If you want roof model to proposal in one product for Montenegrin homes: SurgePV. Ask in a demo for Montenegrin output and local tariffs. Its published scope states neither.
Montenegro Solar Software Comparison Table
Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked on each vendor’s own page in October and November 2026.
| Tool | Best for | Price | Free or paid | Decisive scope fact |
|---|---|---|---|---|
| Aurora Solar | Design and sales proposals, per user | Basic $159 per user per month; $135 per user per month billed annually | Paid | SLD editor “only available in Europe”; P50 only |
| HelioScope | Commercial design, published prices | Basic $159 per month or $1,620 per year; Pro $259 per month or $2,640 per year, per license | Paid | Up to 5 MW (DC) on Pro; USD prices |
| OpenSolar | Free core app, proposals | Core app free; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | Free core app; custom tariffs |
| PVsyst | Yield evidence | CHF 700 per year (Professional) | Paid | Documents P50 to P90 evaluations; Windows only |
| SurgePV | Roof model to BOM and proposal, per user | $1,899 per user per year (1 user) | Paid, guided demo | BOM and proposal generation in scope; no Montenegro-specific output stated |
Tool Entries
Aurora Solar
Best for: Montenegrin teams that want one per-user package and can accept a dollar price list and an English interface.
Not the right choice if: you need a P90 yield (Aurora does not natively output P90 for solar energy production), or you need a diagram or price list built for Montenegro. The SLD editor is “only available in Europe”, and the pages we read do not name Montenegro.
What the vendor documents: the single line diagram editor page says the editor is only available in Europe. The help article on P-values says Aurora’s estimates are P50 values from typical-year weather data. The help article on utility rates lets you set an export rate in dollars per kWh and a compensation policy. The pricing page offers a regional selector for North America and Europe and does not list the languages of the app or proposals.
Price (checked November 2026): on the pricing page, Basic is $159 per user per month, or $135 per user per month billed annually ($1,620 billed annually). Premium is $259 per user per month, or $220 per user per month billed annually ($2,640 billed annually). Prices are in US dollars.
Limitations: the pages we read name no Montenegro-specific surplus settlement rule or grid-operator form.
Vendor link: aurorasolar.com.

HelioScope
Best for: Montenegrin commercial roofs where published plan prices and P90 values matter.
Not the right choice if: your site is above 5 MW (DC) and you do not want the Enterprise plan, or you need a surplus settlement rule or grid-operator form. Pro stops at 5 MW (DC), and the pages we read do not name Montenegro.
What the vendor documents: rooftop, carport and ground mount layouts and storage design on all projects. Every plan has shade reports and an 8760 production report (a yield figure for each hour of the year) and a 50,000-component module and inverter library. Pro adds LiDAR-assisted modeling (using laser-scan height data), financial modeling, sales proposals, and P90, P95 and P99 values. Single-axis trackers, PVsyst export and designs up to 30 MW (DC) are Enterprise features. The plan page states “Accuracy within 1% of PVsyst”. That is the vendor’s claim.
Price (checked November 2026): Basic is $159 per license per month or $1,620 per license per year, with 1 user, 120 projects per year and designs up to 1.25 MW (DC). Pro is $259 per month or $2,640 per year, for designs up to 5 MW (DC). Enterprise is custom per-project pricing. Source: HelioScope pricing. The free trial is 14 days, one per customer.
Limitations: the pages we read name no Montenegro-specific surplus settlement rule or grid-operator form.
Vendor link: helioscope.aurorasolar.com.

OpenSolar
Best for: Small Montenegrin installers who accept proposals in a listed language, since Montenegrin is not on its list, on a free core app.
Not the right choice if: you need a diagram template that lists Montenegro, or documented P50 to P90 yield results. The pages we read mention neither.
What the vendor documents: the proposal language article lists English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish. It says you need a manually translated proposal template. The single line diagram article says SLDs are supported in AU, NZ, US, CA, UK, FR, DE, IT, ES and IN. The tariff article shows how to create a custom tariff with flat, tiered and demand-charge rates.
Price (checked November 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access and supported connectors, per its 16 February 2026 post. The core app stays free.
Limitations: the pages we read name no Montenegro-specific surplus settlement rule or grid-operator form.
Vendor link: opensolar.com.

PVsyst
Best for: Montenegrin projects where a lender wants a P50 to P90 report and the team can work in English or a listed translation.
Not the right choice if: you want proposals from the same tool (the pages we read describe none), you need a diagram that shows storage, or you work on a Mac. The requirements page says PVsyst runs only under Windows.
What the vendor documents: a P50 to P90 evaluation. P50 and P90 are yields with a 50% and 90% probability of being exceeded in a year. The languages page says English is the reference language. It lists French, German, Spanish, Portuguese, Italian, Turkish, Korean, Chinese, Japanese, Polish and Russian as translations. The documentation itself is not translated. The single line diagram page describes an editor and viewer for PV strings, inverters and transformers. It covers grid-connected systems only, leaves out storage, and calls the feature “still work in progress”. The economic evaluation help page covers feed-in tariffs and self-consumption.
Price (checked November 2026): CHF 700 per year for PVsyst 8 Professional, with grouped-order discounts of 5% for 2 to 4 licences, 15% for 5 to 9 and 20% for 10 or more. The product page offers a one-month free trial.
Limitations: the pages we read name no Montenegro-specific surplus settlement rule or grid-operator form.
Vendor link: pvsyst.com.

SurgePV
SurgePV is our product. We publish this list and sell this software.
Best for: Montenegrin teams that want roof model to proposal in one per-user product. Ask in a demo for Montenegrin output and local tariffs.
Not the right choice if: you want a self-serve trial (SurgePV offers a guided demo), or you need a local-currency price in writing before talking to sales. The pricing page lists US dollars. It is also not right if you want a free tool for small jobs, because OpenSolar’s core app is free. Outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender or utility. SurgePV’s published product scope does not list a CRM (customer tracking tool), monitoring or ERP (business management software).
What the vendor documents: 3D roof modeling, array layout and shading analysis. It also lists energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar design software for the product page.
Price (checked November 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.
Limitations: results depend on source data, assumptions and equipment models. The pricing page and published scope do not state a Montenegrin interface, a Montenegro-specific surplus settlement rule or grid-operator form or P50 to P90 results.
Vendor link: surgepv.com.

Customer-Producer Rules in the Law on Energy
The Law on Energy is shown as published in the Official Gazette of Montenegro, 5/2016, 51/2017 and 82/2020. Article 96 defines a customer-producer as an end customer who produces electricity from renewable sources or high-efficiency cogeneration for own use, with occasional delivery of surplus to the distribution system. The plant’s installed power may not exceed the customer’s connection power. The supplier must buy the surplus at the energy price in the supply contract. A monthly settlement takes the net difference between energy delivered and energy taken. A final settlement is made each 1 April for the previous 12 months, and any remaining surplus is paid within 30 days at the contract energy price without the statutory fees. This is the text as amended to 2020. Later laws may have changed it, so check the current rules with the regulator and the supplier.
Montenegro’s 2024 Renewables Law and Who Does What
The surplus-settlement rules above come from the Law on Energy text on mia.gov.me, which is amended to 2020. A newer layer exists. The COTEE guide to permitting renewable plants and customer-producer installations (December 2024), prepared by the Montenegrin electricity market operator with the Ministry of Energy, the energy regulator REGAGEN, the transmission and distribution operators and the spatial planning ministry, is written under the Law on the Use of Energy from Renewable Sources, published in the Official Gazette of Montenegro no. 082/24 of 23 August 2024. The guide says it is informational only. The Energy Law is listed there with a further amendment in 84/24 of 6 September 2024, so check the current text before relying on the older settlement wording.
The guide separates the routes by who you are. Large plants enter a market premium system through auctions, where the Government sets annual quotas in a three-year plan. Small plants or demonstration projects can receive a feed-in tariff through a public call. In both routes the incentive period runs up to 12 years, per the guide. An ordinary rooftop owner is neither: the guide defines a customer-producer as an end customer who produces renewable electricity for own use in its own premises and may store or sell surplus. A customer that is not a household may do this only if it is not its primary commercial or professional activity. The status is acquired by connecting the plant to the building’s internal installation and settling the contracts with the network operator and supplier, and installed power may not exceed the connection power of the customer.
For orientation, the REGAGEN renewable energy regulations page lists the Law on the Use of Energy from Renewable Sources, a decree on the privileged-producer status, rules for the register of privileged producers and rules for the register of guarantees of origin. The CEDIS page lists connection steps for facilities in general, covered on the proposal page for Montenegro. What this changes for tools: software does not file anything with COTEE, REGAGEN or CEDIS on its own. The vendor pages we read name none of these bodies, so the choice stays a question of language, diagram, price and yield, and the paperwork stays with your local engineer.
What to Ask a Vendor Before Buying
Ask each vendor for one sample project. Then look for these items. First, a way to enter a monthly net settlement with a yearly final settlement. Second, a diagram you would give the distribution operator. Third, a price in the currency you will be invoiced in. Fourth, a proposal in the language your client reads. Where a vendor does not publish a feature on the pages we read, a demo or trial is the place to settle it.
How We Ordered These Tools
We did not rank these tools. They are listed alphabetically, and the best-for picks come from what each vendor publishes.
- Montenegrin interface or proposals: Clients and official papers may use Montenegrin. We did not assess the quality of any translation.
- Tariff and surplus entry: Savings depend on the surplus settlement rule. We did not assess whether any calculation is correct.
- Diagram for a grid-operator file: Grid operators ask for wiring drawings. We did not assess whether any tool’s diagram meets a local format.
- Price currency and yield evidence: The currency shows what a buyer will pay, and a P50 to P90 report may be asked for by a lender. We did not assess discounts, quotes or lender acceptance.
Sources and Dates
Vendor pages were read in October and November 2026. Aurora Solar (pricing, diagram editor, P-values, utility rates). HelioScope (pricing, free trial). OpenSolar (free, API and connector charges, languages, diagrams, tariffs). PVsyst (shop, product, languages, diagram, P50 to P90, economics). SurgePV (pricing). Montenegro sources: Law on Energy, mia.gov.me. The law text was read in November 2026.
Country sources, read November 2026:
- COTEE guide, December 2024, hosted by CEDIS
- REGAGEN, renewable energy regulations (Zakon o korišćenju energije iz obnovljivih izvora and secondary acts)
- CEDIS, connection to the distribution system
See SurgePV on your Montenegro project
Book a guided demo and ask which outputs you get for Montenegro work.
Book a Free DemoMore Solar Software Guides to Compare
- Solar design software for Montenegro
- Solar proposal software for Montenegro
- Solar software in Albania, a neighbor market
- Solar software in Croatia, a neighbor market
- Solar software in Serbia, a neighbor market
- Solar software in Bosnia and Herzegovina, a neighbor market
- Best solar design software, all markets
Frequently Asked Questions
What law covers rooftop solar and customer-producers in Montenegro now?
The COTEE guide to permitting renewable plants and customer-producer installations (December 2024) is written under the Law on the Use of Energy from Renewable Sources, Official Gazette 082/24 of 23 August 2024. The older Law on Energy text cited on this page is amended to 2020, so check for later changes.
How do you become a customer-producer in Montenegro?
Per the COTEE guide, the status is acquired by connecting the plant to the building’s internal installation and settling the contracts with the network operator and the supplier. Installed power may not exceed the customer’s connection power.
Who is involved in a Montenegrin solar permit?
The guide names the electricity market operator, the Ministry of Energy, REGAGEN, the transmission and distribution operators and the spatial planning ministry as its authors. Investors submit permit requests to the Ministry of Energy, which forwards them to the competent bodies.
Which incentive routes does Montenegro list for solar?
The guide lists a market premium through auctions and a feed-in tariff for small plants or demonstration projects through a public call. The incentive period runs up to 12 years. Quotas come from a Government three-year plan.
Do the five vendors support Montenegrin?
OpenSolar’s 13 proposal languages and PVsyst’s 11 translations besides English do not include Montenegrin. The Aurora Solar and SurgePV pages we read do not state a Montenegrin interface.


