Back to Best Solar Software
Best ListBest-Of List5 tools compared

Solar Software for Croatia: 5 Tools Compared (2026)

Five solar software tools compared on what each vendor publishes for Croatian rooftop work: Croatian-language output, euro prices, export and tariff modeling, single line diagrams and the Fund grant. Checked October 2026.

SurgePV publishes this list and sells solar design and proposal software, so we have a commercial interest in this category. This is a desk comparison of what each vendor publishes; we have not run side-by-side tests. Prices and vendor facts checked October 2026. How we evaluate software

Published Last updated
Rainer Neumann

Written by

Rainer Neumann

Editorial contributor · SurgePV

Keyur Rakholiya

Edited by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

If you quote Croatian homes, the proposal has to show three local lines. They are how the supplier pays for the power you export, the Fund grant, and the grid operator’s connection steps. No tool here states the Croatian export rule. PV*SOL premium is the one whose shop page lists Croatian among its ‘Presentation’ languages and prices in euro. OpenSolar suits an installer who wants a free core app and will enter the export tariff by hand. PVsyst documents feed-in and self-consumption tariffs for yield and economics work. SurgePV documents the design-to-proposal workflow but names nothing Croatian, so ask for the local lines in a demo.

This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side tests. Tool facts come from each vendor’s own site. Local rules come from the Croatian Energy Regulatory Agency (HERA), HEP, and the Environmental Protection and Energy Efficiency Fund. SurgePV publishes this list and is one of the tools on it.

Criteria used: Croatian-language output, price in euro, export and tariff modeling, single line diagram, grant line, free option.

Want to see SurgePV on your own project?

Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Best-For Picks for Croatia

  • Croatian-language output and a euro price: PV*SOL premium. Its shop page lists Croatian among its ‘Presentation’ languages and shows 845.00 euro plus VAT. The page does not define that label, so ask which parts of a quote come out in Croatian. The program screens are in nine other languages, not Croatian.
  • Free quoting with a custom export tariff: OpenSolar. The core app is free. Its help center shows how to create a custom tariff with a compensation mechanism and how to add custom incentives for a grant line. Its proposal language list has no Croatian.
  • Hour-by-hour yield with feed-in or self-consumption tariffs: PVsyst. Its help describes fixed, hourly and self-consumption tariffs. It does not produce customer proposals, and it runs on Windows only.
  • Roof model to bill of materials and proposal in one product, priced per user: SurgePV. It documents roof modeling, shading, yield, financial modeling, bill of materials and proposals. Ask in a demo how it handles Croatian export rules and the Fund grant. Its published scope names neither.
  • A single line diagram in the same tool as sales proposals: Aurora Solar. Its help center says the single line diagram editor is only available in Europe. It does not say which countries. Ask whether it covers Croatia.

Comparison Table

The tools are in alphabetical order. This is not a ranking. Pick by the situation above. Prices checked October 2026 on each vendor’s own page.

Tool Best for Price Free or paid Decisive scope fact
Aurora Solar Single line diagram plus sales proposals $159 or $259 per user per month (monthly billing); $135 or $220 billed annually Paid Europe pages do not name Croatia
OpenSolar Free quoting, custom tariff Core app free of charge; API Access and connectors charged from 16 April 2026 Free core app, paid API and connectors No Croatian in the proposal language list
PV*SOL premium Croatian output, euro price 845.00 EUR plus VAT per year (named user) Paid, 30-day trial Croatian listed under ‘Presentation’ languages
PVsyst Yield and tariff economics CHF 700 per year (PVsyst 8 Professional) Paid, one-month trial No customer proposal output in its help index
SurgePV Roof model to BOM and proposal, per user $1,899 per user per year (1 user), in US dollars Paid, guided demo BOM and proposal generation in scope; no Croatian item stated

Croatia Criteria Matrix

Each cell is Documented, Partial or Not stated. Documented means the vendor’s own page states it. Partial means the page states a related item but not the full one. Not stated means the pages we read in October 2026 do not say. There are no scores or weights.

Tool Croatian output Price in euro Export or tariff modeling Single line diagram Fund grant line Free option
Aurora Solar Not stated Not published (dollars) Partial (export rate options in dollars per kWh) Partial (editor “only available in Europe”) Not stated Not stated
OpenSolar Not stated (no Croatian in 13 proposal languages) Free core app Partial (custom tariffs) Not stated (10 countries listed, not Croatia) Partial (custom incentives, no Fund type named) Documented
PV*SOL premium Partial (Croatian listed under ‘Presentation’ languages) Documented (845.00 EUR plus VAT) Partial (net metering tariff periods, no Croatian rule) Partial (circuit diagrams listed) Not stated Documented (30 days, report printing and saving off)
PVsyst Not stated (no Croatian in 12 program languages) Not published (CHF) Partial (feed-in and self-consumption tariffs) Partial (editor, work in progress) Not stated Partial (one-month trial on product page)
SurgePV Not stated Not published (USD) Not stated Not stated Not stated Not stated (guided demo)

Two things stand out. Only PV*SOL lists Croatian output and a euro price. No vendor documents the Croatian monthly export rule. A tool that does not state an item may still support it, so ask each vendor to quote one real Croatian job.

Tool Entries

Aurora Solar

Best for: teams already on Aurora that want a single line diagram and sales proposals in one tool, and will add Croatian lines by hand.

Not the right choice if: you need a documented Croatian export rule, Croatian-language proposals or a euro price. The pages we read state none of them.

What the vendor documents: its pricing page has regions for North America, Europe (EN), Germany, Spain, France and the United Kingdom. Its Europe page describes design and proposals for European teams and says projects have been designed in 150+ countries. The help article Single-Line Diagram Editor says the editor is only available in Europe. The article Editing utility rates on a project lists export rate options, including a fixed export rate in dollars per kWh. It also lists a compensation policy for each design.

Price (checked October 2026): Basic $159 per user per month billed monthly, or $135 per user per month billed annually ($1,620 billed annually); Premium $259 per user per month, or $220 billed annually ($2,640 billed annually). Enterprise is custom, per project. The page shows a dollar sign and does not name the currency.

Limitations: the Europe page does not name Croatia, and the pages we read show no euro price.

Vendor link: aurorasolar.com.

Aurora Solar public website page, captured 29 October 2026
Aurora Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

OpenSolar

Best for: installers who want a free core app for quoting and will set up the Croatian export tariff and the Fund grant by hand.

Not the right choice if: you need a Croatian proposal template out of the box. Skip it too if you need a single line diagram for Croatia or a built-in Croatian rule. None is named on the pages we read.

What the vendor documents: its tariff article shows how to create a custom tariff with a compensation mechanism and flat, time-of-use, tiered or demand rates. The incentives article lists fixed, size-based, price-based and performance-based incentive types. The article on proposal languages lists 13 languages and Croatian is not one. The single line diagram article lists AU, NZ, US, CA, UK, FR, DE, IT, ES and IN.

Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access, a per-project fee, and for supported connectors, a flat monthly subscription. API Access lets other software connect to OpenSolar. This comes from its 16 February 2026 post and its API page. Optional paid Enterprise Services: Support US$500 per month, Customize US$1,350 per month, Enterprise custom.

Limitations: the export tariff, the grant and a Croatian proposal text are yours to set up and keep current.

Vendor link: opensolar.com.

OpenSolar public website page, captured 29 October 2026
OpenSolar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PV*SOL premium

Best for: installers and designers who want Croatian-language output, a euro price and a free 30-day trial.

Not the right choice if: you need a cloud tool or a Mac. PV*SOL premium lists Windows 10 and 11 (64 bit) only. Skip it too if you need a documented Croatian export rule, because the pages we read do not name one.

What the vendor documents: its shop page lists nine program languages: Czech, English, French, German, Italian, Polish, Portuguese, Spanish and Turkish. It also has a longer list of ‘Presentation’ languages that includes Croatian. The page does not define that label. The vendor’s other pages say reports come in 23 or 24 languages, so check the current list before you buy. The product page lists project reports that you can export as Word or PDF, a customer presentation for quotations, and financial analysis. The shop page lists circuit diagrams. The help page on net metering tariffs describes tariff periods in euro per kWh.

Price (checked October 2026): 845.00 EUR plus VAT for a one-year named-user license. The license can be used on any number of devices, but not at the same time. The vendor offers a 30-day free trial with all features except report printing and saving.

Limitations: the interface is not in Croatian, and the pages we read name no Croatian tariff, grant or grid rule.

Vendor link: valentin-software.com.

PV*SOL premium public website page, captured 29 October 2026
PV*SOL premium public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVsyst

Best for: engineers who need hour-by-hour yield and economics with feed-in or self-consumption tariffs, and who write the customer proposal elsewhere.

Not the right choice if: you need a customer proposal, Croatian-language screens, or a cloud tool. PVsyst runs on Windows only, and its program languages do not include Croatian.

What the vendor documents: the help page on feed-in tariff and self-consumption describes a fixed feed-in tariff and peak and off-peak tariffs. It also describes hourly tariffs from a CSV file. A self-consumption saving can have a separate tariff for the surplus. The single line diagram page says the feature is work in progress, is for grid-connected systems and does not include storage. The product page lists 12 program languages: English, French, Italian, Spanish, German, Portuguese, Turkish, Chinese, Korean, Japanese, Polish and Russian. The help search index we checked has no page about customer proposal or quotation output.

Price (checked October 2026): PVsyst 8 Professional CHF 700 per year, updates included. Group discounts are 5% for 2 to 4 licenses, 15% for 5 to 9 and 20% for 10 or more. The product page lists a one-month free trial. The price is in Swiss francs and no euro price is published.

Limitations: one license per computer, and the pages we read name no Croatian rule.

Vendor link: pvsyst.com.

PVsyst public website page, captured 29 October 2026
PVsyst public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV

SurgePV is our product.

Best for: teams that want roof modeling, shading, yield, financial modeling, bill of materials and proposals in one product, priced per user. They will confirm the Croatian lines in a demo.

Not the right choice if: you want a self-serve trial (SurgePV offers a guided demo). Skip it too if you need a documented Croatian-language proposal. Skip it if you need a euro price in writing before you talk to sales. SurgePV’s published price is in US dollars, so confirm taxes in a quote. Outputs support design and documentation. They do not replace approval by the responsible engineer, authority, lender or utility. Monitoring and ERP are outside its published scope.

What the vendor documents: 3D roof modeling, array layout, shading analysis and energy-yield modeling. It also lists financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar proposal software for the product page.

Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.

Limitations: results depend on source data, assumptions and equipment models. The published scope does not state Croatian export rules, the Fund grant, Croatian-language proposals or a euro price.

Vendor link: surgepv.com.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Croatia Rules That Shape the Choice

The export payment follows a monthly rule. HERA publishes an unofficial consolidated text of the Renewable Energy Act (Narodne novine 138/21, with changes in 83/23 and 78/25). Article 51 says suppliers must buy surplus power from eligible customers. Export capacity must be no higher than import capacity and no more than 500 kW. The billing period is one calendar month. For a customer with own generation, the value is 0.9 times the average energy price the customer pays the supplier. That price leaves out regulated network charges and fees. Sometimes the customer exports more than it takes from the grid in a month. Then the value is scaled by the energy taken divided by the energy exported. For a household self-supply user, a factor called kSO replaces 0.9. It is set by an incentive framework and cannot be above 1. The value applies for ten years from the permanent operation certificate.

The rule changes for new household users in 2026. Article 8 of the 2023 amendment says the self-supply system in force from 2024 applies until 31 December 2025. A new system was to start on 1 January 2026. HEP’s news item of 24 September 2025 says the 2025 amendment (NN 78/25) ends net billing from that date. After it, all energy taken from the grid is billed. Exported energy is valued under Article 51, paragraph 7, which gives household self-supply users the factor kSO. HEP says household customers who sent a complete connection request to HEP ODS by 31 December 2025 keep net billing for ten years from the permanent operation certificate. The consolidated text sets no kSO number, because kSO comes from the incentive framework in Article 53. We did not find a 2026 kSO value on a government page. So a proposal tool needs the customer’s current supplier terms as an input.

Connection goes through HEP ODS. The HEP ODS page says a customer who adds a solar plant to an existing installation applies to HEP ODS. The application is for an electricity approval (EES, elektroenergetska suglasnost). It says not to connect without HEP ODS consent and supervision. HEP Elektra’s page for customers with own generation says a signed supply or purchase contract is needed before HEP ODS issues the permanent operation certificate. Billing starts from the date on that certificate. A contract request needs either the notice of connection possibility or the electricity approval.

The Fund pays a grant to homeowners. The Environmental Protection and Energy Efficiency Fund (FZOEU) news item of 1 September 2026 describes a 38 million euro call. It pays up to 50% of eligible costs, or up to 70% for households at risk of energy poverty. Solar is up to 6,000 euro, with a maximum of 600 euro per kW. For the higher rate it is up to 8,400 euro, with 840 euro per kW. A battery can only be applied for together with a solar plant. Applicants must own or co-own a family house and live there. Applications opened on 2 September 2026 at 9:00 through the eFZOEU system. The page does not state a deadline. A proposal for a home needs a grant line that follows these caps.

Currency and language. The law text states values in euro per kWh. Croatian homeowners will expect euro quotes and Croatian text. Only PV*SOL lists Croatian as a language on the pages we read.

Regulator pointer. HERA (hera.hr) describes itself as an agency that regulates energy activities in the Republic of Croatia. Start there for the current self-supply rules.

How We Ordered These Tools

SurgePV publishes this page and is a vendor on this list. Its entry uses the same vendor-page sources and template as every other tool here.

We did not rank these tools. They are listed alphabetically, and the best-for picks come from the matrix above.

  • Croatian output: a Croatian homeowner expects to read the quote. We did not assess translation quality.
  • Price in euro: a euro price shows what a Croatian buyer will pay. We did not assess discounts or negotiated quotes.
  • Export or tariff modeling: the export payment changes payback. We did not assess whether any tool models the monthly rule correctly.
  • Single line diagram: the grid operator asks for drawings. We did not assess whether any output is accepted by HEP ODS.
  • Fund grant line: the grant is the first number a homeowner asks about. We did not assess how any tool applies the caps.
  • Free option: a free plan or trial lets a small team test the workflow. We did not assess the limits beyond what each page states.

Not Compared Here

HelioScope is not compared on this page, to keep the list to five tools we re-read for Croatian items. Solargraf is not compared on this page. Its site, solargraf.com, returned HTTP 403 to automated reads, including a headless browser, in October 2026.

Sources and Dates

Vendor pages were read in October 2026.

  • Aurora: pricing and the help articles above.
  • OpenSolar: free page and the help center articles above.
  • PV*SOL: shop page and the product page above.
  • PVsyst: shop page and the help pages above.
  • SurgePV: pricing.
  • Local sources: the HERA consolidated Act, the HEP pages and the FZOEU news item linked above. The HEP Elektra page shows no date.

Help-center articles were read in a browser.

See SurgePV on your own project

Book a guided demo and ask for the Croatian lines you need in the proposal.

Book a Free Demo

Go Deeper on a Category

Frequently Asked Questions

What is the best solar software in Croatia?

It depends on the job. From what the vendors publish, PV*SOL premium is the one whose shop page lists Croatian among its ‘Presentation’ languages and shows a price in euro. OpenSolar’s core app is free. PVsyst documents feed-in and self-consumption tariffs and prices in Swiss francs. Aurora and SurgePV do not name Croatia on the pages we read. No vendor states the Croatian monthly export rule, so ask each one to model a real job.

How does Croatia pay for solar power that a home sends to the grid?

The Renewable Energy Act says suppliers must buy surplus power from eligible customers, with export capacity no higher than import capacity and no more than 500 kW. The billing period is one calendar month. For a customer with own generation, the value is 0.9 times the average energy price, scaled down if the customer exports more than it takes. HEP says net billing ends for new household self-supply users on 1 January 2026. Check the current formula with the supplier.

Is there a grant for home solar in Croatia?

Yes. The Environmental Protection and Energy Efficiency Fund opened a 38 million euro call for citizens on 2 September 2026. It pays up to 50% of eligible costs, or up to 70% for households at risk of energy poverty. Solar is capped at 6,000 euro, or 8,400 euro for the higher rate. Batteries can only be applied for together with a solar plant. The page does not state a deadline.

Can solar software produce Croatian-language output?

PV*SOL premium’s shop page lists Croatian under ‘Presentation’ languages. The page does not define that label, and the vendor’s product page says project reports come in 24 languages. Its program interface is not in Croatian. The language lists we read for OpenSolar and PVsyst do not include Croatian. The pages we read for Aurora and SurgePV do not state a Croatian option.

What do I need to connect a rooftop system in Croatia?

HEP ODS says a customer who adds a solar plant to an existing installation applies to HEP ODS for an electricity approval and must not connect without its consent. A signed supply or purchase contract is needed before HEP ODS issues the permanent operation certificate. Billing starts from the date on that certificate.

How much does solar software cost in Croatia?

Only PV*SOL publishes a euro price: 845 euro plus VAT for a one-year named-user license of premium. PVsyst 8 Professional is 700 Swiss francs per year. OpenSolar’s core app is free. Aurora lists 159 dollars per user per month for Basic. SurgePV lists 1,899 US dollars per user per year for one user. Ask for a written euro quote with VAT shown.

About the Contributors

Author
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Editor
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Ready to Design and Propose Faster?

SurgePV covers solar design, energy-yield modeling, financial modeling, and proposals in one platform. Book a guided demo to see it on a project like yours.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.