Pick by the job. Photonik states it is free of charge today and says it supports solar planning in over 190 countries. PVsyst documents P50 to P90 yield results, priced in Swiss francs per year. HelioScope lists P90, P95 and P99 values on its Pro plan, priced in dollars. Aurora Solar covers design and interactive sales proposals, per user. SurgePV lists roof modeling, bill of materials (a parts list) and proposals in one product, priced per user in US dollars. No vendor here states a Serbian interface, a Serbian tariff, an EPS Distribucija output or a dinar price on the pages we read.
Two short terms help. A prosumer (kupac-proizvođač) is a customer who produces power for own use and sends surplus to the grid. SLD means single line diagram, a simple drawing of how the system is wired.
This is a desk comparison of what each vendor publishes, checked November 2026. We have not run side-by-side tests. SurgePV publishes this page and is one of the five tools on it. Tool facts come from each vendor’s own site. Local rules come from EPS and from a news report of the distribution operator’s guide. Other tools are not compared here. See the global list of solar design software for them.
Criteria used: Serbian interface or proposals, diagram for the grid operator, tariff and surplus entry, price currency, yield evidence.
Want to see SurgePV on your own project?
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Serbia
- A free planning tool to try early designs: Photonik. The vendor says it is currently free of charge for all users. It lists shading analysis and battery selection in Pro. It states no Serbian interface, and its pricing may change.
- Yield evidence for a large roof or a lender: PVsyst. Its help describes P50 to P90 evaluations. Serbian is not among its translations, and it runs on Windows only.
- Commercial design with P90 to P99 values: HelioScope. The Pro plan lists P90, P95 and P99 values, financial modeling and sales proposals. Prices are in dollars per licence.
- Residential design with interactive sales proposals: Aurora Solar. Priced per user per month in dollars. The pages we read state no Serbian language support.
- Roof model to bill of materials and proposal in one product, priced per user: SurgePV. Ask in a demo for Serbian output and net metering entry. Its published scope states neither.
Comparison Table
Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked November 2026 on each vendor’s own page.
| Tool | Best for | Price | Free or paid | Decisive scope fact |
|---|---|---|---|---|
| Aurora Solar | Design, shading and interactive proposals, per user | Basic $159 per user per month; $135 per user per month billed annually | Paid | No language, diagram or P-value claim on the pages read |
| HelioScope | Commercial design with P90 to P99 on Pro | Basic $159 per licence per month; Pro $259 | Paid | P90, P95, P99 on Pro; no languages stated |
| Photonik | Free early-stage planning | Free of charge today, per the vendor | Free of charge today | Says 190+ countries; pricing may change |
| PVsyst | Yield evidence for lenders | CHF 700 per year (Professional) | Paid, one-month trial | Documents P50 to P90; Windows only |
| SurgePV | Roof model to BOM and proposal, per user | $1,899 per user per year (individual plan) | Paid, guided demo | BOM and proposal generation in scope; no local output stated |
Serbia Criteria Matrix
Each cell is Documented, Partial or Not stated, based on the vendor pages we read in November 2026. They are linked in the entries and under Sources and Dates. Documented means the page states it for this task. Partial means the page lists a related feature but not the Serbian item. Not stated means the pages we read do not mention it. There are no scores or weights.
| Tool | Serbian interface | Diagram for the grid operator | Tariff and surplus entry | Price currency | Yield evidence |
|---|---|---|---|---|---|
| Aurora Solar | Partial (European sites in German, Spanish, French and English; app language not stated) | Not stated | Not stated | Partial ($ sign; currency not named) | Not stated |
| HelioScope | Not stated | Not stated | Partial (financial modeling on Pro) | Documented (USD) | Documented (P90, P95 and P99 on Pro) |
| Photonik | Not stated | Not stated | Partial (savings and payback in Lite; tariff entry not described) | Partial ($0 today; no fixed price promised) | Not stated |
| PVsyst | Not stated (Serbian not among the translations) | Not stated | Not stated | Documented (CHF) | Documented |
| SurgePV | Not stated | Partial (electrical workflow support listed) | Partial (financial modeling listed) | Documented (USD) | Not stated (energy-yield modeling listed) |
Two things stand out. No vendor page we read mentions EPS Distribucija, net metering or a Serbian tariff. The tools differ most on whether they document P50 to P90 and whether they draw a diagram.
Tool Entries
Aurora Solar
Best for: teams that want design, shading analysis and interactive sales proposals on a per-user plan priced in dollars.
Not the right choice if: you need a price in dinars or euros, or a Serbian interface. The pages we read state neither.
What the vendor documents: Aurora says it “models the roof, places panels, runs shading analysis, and generates a code-compliant layout in one session” and covers battery storage. Its Sales Mode “turns your Aurora design into a customized, interactive proposal”. The site has a region selector with North America and Europe, and European sites for Germany, Spain, France, the United Kingdom and a general English one. The pages we read make no language claim for the app or the proposals.
Price (checked November 2026): on the pricing page, Basic is $159 per user per month, or $135 per user per month billed annually ($1,620 a year). Premium is $259 per user per month, or $220 per user per month billed annually ($2,640 a year). The page uses a $ sign without naming the currency. It shows North America as the selected region.
Limitations: the pages we read name no EPS Distribucija, no Serbian tariff and no Serbian item.
Vendor link: aurorasolar.com.

HelioScope
Best for: commercial and industrial designers who want a design and sales tool with stated production and financial outputs, priced per licence in dollars.
Not the right choice if: you need a Serbian interface or a euro price. The pages we read state neither. It is also not the cheapest option, because Photonik states it is free of charge today.
What the vendor documents: the home page calls HelioScope a commercial solar-plus-storage design and sales tool, to “Design, simulate, and sell in one solution” for rooftop, carport and ground-mount projects. It says built-in tools produce production estimates that lenders accept. The pricing page lists P90, P95 and P99 values, financial modeling and sales proposals on the Pro plan. Basic covers designs up to 1.25 MW DC and Pro up to 5 MW DC. The page does not state supported languages or weather data coverage.
Price (checked November 2026): Basic is $159 per licence per month, or $1,620 per licence per year. Pro is $259 per licence per month, or $2,640 per licence per year. Each includes 1 user and 10 projects per month. Enterprise is custom, and the page says the yearly option saves 15%.
Limitations: the pages we read name no EPS Distribucija, no Serbian tariff and no Serbian item.
Vendor link: helioscope.aurorasolar.com.

Photonik
Best for: installers who want a free web planning and proposal tool to try early-stage designs.
Not the right choice if: you need a written price you can rely on long term (the pricing page says it is “currently free of charge for all users” and that Photonik plans to “always keep Photonik very affordable”), a stated Serbian interface, or documented yield statistics such as P50 to P90.
What the vendor documents: the home page says Photonik “supports solar planning in over 190 countries” and that data and rebates vary by region. Lite is a free planning tool for homeowners. Pro is described as “a full design and proposal platform for solar installers and energy professionals”, with shading analysis, battery product selection and client-ready proposals. The page does not mention supported languages.
Price (checked November 2026): the home page lists Pro as $0 for designs: “pay for solar leads on demand”. The pricing page says Photonik is “currently free of charge for all users”. It does not say how the vendor earns money.
Limitations: the pages we read name no EPS Distribucija, no Serbian tariff and no Serbian item. They do not describe the shading method.
Vendor link: photonik.solar.

PVsyst
Best for: yield evidence on a large roof or a ground-mounted site, where a lender or investor wants a simulation report.
Not the right choice if: you want proposals from the same tool, a Serbian screen, or you work on a Mac. The product page says PVsyst runs only on Windows.
What the vendor documents: a P50 to P90 evaluation. Its help says the annual production has a 50% probability of exceeding the P50 value, and that P90 is the value production should exceed 90% of the time. The languages page lists French, German, Spanish, Portuguese, Italian, Turkish, Korean, Chinese, Japanese, Polish and Russian as translations beside English. Serbian, Slovak and Slovenian are not listed, and the documentation is not translated.
Price (checked November 2026): CHF 700 per year for PVsyst 8 Professional, with grouped-order discounts of 5% for 2 to 4 licences, 15% for 5 to 9 and 20% for 10 or more. The product page offers a one-month free trial. No euro price is published on the pages we read.
Limitations: the pages we read name no EPS Distribucija, no Serbian tariff and no Serbian item.
Vendor link: pvsyst.com.

SurgePV
SurgePV is our product.
Best for: teams that want roof modeling, shading, yield, financial modeling, bill of materials and proposals in one product, priced per user. Ask in a demo for Serbian output and Serbian tariff and net metering entry.
Not the right choice if: you want a self-serve trial (SurgePV offers a guided demo), or you need a euro price in writing before talking to sales. The pricing page we read lists US dollars. It is also not right if you want a free tool for small jobs, because Photonik states it is free today. Outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender or utility. SurgePV’s published product scope does not list a CRM (customer tracking tool), monitoring or ERP (business management software).
What the vendor documents: 3D roof modeling, array layout and shading analysis. It also lists energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar design software for the product page.
Price (checked November 2026): $1,899 per user per year for the individual plan, in US dollars.
Limitations: results depend on source data, assumptions and equipment models. The pricing page and published scope do not state a Serbian interface, a Serbian tariff or P50 to P90 results.
Vendor link: surgepv.com.

Serbian Rules That Shape the Choice
Net metering and net billing. The EPS prosumer page, dated 1 April 2022, says net metering is for households and net billing is for companies. Under net billing the price for power taken from the grid does not have to match the price for power fed in. The same EPS page reports its first Full Supply Contract with Net Billing for a commercial prosumer, signed on 30 March 2022 for a 500 kW roof plant. It also says the installed capacity of the plant must not exceed the approved connection capacity of the customer’s facility. Model the two cases separately.
Households up to 10.8 kW. Balkan Green Energy News reports a guide that Elektrodistribucija Srbije (EDS) published on 11 October 2021 for households installing panels up to 10.8 kW. It lists three conditions: a plant no larger than the existing approved connection capacity, an adapted metering point, and a full supply contract with net metering. The customer is then entered in the register of prosumers kept by the distribution operator. A licensed firm builds the plant and issues a safety certificate. After EDS checks the contract confirmation and the certificate, it issues a connection certificate. The guide dates from 2021 and the rules may have changed, so ask the distribution operator for the current steps.
Units and language. Official documents are in Serbian, amounts in Serbian dinars (RSD) and energy in kWh. We did not find a vendor that states a dinar price.
Regulator pointers. Use EPS for the prosumer contracts and the distribution operator for connection and metering steps.
What to Ask a Vendor Before Buying
Ask each vendor for one sample project. Then look for these items. First, a Serbian proposal for your client. Second, the single line diagram you would give the distribution operator. Third, a way to enter your tariff and a surplus export. Fourth, a price in dinars or euros, the currency you will be invoiced in. Fifth, a yield report if a lender will read it. Where a vendor does not publish a feature on the pages we read, the matrix says so. A demo or trial is the place to confirm it.
How We Ordered These Tools
We did not rank these tools. They are listed alphabetically, and the best-for picks come from the matrix above.
- Serbian interface or proposals: your clients and official papers use it. We did not assess the quality of any translation.
- Diagram for the grid operator: EPS Distribucija reviews your connection file. We did not assess whether any tool’s diagram meets its format.
- Tariff and surplus entry: savings depend on the tariff and on how surplus power is settled. We did not assess whether any calculation is correct.
- Price currency: the currency shows what a buyer will pay and whether VAT is added. We did not assess discounts or negotiated quotes.
- Yield evidence: larger projects may need a report a lender will read. We did not assess acceptance by any lender.
- Local incentive fit: we did not find a published Serbian subsidy to test against, so we did not use one.
Sources and Dates
Vendor pages were read in November 2026. Aurora Solar (pricing, home page). HelioScope (pricing, home page). Photonik (home page, pricing). PVsyst (shop, product, languages, P50 to P90). SurgePV (pricing). Serbian sources are the EPS news page and the Balkan Green Energy News report linked above. The guide report is a 2021 secondary source.
Go Deeper on a Category
- Solar design software for Serbia
- Solar proposal software for Serbia
- Solar software in Bosnia and Herzegovina, a neighbor market
- Solar software in Croatia, a neighbor market
- Best solar design software, all markets
- SurgePV pricing
Frequently Asked Questions
What is the best solar software in Serbia?
It depends on the job. Photonik says it is free of charge today. PVsyst documents P50 to P90 yield results and prices in Swiss francs. HelioScope lists P90, P95 and P99 values on its Pro plan. Aurora Solar prices per user in US dollars. SurgePV lists roof modeling, bill of materials and proposals in one product. None of the vendor pages we read states a Serbian interface, a Serbian tariff or a dinar price.
Is there free solar software for Serbia?
Photonik says it is currently free of charge for all users and that it supports solar planning in over 190 countries. The pages we read do not state a Serbian interface or Serbian tariffs, and the vendor says it plans to keep Photonik very affordable rather than free for good. Test it with a real Serbian electricity bill before relying on it.
How does Serbia treat prosumers?
An EPS page dated 1 April 2022 says net metering is for households and net billing is for companies. It also says the plant must not exceed the approved connection capacity of the customer’s facility. A news report on a 2021 guide from the distribution operator describes households up to 10.8 kW with a register of prosumers. Ask the distribution operator for the current steps.
Does PVsyst work in Serbian?
The PVsyst languages page lists translations into French, German, Spanish, Portuguese, Italian, Turkish, Korean, Chinese, Japanese, Polish and Russian beside English. Serbian is not listed, and the documentation is not translated. PVsyst runs on Windows only.
How much does solar software cost in Serbia?
Each vendor uses its own currency, and none publishes a dinar price. Photonik says it is free of charge today. PVsyst 8 Professional is 700 Swiss francs per year. HelioScope Basic is $159 per licence per month, or $1,620 per licence per year. Aurora Basic is $159 per user per month, or $135 per user per month billed annually. SurgePV lists $1,899 per user per year for the individual plan.


