Back to Best Solar Software
Best ListBest-Of List5 tools compared

Solar Design Software in Croatia: Five Tools Compared (2026)

Five solar design tools compared on what each vendor publishes for work in Croatia: single line diagrams, P50 to P90 yield, languages, price and platform. Checked October 2026.

SurgePV publishes this list and sells solar design and proposal software, so we have a commercial interest in this category. This is a desk comparison of what each vendor publishes; we have not run side-by-side tests. Prices and vendor facts checked October 2026. How we evaluate software

Published Last updated
Akash Hirpara

Written by

Akash Hirpara

Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

If you design solar systems in Croatia, start with the job. Aurora Solar prices per user in US dollars and describes its estimates as P50 values. HelioScope lists a dollar price and designs up to 5 MW DC on its Pro plan. PVcase documents ground-mount layout and single line diagram export. PVsyst documents P50 to P90 yield. SurgePV documents roof modeling through proposals but states no ground-mount, tracker or diagram output. None of this page’s sources is a Croatia regulator, so it makes no claim about Croatia’s grid code, tariffs or incentives.

This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side tests. SurgePV publishes this page and is one of the 5 tools on it. Tool facts come from each vendor’s own site. Single line diagram (SLD) means a simple drawing of how the system is wired. P50 and P90 are yields with a 50% and a 90% probability of being met or exceeded in a year. A bill of materials (BOM) is a parts list.

Criteria used: single line diagram, P50 to P90 yield, interface or proposal languages, price and currency, where the tool runs.

This page compares 5 tools. Other tools are compared on the global design list. HelioScope is an Aurora Inc. company, and both appear here as separate products.

Want to see SurgePV on your own project?

Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Best-For Picks for Croatia

  • Design and sales proposals on a per-user plan: Aurora Solar. Its pricing page lists Basic at $159 per user per month and Premium at $259, with lower annual rates. Its help pages describe estimates as P50 values and the SLD editor as only available in Europe.
  • Dollar-priced commercial and mid-size plants: HelioScope. Its Pro plan lists designs up to 5 MW (DC) and P90, P95 and P99 values. Enterprise lists designs up to 30 MW (DC) and single-axis trackers. Its help article lists a single-line diagram export.
  • Ground-mount plants with terrain, piling and a diagram: PVcase. Its Ground Mount plan page lists terrain-aware layouts, slope and collision analysis, piling analysis and single line diagram export. It is built on AutoCAD. Its price is given only through sales.
  • A P50 to P90 yield report: PVsyst. Its help page documents the P50 to P90 tool, and its product page lists 12 software languages. It runs on Windows only.
  • Roof model to bill of materials and proposal in one product, priced per user: SurgePV. It documents roof modeling, shading, yield, financial modeling, bill of materials and proposals. Ask in a demo about diagrams, ground-mount layout and P50 to P90 yield. Its published scope names none of them.

Comparison Table

Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked October 2026 on each vendor’s own page, in the currency the vendor publishes.

Tool Best for Price Free or paid Decisive fact
Aurora Solar Design and sales proposals, per user Basic $159 per user per month; $135 billed annually Paid SLD editor “only available in Europe”; P50 only
HelioScope Dollar-priced commercial and mid-size plants $159 or $1,620 per license (Basic); $259 or $2,640 (Pro), per month or per year Paid Single-line diagram export; P90, P95, P99 on Pro
PVcase Ground-mount plants with terrain and diagrams Not published (sales) Paid Single line diagram export; built on AutoCAD
PVsyst P50 to P90 yield reports CHF 700 per year (Professional) Paid; one-month free trial P50 to P90 tool; Windows only
SurgePV Roof model to BOM and proposal, per user $1,899 per user per year (1 user), in US dollars Paid, guided demo BOM and proposals in scope; no diagram or P50 to P90 item stated

Croatia Criteria Matrix

Each cell is Documented, Partial or Not stated. Documented means the vendor’s own page states it. Partial means the page states a related feature but not the full item. Not stated means the pages we read in October 2026 do not say. There are no scores or weights. A tool that does not state an item may still support it, so ask each vendor to produce the item for one real Croatia site.

Tool Single line diagram P50 to P90 yield Languages listed Price and currency Runs in
Aurora Solar Partial (editor listed for Europe; ask whether it covers Croatia) Partial (P50 only; no native P90) Partial (French help centre and Europe site; app language not stated) Documented (USD, per user) Not stated
HelioScope Documented (help article) Documented (P90, P95, P99 on Pro) Not stated Documented (USD, per license) Browser (help article recommends Chrome or Firefox)
PVcase Documented (Ground Mount plans) Partial (PVcase Yield plans list P50, P90) Not stated Not published AutoCAD (Ground Mount)
PVsyst Partial (grid-connected only, no storage, work in progress) Documented Documented (12 languages; English is the reference) Documented (CHF) Windows only
SurgePV Not stated (electrical workflow support listed) Not stated (energy-yield modeling listed) Not stated Documented (USD) Web

Tool Entries

Aurora Solar

Best for: sales teams in Croatia that want design and proposals on a per-user plan and can live with a US-dollar price list.

Not the right choice if: Croatia lenders ask for P90 yield, which Aurora does not natively output for solar energy production, or you need a single line diagram from an editor that covers your area. Prices are in US dollars.

What the vendor documents: P-values: the help article on P-values says Aurora’s estimates are P50 values from typical-year weather data. Diagrams: the single line diagram editor page says the editor is only available in Europe. Tariffs: the help article on utility rates lets you set an export rate in dollars per kWh and a compensation policy. Language: Aurora’s help centre and Europe site offer French, and the pages read do not state the app or proposal language, so Croatian is unconfirmed.

Price (checked October 2026): on the pricing page, Basic is $159 per user per month, or $135 per user per month billed annually ($1,620 billed annually). Premium is $259 per user per month, or $220 per user per month billed annually ($2,640 billed annually). The page uses a $ sign without naming the currency. It shows North America as the selected region.

Limitations: no claim is made here about Croatia. Run a real Croatia site through the tool before buying.

Vendor link: aurorasolar.com.

Aurora Solar public website page, captured 29 October 2026
Aurora Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

HelioScope

Best for: Croatia teams designing commercial and mid-size plants that want a dollar price visible before a sales call.

Not the right choice if: your Croatia plant exceeds the plan size caps or you need an interface language list. The pricing page lists designs up to 1.25 MW (DC) on Basic, up to 5 MW (DC) on Pro and up to 30 MW (DC) on Enterprise; no page read lists interface languages.

What the vendor documents: the base plan lists rooftop, carport and ground mount on all projects and storage design. Pro adds LIDAR-assisted modeling, financial modeling, sales proposals, and P90, P95 and P99 values. Enterprise adds unlimited users, single-axis trackers, export to PVsyst, API access and SSO (single sign-on). The export article says you can export a .dxf CAD file and a single-line diagram, “a simple electrical schematic”, which suits a Croatia file. HelioScope is “an Aurora Inc. Company”. A help article recommends Google Chrome or Firefox for the design tool.

Price (checked October 2026): Basic $159 USD per license per month or $1,620 USD per license per year, including 1 user. Pro $259 USD per license per month or $2,640 USD per license per year, including 1 user. Enterprise is custom per-project pricing. All from the pricing page.

Limitations: no claim is made here about Croatia. Run one real Croatia site first.

Vendor link: helioscope.aurorasolar.com.

HelioScope public website page, captured 29 October 2026
HelioScope public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVcase

Best for: engineering teams in Croatia that design ground-mount plants and want terrain, piling and diagrams in one CAD-based workflow.

Not the right choice if: a published price or a non-AutoCAD tool is a must. Its home page says PVcase Ground Mount is “built on AutoCAD”, so ask whether a separate AutoCAD licence is needed.

What the vendor documents: the Ground Mount plan page lists terrain-aware layouts, slope analysis, collision analysis, piling analysis and ground grading, plus stringing, cable sizing and voltage drop, single line diagram export, bill of materials exports, BESS (battery storage) design and a QuickYield estimate. A vendor blog post covers terrain-following tracker optimization, and the PVcase Yield page lists “built-in probability scenarios (P50, P90)”.

Price (checked October 2026): not published. The home page says, “We don’t offer a complete price list online”. The plan pages say to talk to sales.

Limitations: no claim is made here about Croatia. Run one real Croatia site through a demo before buying.

Vendor link: pvcase.com.

PVcase public website page, captured 29 October 2026
PVcase public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVsyst

Best for: Croatia teams that need a yield report with P50 to P90 values for a lender or investor.

Not the right choice if: you need a browser tool or a tool that lays out ground-mount rows for you; the pages read describe a 3D scene you model yourself. The product page says PVsyst only runs on Windows and needs one license per computer.

What the vendor documents: design for grid-connected, standalone and pumping systems, a 3D scene you model, unlimited orientations, and single or dual-axis trackers with backtracking. Weather sources include Meteonorm 9, NASA-Power and PVGIS-TMY, and the economic assessment gives NPV, LCOE and ROI. The P50 to P90 help page says annual production has a 50% probability of exceeding P50 and a 90% probability of exceeding P90. The single line diagram page says the diagram feature is only for grid-connected systems, excludes storage and is “still work in progress”. Of its 12 software languages, French is listed; Croatian is not named.

Price (checked October 2026): PVsyst 8 Professional is CHF 700 per year, updates included. Group discounts are 5% for 2 to 4 licences, 15% for 5 to 9 and 20% for 10 or more. The product page lists a one-month free trial. The price is in Swiss francs.

Limitations: no claim is made here about Croatia. Run one real Croatia site through the trial before buying.

Vendor link: pvsyst.com.

PVsyst public website page, captured 29 October 2026
PVsyst public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV

SurgePV is our product.

Best for: Croatia teams that want roof modeling, shading, yield and financial modeling in one product, with a bill of materials (the parts list) and proposals, priced per user. Ask for the Croatia outputs you need in a demo.

Not the right choice if: you want a self-serve trial (SurgePV offers a guided demo), design ground-mount plants with terrain and tracker layout, or need a single line diagram or P50 to P90 yield in writing; the published scope lists roof modeling and array layout, not those. Outputs support design and documentation and do not replace approval by the responsible engineer, authority, lender or utility. A CRM (customer tracking tool) is not in the published scope, and monitoring and ERP (business management software) are outside it.

What the vendor documents: 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar design software for the product page.

Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.

Limitations: results depend on source data, assumptions and equipment models. The published scope does not state a single line diagram, ground-mount or tracker layout, P50 to P90 yield or an interface language list. No Croatia output claim is made here.

Vendor link: surgepv.com.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Language Check for Croatia

Clients in Croatia may expect Croatian. PVsyst lists French among 12 software languages and says English is the reference language. Its help pages are in English. Aurora’s help centre and Europe site offer French; the pages we read do not state the language of the app. The HelioScope, PVcase and SurgePV pages we read do not list interface languages. Vendor lists change, so ask for a sample proposal in Croatian before you buy.

Croatian Connection and Sizing Rules That Shape a Design

The Croatian Energy Regulatory Agency (HERA) adopted a decision on an incentive framework for self-consumption of renewable energy on 16 July 2026, under Article 53 of the Act on Renewable Energy Sources and High-Efficiency Cogeneration. The decision document runs to about 160 pages and describes the rules a design has to fit. The PDF read for this page is headed as the proposal for adoption, version of 13 July 2026, so the adopted wording may differ. Figures below are as of November 2026.

Feed power may not exceed draw power. The document says the conditions for a customer with own production included delivering through the same billing metering point used for purchase, a connection power in the feed direction no larger than in the draw direction, and at most 500 kW for all generating plants on that point. It adds that where the law left out the connection-power condition, customers installed oversized plants. In a design file this means the inverter AC export limit must be shown against the approved draw power.

An annual balance can change a customer’s status. A household self-supply user is defined as a household customer whose yearly export is at most its yearly import. The document says that if export exceeded import in the previous year, the customer is treated in the current year as an ordinary customer with own production, and that many were unaware because they had installed oversized plants. Size to annual load, and let the tool report the annual export to import ratio.

Meters and shared plants. For customers acting jointly, the billing points and the plant must have an advanced meter that meets the distribution network rules. Surplus purchase for such groups applies where the combined feed-in connection power is at most 500 kW, and the distribution operator reports connection power and energy flows monthly to HERA, the market operator and the ministry.

Typical size. Citing HERA’s 2024 annual report, the document gives an average feed-in connection power of 7.73 kW for self-supply users at the end of 2024. Half had up to 6 kW and 95% had up to 15.0 kW, and the most common band was above 2 kW up to 4 kW at 29.57%. A residential design tool needs to handle the 3 to 15 kW range well.

Connection fee. HERA’s notice of 27 April 2026 says its board adopted a decision on the unit amount of the grid connection fee, effective 1 May 2026. The page does not give amounts or exemptions.

Irradiation reference. PVGIS for Zagreb (45.815 N, 15.982 E, 129 m; 1 kWp, 14% losses) gives 1,234 kWh a year at 35 degrees facing south. At 15 degrees the result is 1,171 kWh, 5.2% lower, with December falling from 45.6 to 35.2 kWh.

For the market see Best Solar Software for Croatia, for settlement and customer numbers see Best Solar Proposal Software for Croatia, and for the general category see Best Solar Design Software.

What to Ask a Vendor Before Buying

Ask each vendor for one sample Croatia project. Then look for these items. First, a single line diagram you could hand to the local utility. Second, a P50 to P90 yield report if a lender will read it. Third, output in Croatian if your client needs it. Fourth, a price in the currency you will be invoiced in. Where a vendor does not publish a feature on the pages we read, the matrix says so. A demo or trial is the place to check it.

How We Ordered These Tools

We did not rank these tools. They are listed alphabetically, and the best-for picks come from the matrix above.

  • Single line diagram: utilities and authorities often ask for one. We did not assess whether any tool’s diagram meets a particular utility’s format.
  • P50 to P90 yield: lenders and investors read these values. We did not assess whether any report is accepted by a lender.
  • Languages: we only report the language lists the vendors publish. We did not assess translation quality or the report language for Croatia.
  • Price and currency: a published price lets you plan before a call. We did not assess discounts or negotiated quotes.
  • Runs in: a Windows-only or CAD-based tool limits who can open a file. We did not assess speed or file size.

Sources and Dates

Vendor pages were read in October 2026. They are Aurora Solar (pricing and three help articles), HelioScope (pricing and help articles), PVcase (Ground Mount plans, Yield plans, home page and a blog post), PVsyst (product, shop and help pages) and SurgePV (pricing). Help-centre articles were read in a browser. SurgePV publishes this page and is a vendor on the list. No government or regulator page is used on this page.

Croatia grid and sizing facts were read in November 2026 from the regulator HERA: the notice of 21 July 2026, the decision document and the notice of 27 April 2026. Irradiation figures come from PVGIS for Zagreb at 35 degrees and 15 degrees.

See SurgePV on your own project

Book a guided demo and ask which of the outputs you need for a Croatia project it can produce.

Book a Free Demo

Go Deeper on a Category

Frequently Asked Questions

What is the best solar design software for Croatia?

It depends on the job. Aurora Solar prices per user in US dollars and describes its estimates as P50 values. HelioScope lists a dollar price and designs up to 5 MW DC on its Pro plan. PVcase documents ground-mount layout and single line diagram export. PVsyst documents P50 to P90 yield. SurgePV documents roof modeling through proposals but states no ground-mount, tracker or diagram output. This page makes no claim about Croatia’s grid code, tariffs or incentives, so test each tool on one real Croatia site.

Which solar design tools make a single line diagram for Croatia?

Aurora’s help page says its single line diagram editor is only available in Europe. HelioScope lists a single-line diagram among its exports. PVcase lists single line diagram export on its Ground Mount plan page. PVsyst has a single line diagram editor for grid-connected systems, which it calls work in progress and which does not include storage. SurgePV’s published scope lists electrical workflow support but no diagram output. Ask each vendor to produce the diagram for one real Croatia project.

Which solar design tools document P50 to P90 yield?

Aurora’s estimates are P50 values and it does not natively output P90. HelioScope Pro lists P90, P95 and P99 values. PVcase Yield plans list built-in P50 and P90 scenarios. PVsyst documents a P50 to P90 evaluation tool. SurgePV’s published scope lists energy-yield modeling but no P50 to P90 results. P90 is a yield expected to be met or exceeded in 90% of years, and P50 in 50% of years.

Does solar design software work in Croatian for Croatia?

PVsyst lists French among 12 software languages and says English is the reference language. Its help pages are in English. Aurora’s help centre and Europe site offer French; the pages we read do not state the language of the app. The HelioScope, PVcase and SurgePV pages we read do not list interface languages. Ask each vendor to show output in Croatian before you buy.

How much does solar design software cost for a team in Croatia?

Aurora Basic is $159 per user per month, or $135 per user per month billed annually. HelioScope lists $159 per month or $1,620 per year for Basic and $259 per month or $2,640 per year for Pro, per license. PVcase publishes no price. PVsyst 8 Professional is 700 Swiss francs per year. SurgePV lists $1,899 per user per year for one user. Prices were checked in October 2026 on each vendor’s own page, in the currency the vendor publishes.

Is there free solar design software for Croatia?

None of the vendors on this list states a free plan on the pages we read. PVsyst offers a one-month free trial. SurgePV offers a guided demo.

About the Contributors

Author
Akash Hirpara
Akash Hirpara

Co-Founder · SurgePV

Akash Hirpara is identified by SurgePV as a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; education, certifications, project totals, financial results, speaking engagements, and media appearances are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Ready to Design and Propose Faster?

SurgePV covers solar design, energy-yield modeling, financial modeling, and proposals in one platform. Book a guided demo to see it on a project like yours.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.