Slovenian plants are shaped by the operator’s consent, which for individual self-supply caps connection power at 80% of the consumption connection and can be cut back before the build. This list covers four tools, Aurora Solar, HelioScope, PVsyst and SurgePV, as each vendor publishes them. Prices stay in the vendors’ own currency, not euros.
The read is a desk comparison of public vendor pages, checked October 2026, with no side-by-side runs. SurgePV publishes this page and is one of the 4 tools on it. For a wider view, see the global list of solar design software.
Criteria used for a Slovenian job: inverter AC rating that can be compared with the consent, an as-built single line diagram, shading and yield, a module, inverter and optimizer parts list, Slovenian-language output, and published price.
Disclosure and methodology: SurgePV publishes this page and is one of the tools on it, so it has an interest in the result. Vendor facts come from public vendor pages read in October 2026; the connection rules come from the Elektro Primorska page cited below, which covers one operator only.
Want to see SurgePV on your own project?
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Slovenia Design Work
- A roof plant held to 80% of the connection power: HelioScope or Aurora Solar. HelioScope lists rooftop, carport and ground-mount layout on all plans, with P90, P95 and P99 on Pro. Aurora lists tablet-friendly proposals and integrated financing on all plans. Compare array and inverter sizing with the consent figure.
- A plant above 30 kW with a disconnection point and protection relay: PVsyst. Its help describes P50 to P90 evaluations for a lender. It runs on Windows only, and its single line diagram covers grid-connected systems without storage.
- One file from layout to parts list: SurgePV. The pricing page lists $1,899, $1,499 or $1,299 per user per year depending on seats. Ask whether it can output the as-built single-line diagram and the module, inverter and optimizer data the operator wants.
Comparison Table
Alphabetical, not ranked. Read each row against the 80% rule and the consent documents below.
| Tool | Best for | Price (checked Oct 2026) | Free or paid | One decisive scope fact |
|---|---|---|---|---|
| Aurora Solar | Residential sales and design | Basic $159 per user per month, or $135 billed annually; Premium $259, or $220 billed annually. Aurora pricing | Paid | Basic and Premium each include 1 user and 50 projects per month |
| HelioScope | Commercial solar-plus-storage | Basic $159 per license per month or $1,620 per year; Pro $259 per month or $2,640 per year. HelioScope pricing | Paid; vendor lists a free trial | Designs up to 1.25 MW DC (Basic), 5 MW (Pro), 30 MW (Enterprise) |
| PVsyst | Yield evidence | CHF 700 per year (PVsyst 8 Professional) | Paid, one-month trial | Documents P50 to P90 evaluations; Windows only |
| SurgePV | Design plus proposals in one subscription | Individual $1,899 per user per year (1 user); 3 seats $1,499 per user per year; 5 seats $1,299 per user per year. SurgePV pricing | Paid; guided demo, no self-serve trial | Roof modeling, layout, shading, yield, financial modeling, BOM, proposals |
Language Support for Slovenia
Slovenian is the language of the operator’s forms and the customer, but none of the vendor pages read for this list names Slovenian among its languages, and the other tools’ pages do not state their interface or proposal languages. They also name no Slovenian operator, tariff or permit rule. See the solar design workflow and shading analysis pages for SurgePV’s published scope.
Tool Entries
Alphabetical order. Each entry closes with how the tool fits a Slovenian self-supply file.
Aurora Solar
Best for: a Slovenian installer selling a self-supply roof plant to a household, who wants the layout, a tablet-friendly proposal and financing in one tool.
Not the right choice if: the job is a commercial roof; Aurora’s menu lists HelioScope for that. Aurora gives P50 values only, per its help article, which matters if a lender wants P90 on a plant above 30 kW.
What the vendor documents: 3D roof modeling and trees, performance simulation and automated panel placement. It also lists tablet-friendly proposals and integrated financing. It has an AHJ database of more than 25,000 US jurisdictions. AHJ means the local permit office. Premium adds LIDAR-assisted modeling (laser measuring of the site), bankable shade reports and battery modeling. Enterprise adds unlimited users and a contract manager (the pricing page tooltip says e-signature tools). It also adds APIs (links that let other software connect). Enterprise also adds drone mapping, dealer and team configurations, and advanced user permissions. It adds access to plan sets, engineering stamps and professional services. Aurora’s help centre lists a DXF export, a file other drawing programs can open. It also lists a Single-Line Diagram Editor. A single-line diagram is a simple drawing of how the system is wired. The article says the editor is only available in Europe.
Price (checked October 2026): Basic $159 per user per month billed monthly, or $135 billed annually ($1,620 per year). Premium $259 monthly, or $220 billed annually ($2,640 per year). Enterprise is custom. See Aurora’s pricing page.
Limitations: Plan sets and engineering stamps are listed as add-ons. Basic and Premium each include one user. Per its help article, Aurora gives P50 values only. A P50 value is a yield level expected to be met or exceeded in 50% of years. Aurora does not natively output P90.
Vendor link: aurorasolar.com

HelioScope
Best for: Slovenian commercial roofs, carports and ground mounts with storage, where the plant is sized against the connection power. Per its footer, HelioScope is an Aurora Inc. company with its own pricing.
Not the right choice if: your jobs are homes where financing integration drives the sale. HelioScope’s site describes commercial software; Aurora’s residential product is the better documented fit.
What the vendor documents: Rooftop, carport, ground-mount and battery layout on all plans. It also lists CAD (computer-aided design) export and single-line diagrams. It lists an 8760 production report (one result for each hour of the year) and shade reports too. The production report also lists a bill of materials with module, wire and inverter quantities (see the help article). Pro adds LIDAR-assisted modeling, storage modeling and financial analysis tools. Pro also adds customizable reports, sales proposals, and P90, P95 and P99 values. Enterprise adds single-axis trackers, designs up to 30 MW DC and export to PVsyst.
Price (checked October 2026): Basic $159 per license per month, or $1,620 per license per year. Pro $259 per month, or $2,640 per year. Enterprise is custom per project. See HelioScope’s pricing page. The standard free trial lasts 14 days, per its help article.
Limitations: Each Basic or Pro license covers one user. Enterprise lists unlimited users. Basic includes 10 projects per month, or 120 on annual billing. Basic designs up to 1.25 MW DC. Financials and sales proposals start at Pro.
Vendor link: helioscope.aurorasolar.com

PVsyst
Best for: a Slovenian plant above 30 kW, or a large roof or ground site, where an operator or lender expects a simulation report.
Not the right choice if: you need a proposal from the same tool (the pages read describe none), a diagram showing storage, which matters because the operator may propose adding a storage unit, or a Mac. The requirements page says PVsyst runs only under Windows.
What the vendor documents: a P50 to P90 evaluation. P50 and P90 are yields with a 50% and 90% probability of being exceeded in a year. The languages page says English is the reference language. It lists French among the translations. The documentation itself is not translated. The single line diagram page describes an editor and viewer for PV strings, inverters and transformers. It covers grid-connected systems only, leaves out storage, and calls the feature “still work in progress”. The economic evaluation help page covers feed-in tariffs and self-consumption.
Price (checked October 2026): CHF 700 per year for PVsyst 8 Professional, with grouped-order discounts of 5% for 2 to 4 licences, 15% for 5 to 9 and 20% for 10 or more. The product page offers a one-month free trial.
Limitations: the pages read describe no proposal output. They list the Windows-only requirement and the grid-connected-only diagram editor.
Vendor link: pvsyst.com.

SurgePV
SurgePV is our product, and we publish this list.
Best for: Slovenian teams that want roof layout, shading, yield, bill of materials and proposal from one model, priced per user. Ask for the as-built diagram in a demo. See the solar design workflow, shading analysis and proposal software.
Not the right choice if: you want a self-serve trial, because SurgePV offers a guided demo. Its outputs support design and documentation but do not replace the operator’s consent, the responsible engineer, lender or insurer, and its published scope lists no CRM, monitoring or ERP product. OpenSolar lists a free core app; PVcase lists AutoCAD-based utility-scale engineering on its own site.
What the vendor documents: 3D roof modeling, solar array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation.
Price (checked October 2026): Individual $1,899 per user per year (1 user). 3 seats $1,499 per user per year, or $4,497 a year in total. 5 seats $1,299 per user per year, or $6,495 a year in total. See SurgePV pricing.
Limitations: Results depend on source data, assumptions, equipment models, configuration and review. Pricing and contract terms are confirmed in a written quote. This page uses only SurgePV’s pricing page and product scope summary. They do not state ground-mount coverage or size limits, so those cells read “Not stated”. Ask for them in the demo.
Vendor link: SurgePV and Book a Free Demo

Slovenian Connection Rules That Shape a Design
Elektro Primorska, a Slovenian distribution operator, sets out technical conditions on its self-supply page. They come from one operator, so check the operator that serves your site. Here are the points that change a design file.
An 80% limit for individual self-supply. The page states the condition P_gen at most 0.8 times P_odjema, meaning the plant’s connection power may be at most 80% of the consumption connection power. For community self-supply it says the size of the generating device has no 80% limit. A tool that only sizes to the roof will not catch this, so enter the inverter AC rating and compare it to the consent.
Consent comes before the build, and the operator can change it. Before issuing a consent to connect, the operator checks the network and may propose reducing the plant’s power, adding a storage unit, connecting in consumer mode, or refusing consent. The plant must then be built as the consent describes, with small power deviations allowed up to 30 kW. Plan for a second layout at a reduced size.
Above 30 kW. The page says a non-distributed disconnection point is required, and that a separate contactor or circuit breaker plus a protection relay is needed.
Documents tied to the design. The connection application needs a statement on the self-supply plant, the self-supply agreement, electrical schemes including a single-line diagram of the metering point showing the as-built state, a user manual with module, inverter and optimizer data plus the reactive power characteristic, and a report on protection settings. The metering cabinet may hold only equipment permitted by the metering-point typification, and the user’s own meter must stay outside it.
Plug-in plants. Business users must stay under 800 W and never feed power into the grid. Household users may feed up to 600 W, and total power including batteries must not exceed 800 W. Plants of 800 W or more need a consent.
Choosing a tool. The as-built single-line diagram and the protection report mean a design tool that exports diagrams is a real advantage, and PVsyst, Aurora, HelioScope and the others differ on that. None of the vendor pages we read mentions the 80% rule or the operator’s documents. Ask each vendor to produce an as-built diagram for a sample plant.
What to Ask a Vendor Before Buying
Ask each vendor for a sample Slovenian self-supply plant. First, can you compare inverter AC rating with 80% of the connection power? Second, can it produce an as-built single-line diagram of the metering point and a parts list with module, inverter and optimizer data? Third, can you save a second, reduced-size layout if the operator cuts the power? Fourth, is the proposal in Slovenian and priced in your invoicing currency? A demo or trial is where to settle what a vendor leaves unstated.
See SurgePV on your own project
Book a guided demo and bring a roof, the equipment and the files you must deliver.
Book a Free DemoLive project walkthrough · No credit card required
How We Ordered These Tools
The tools are alphabetical with no score. Picks follow what each vendor documents and the operator rules above, not any run of the software.
- Roof and array design. A plant may have to be redrawn at reduced power. Not assessed: layout speed or roof-model accuracy.
- Shading and energy yield. Yield figures feed the offer and any lender report. Not assessed: agreement with measured generation.
- Financial modeling and proposals. A customer reads the proposal, not the design file. Not assessed: proposal quality or close rates.
- Electrical and bill-of-materials outputs. The connection application asks for diagrams and equipment data. Not assessed: whether outputs pass any review.
- Language support. Slovenian customers and the operator read Slovenian. Not assessed: translation quality.
- Published price. Buyers want a figure before a demo. Not assessed: discounts or total cost of ownership.
Go Deeper on a Category
- Solar software in Slovenia
- Solar proposal software in Slovenia
- Best solar design software, all markets
- Commercial solar design software
- Bankable solar simulation software
- Solar software for EPC companies
Sources and Dates
Vendor pages were read in October 2026. The regulatory facts come from the Elektro Primorska self-supply page, read in November 2026. Tool facts come from each vendor’s own public pages, linked here by tool. Aurora Solar (DXF export, Single-Line Diagram Editor, Aurora’s pricing page, help article). HelioScope (HelioScope’s site, help article, HelioScope’s pricing page, help article). PVsyst (requirements page, P50 to P90 evaluation, languages page, single line diagram page, economic evaluation help page, CHF 700 per year for PVsyst 8 Professional, product page, pvsyst.com). SurgePV (SurgePV pricing).
Frequently Asked Questions
What is the best solar design software in Slovenia?
HelioScope lists commercial rooftop, carport and ground-mount design with storage. Aurora Solar for residential sales with financing; PVsyst for yield evidence; SurgePV for design, financial modeling and proposals in one product. None of the vendor pages read names a Slovenia utility, tariff or permit rule, so test each tool on a sample Slovenia project.
What power limit applies to an individual self-supply plant in Slovenia?
Elektro Primorska states that the generating connection power of an individual self-supply plant must be at most 80% of the consumption connection power, written P_gen at most 0.8 times P_odjema. For community self-supply the page says there is no 80% limit. Above 30 kW a non-distributed disconnection point and a protection relay are needed.
Which design documents does a Slovenian operator ask for?
The Elektro Primorska page lists electrical schemes with a single-line diagram of the metering point in its as-built state, a user manual with module, inverter and optimizer data and the reactive power characteristic, and a report on protection settings, plus the statement on the plant and the self-supply agreement.
Is there free solar design software for Slovenia?
None of the tools here is free. PVsyst offers a one-month trial. SurgePV offers a guided demo.
Which solar design software works in the local language in Slovenia?
None of the vendors on this list names Slovenian on the pages read. The other tools here do not state their languages on the pages read, so ask each vendor to show your language in a demo or trial.
How much does solar design software cost for Slovenia teams?
Published prices differ in currency and unit, so they are not converted. Aurora Basic is $135 per user per month billed annually. HelioScope Basic is $1,620 per license per year. PVsyst 8 Professional is CHF 700 per year. SurgePV Individual is $1,899 per user per year.
Can solar design software replace local approvals in Slovenia?
No. Outputs support design and documentation. They do not replace approval by the responsible engineer, authority, lender or utility. Ask the authority and utility for the documents they require.


