Back to Best Solar Software
Best ListBest-Of List4 tools compared

Best Solar Design Software in Serbia (2026): 4 Tools Compared

4 solar design software tools compared for Serbia on scope, language support and published price. SurgePV publishes this list and is one of the 4. Checked November 2026.

SurgePV publishes this list and sells solar design and proposal software, so we have a commercial interest in this category. This is a desk comparison of what each vendor publishes; we have not run side-by-side tests. Prices and vendor facts checked November 2026. How we evaluate software

Published Last updated
Rainer Neumann

Written by

Rainer Neumann

Editorial contributor · SurgePV

Keyur Rakholiya

Edited by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Serbian installers sizing rooftop PV mostly work to one public grant, so this list reads four tools through that lens: Aurora Solar, HelioScope, PVsyst and SurgePV. The grant text caps subsidised systems at 10.8 kW on-grid and excludes batteries, which narrows what a design tool needs to prove. Prices stay in each vendor’s own currency and are not converted into dinars or euros.

The comparison is a desk read of public vendor pages, checked October 2026, with no side-by-side runs. SurgePV publishes this page and is one of the 4 tools on it. For design and grid-connection questions only, see below; quotes and grant paperwork sit on the Serbia proposal list.

This list is about sizing, diagrams and design files. For quotes and grant paperwork see the Serbia proposal list.

Criteria used for a Serbian job: array layout that can be held under a 10.8 kW cap, shading and yield, a parts list an engineer can sign, Serbian-language output, and a price a small installer can read.

Disclosure and methodology: SurgePV publishes this page and is one of the tools on it, so it has an interest in the result. Vendor facts come from public vendor pages read in October 2026; the grant facts come from the programme sources listed under Sources and Dates.

Want to see SurgePV on your own project?

Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Best-For Picks for Serbia

  • A household roof inside the 10.8 kW grant cap: Aurora Solar. Aurora’s pricing page lists tablet-friendly proposals and integrated financing on all plans, which suits a one-roof home sale.
  • A commercial roof outside the household grant, with P90 values: HelioScope. HelioScope’s pricing page lists rooftop, carport and ground-mount layout on all plans, and P90, P95 and P99 values on Pro.
  • A larger non-household plant where a lender wants a yield report: PVsyst. Its help describes P50 to P90 evaluations. It runs on Windows only.
  • One model for a grid-tied household layout, parts list and proposal: SurgePV. The pricing page lists $1,899, $1,499 or $1,299 per user per year depending on seats.

Comparison Table

Alphabetical order, no ranking. Match the row to the Serbian job type in the picks above.

Tool Best for Price (checked Oct 2026) Free or paid One decisive scope fact
Aurora Solar Residential sales and design Basic $159 per user per month, or $135 billed annually; Premium $259, or $220 billed annually. Aurora pricing Paid Basic and Premium each include 1 user and 50 projects per month
HelioScope Commercial solar-plus-storage Basic $159 per license per month or $1,620 per year; Pro $259 per month or $2,640 per year. HelioScope pricing Paid; vendor lists a free trial Designs up to 1.25 MW DC (Basic), 5 MW (Pro), 30 MW (Enterprise)
PVsyst Yield evidence CHF 700 per year (PVsyst 8 Professional) Paid, one-month trial Documents P50 to P90 evaluations; Windows only
SurgePV Design plus proposals in one subscription Individual $1,899 per user per year (1 user); 3 seats $1,499 per user per year; 5 seats $1,299 per user per year. SurgePV pricing Paid; guided demo, no self-serve trial Roof modeling, layout, shading, yield, financial modeling, BOM, proposals

Language Support for Serbia

Serbian clients and municipal officials read Serbian, yet none of the vendor pages read for this list names Serbian among its languages, and the other tools’ pages do not state their interface or proposal languages. They also do not name a Serbian grid operator, tariff or permit rule, so those come from the municipality and utility. See the solar design workflow and shading analysis pages for SurgePV’s published scope.

Tool Entries

Alphabetical order. Each entry ends with a note on how the tool fits Serbian household-grant work.

Aurora Solar

Best for: a Serbian installer selling grid-tied household systems who wants the sales proposal and financing view in the same tool as the layout.

Not the right choice if: your Serbian jobs are commercial roofs. Aurora’s menu points to HelioScope for that. Note too that Aurora gives P50 values only, so it will not supply a lender-style P90 figure for a non-household plant.

What the vendor documents: 3D roof modeling and trees, performance simulation and automated panel placement. It also lists tablet-friendly proposals and integrated financing. It has an AHJ database of more than 25,000 US jurisdictions. AHJ means the local permit office. Premium adds LIDAR-assisted modeling (laser measuring of the site), bankable shade reports and battery modeling. Enterprise adds unlimited users and a contract manager (the pricing page tooltip says e-signature tools). It also adds APIs (links that let other software connect). Enterprise also adds drone mapping, dealer and team configurations, and advanced user permissions. It adds access to plan sets, engineering stamps and professional services. Aurora’s help centre lists a DXF export, a file other drawing programs can open. It also lists a Single-Line Diagram Editor. A single-line diagram is a simple drawing of how the system is wired. The article says the editor is only available in Europe.

Price (checked October 2026): Basic $159 per user per month billed monthly, or $135 billed annually ($1,620 per year). Premium $259 monthly, or $220 billed annually ($2,640 per year). Enterprise is custom. See Aurora’s pricing page.

Limitations: Plan sets and engineering stamps are listed as add-ons. Basic and Premium each include one user. Per its help article, Aurora gives P50 values only. A P50 value is a yield level expected to be met or exceeded in 50% of years. Aurora does not natively output P90.

Vendor link: aurorasolar.com

Aurora Solar public website page, captured 29 October 2026
Aurora Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

HelioScope

Best for: commercial Serbian roofs, carports or ground mounts with storage, which fall outside the household grant scope. Per its footer, HelioScope is an Aurora Inc. company, but it has its own pricing.

Not the right choice if: most of your Serbian work is household rooftops, since the grant covers grid-tied systems up to 10.8 kW and sales financing matters more there. HelioScope’s site describes commercial software; Aurora’s residential product is the better documented fit.

What the vendor documents: Rooftop, carport, ground-mount and battery layout on all plans. It also lists CAD (computer-aided design) export and single-line diagrams. It lists an 8760 production report (one result for each hour of the year) and shade reports too. The production report also lists a bill of materials with module, wire and inverter quantities (see the help article). Pro adds LIDAR-assisted modeling, storage modeling and financial analysis tools. Pro also adds customizable reports, sales proposals, and P90, P95 and P99 values. Enterprise adds single-axis trackers, designs up to 30 MW DC and export to PVsyst.

Price (checked October 2026): Basic $159 per license per month, or $1,620 per license per year. Pro $259 per month, or $2,640 per year. Enterprise is custom per project. See HelioScope’s pricing page. The standard free trial lasts 14 days, per its help article.

Limitations: Each Basic or Pro license covers one user. Enterprise lists unlimited users. Basic includes 10 projects per month, or 120 on annual billing. Basic designs up to 1.25 MW DC. Financials and sales proposals start at Pro.

Vendor link: helioscope.aurorasolar.com

HelioScope public website page, captured 29 October 2026
HelioScope public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVsyst

Best for: a larger non-household plant in Serbia where a lender or investor asks for a simulation report, since the household grant does not cover such plants.

Not the right choice if: you need a proposal from the same tool (the pages read describe none), a diagram that shows storage, or a Mac. A household grant file needs a plain grid-connected layout, and the requirements page says PVsyst runs only under Windows.

What the vendor documents: a P50 to P90 evaluation. P50 and P90 are yields with a 50% and 90% probability of being exceeded in a year. The languages page says English is the reference language. It lists French among the translations. The documentation itself is not translated. The single line diagram page describes an editor and viewer for PV strings, inverters and transformers. It covers grid-connected systems only, leaves out storage, and calls the feature “still work in progress”. The economic evaluation help page covers feed-in tariffs and self-consumption.

Price (checked October 2026): CHF 700 per year for PVsyst 8 Professional, with grouped-order discounts of 5% for 2 to 4 licences, 15% for 5 to 9 and 20% for 10 or more. The product page offers a one-month free trial.

Limitations: the pages read describe no proposal output. They list the Windows-only requirement and the grid-connected-only diagram editor.

Vendor link: pvsyst.com.

PVsyst public website page, captured 29 October 2026
PVsyst public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV

SurgePV is our product, and we publish this list.

Best for: small Serbian teams that want a roof model, shading, yield, bill of materials and proposal from one grid-tied layout, priced per user. See the solar design workflow, shading analysis and proposal software.

Not the right choice if: you want a self-serve trial, because SurgePV offers a guided demo. Its outputs support design and documentation but do not replace sign-off by the licensed electrical engineer the grant requires, the authority, lender, insurer or utility. Its published scope lists no CRM, monitoring or ERP product. For a free core app, OpenSolar lists one; for AutoCAD-based utility-scale engineering, PVcase lists it on its own site.

What the vendor documents: 3D roof modeling, solar array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation.

Price (checked October 2026): Individual $1,899 per user per year (1 user). 3 seats $1,499 per user per year, or $4,497 a year in total. 5 seats $1,299 per user per year, or $6,495 a year in total. See SurgePV pricing.

Limitations: Results depend on source data, assumptions, equipment models, configuration and review. Pricing and contract terms are confirmed in a written quote. This page uses only SurgePV’s pricing page and product scope summary. They do not state ground-mount coverage or size limits, so those cells read “Not stated”. Ask for them in the demo.

Vendor link: SurgePV and Book a Free Demo

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

The Serbian Household Grant Sets the Design Limits for Rooftop PV

Most small rooftop PV in Serbia is sized around one public programme, so its rules work as a design brief. The Clean Energy and Energy Efficiency for Citizens site is run by the Ministry of Mining and Energy with the World Bank, and municipalities issue the public calls. Its Operations and Grants Manual (April 2025) gives the model public-call text for the solar panel measure. The measure covers solar panels and accompanying installations for electricity generation for own needs, a bidirectional meter for delivered and received electricity, and the technical documentation and contractor reports that the law requires when connecting to the distribution system. It adds that the panel power cannot exceed the approved power of the metering point on the electricity bill, up to a maximum of 10.8 kW. So the array size limit is the lower of those two numbers, and a layout tool needs that as a hard cap before you start placing modules.

The manual also sets conditions on who may do the work. The contractor must employ or hire an electrical engineer licensed under the construction law, who writes the reports on the installed panels. It must give at least five years of warranty on the inverter and ten on the panels. The programme site states that only on-grid systems up to 10.8 kW are subsidised, that hybrid systems with batteries are not covered, and that the household must average at least 80 kWh of electricity a month over the previous 12 months. For a designer that means a battery layout is outside the grant case, and the single line diagram and the bill of materials for the grant case should describe a plain grid-connected string layout with a bidirectional meter.

The solar panels measure is part of the Advanced package in the manual, next to windows, insulation and heat pumps. The manual lists technical documentation items for the other measures, including an energy passport, a technical description and a list of works. A design tool that only draws arrays covers one part of that file. These terms are the model text for municipal calls, and each municipality publishes its own call, so read the call that applies to your client.

None of the four vendor pages we read mentions the 10.8 kW cap, the metering-point limit or the Serbian grant documents. PVsyst suits the yield evidence a lender may ask for on larger non-household plants, which the grant does not cover. For household work, the deciding questions are whether the tool lets you cap array size, and whether the diagram and parts list can be issued to a licensed engineer for sign-off.

What to Ask a Vendor Before Buying

Ask each vendor for a sample Serbian household job and check four things. First, can the array be capped at 10.8 kW and drawn as a plain on-grid layout with a bidirectional meter? Second, is the bill of materials one a licensed engineer can sign off on? Third, does the proposal come out in Serbian? Fourth, is the price in the currency you will be invoiced in? Where a vendor does not publish a feature, this page says so, and a demo or trial is where to settle it.

See SurgePV on your own project

Book a guided demo and bring a roof, the equipment and the files you must deliver.

Book a Free Demo

Live project walkthrough · No credit card required

How We Ordered These Tools

The tools are listed alphabetically with no score. The picks follow what each vendor documents and the grant rules above, not any run of the software.

  • Roof and array design. A Serbian household layout has to be held to 10.8 kW. Not assessed: layout speed or roof-model accuracy.
  • Shading and energy yield. Yield feeds savings figures in the offer. Not assessed: how closely any tool matches measured output.
  • Financial modeling and proposals. A homeowner reads the proposal, not the design file. Not assessed: proposal quality or close rates.
  • Electrical and bill-of-materials outputs. The engineer who signs the grant reports needs a diagram and parts list. Not assessed: whether any output passes review.
  • Language support. Serbian clients read Serbian. Not assessed: translation quality.
  • Published price. A small installer needs a number before a demo. Not assessed: discounts or total cost of ownership.

Go Deeper on a Category

Sources and Dates

Serbian programme sources, read in November 2026: the Operations and Grants Manual (April 2025) and the programme overview page.

Vendor pages were read in October 2026. Tool facts come from each vendor’s own public pages, linked here by tool. Aurora Solar (DXF export, Single-Line Diagram Editor, Aurora’s pricing page, help article). HelioScope (HelioScope’s site, help article, HelioScope’s pricing page, help article). PVsyst (requirements page, P50 to P90 evaluation, languages page, single line diagram page, economic evaluation help page, CHF 700 per year for PVsyst 8 Professional, product page, pvsyst.com). SurgePV (SurgePV pricing).

Frequently Asked Questions

What is the best solar design software in Serbia?

HelioScope lists commercial rooftop, carport and ground-mount design with storage. Aurora Solar for residential sales with financing; PVsyst for yield evidence; SurgePV for design, financial modeling and proposals in one product. None of the vendor pages read names a Serbia utility, tariff or permit rule, so test each tool on a sample Serbia project.

Is there free solar design software for Serbia?

None of the tools here is free. PVsyst offers a one-month trial. SurgePV offers a guided demo.

Which solar design software works in the local language in Serbia?

None of the vendors on this list names Serbian on the pages read. The other tools here do not state their languages on the pages read, so ask each vendor to show your language in a demo or trial.

How much does solar design software cost for Serbia teams?

Published prices differ in currency and unit, so they are not converted. Aurora Basic is $135 per user per month billed annually. HelioScope Basic is $1,620 per license per year. PVsyst 8 Professional is CHF 700 per year. SurgePV Individual is $1,899 per user per year.

Can solar design software replace local approvals in Serbia?

No. Outputs support design and documentation. They do not replace approval by the responsible engineer, authority, lender or utility. Ask the authority and utility for the documents they require.

What size limit applies to subsidised rooftop PV in Serbia?

The Operations and Grants Manual model call says panel power cannot exceed the approved power of the metering point on the electricity bill, up to a maximum of 10.8 kW. The programme site says only on-grid systems up to 10.8 kW are subsidised and hybrid systems with batteries are not covered.

Who must sign off the PV installation in the Serbian household grant?

The manual says the contractor must have an electrical engineer, employed or hired, who holds a licence under the construction law and writes the reports on the installed panels. It also requires at least five years of warranty on the inverter and ten years on the panels.

About the Contributors

Author
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Editor
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Ready to Design and Propose Faster?

SurgePV covers solar design, energy-yield modeling, financial modeling, and proposals in one platform. Book a guided demo to see it on a project like yours.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.