
Quick answer
For most installers and EPCs, an all-in-one platform is simpler than a stack of point tools, because design, shading, yield, financial modeling and proposals share one project file. Point tools win on depth, such as PVsyst for simulation or Scanifly for drone surveys. List prices for the suites compared here run from $1,299 to $2,640 per user per year. Checked November 2026.
Weighing one platform against a stack of tools?
Bring a live project to a SurgePV demo and see design, shading, yield, financial modeling and proposals from one project file.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
SurgePV publishes this page and is a vendor of an all-in-one platform, so it has an interest in that side of the argument. The tools named come from their vendors’ public pages, checked November 2026. The page does not quote time-saving percentages, because none is published by a primary source; it gives you a way to measure your own.
What is the difference between all-in-one solar software and point tools?
An all-in-one platform covers several pre-construction steps in one product; a point tool does one job in depth. The real difference is whether project data moves between steps by itself or by hand.
| Approach | Examples (vendor wording) | What the vendor page lists |
|---|---|---|
| All-in-one | Aurora Solar | Design Mode, Sales Mode, Contract Manager, Instant Plan Sets |
| All-in-one | SurgePV | 3D roof modeling, array layout, shading, yield, financial modeling, electrical workflow support, BOM output, proposals |
| All-in-one | OpenSolar | Menus list design, sell and manage features; homepage says free of charge |
| All-in-one | Enact Solar | Design, proposals, engineering and asset management modules |
| Point tool | PVsyst | Yield simulation; PVsyst 8 Professional CHF 700 per year |
| Point tool | Scanifly | Remote and drone-based design and surveys; no price published |
| Point tool | Energy Toolbase | Financial analysis, controls and monitoring for solar and storage; no price published |
| Point tool | Sunbase | CRM, estimating and proposals for contractors; plans start at $59 per user per month |
Sources: vendor homepages and pricing pages, read November 2026.







Not every tool fits cleanly. AutoCAD, often used for electrical drawings, is a general CAD product from Autodesk; no homepage capture is available for it here.
How do all-in-one and point-tool costs compare?
Compare the number of subscriptions, then the published prices. A point-tool stack means several licences, renewal dates and vendors; most of the point tools above do not publish a price (Scanifly and Energy Toolbase), so a stack total cannot be sourced.
- Sunbase, starting plan$708 x 12, contractor platform
- SurgePV, 5 seats$1,299 per user
- SurgePV, 3 seats$1,499 per user
- Aurora Solar Basic$1,620 $135 per month, annual billing
- SurgePV, 1 user$1,899
- Aurora Solar Premium$2,640 $220 per month, annual billing
Source: Aurora Solar, SurgePV and Sunbase pricing pages (Sunbase starting price shown as $59 x 12; billing period not stated), checked November 2026.
PVsyst 8 Professional is CHF 700 per year, in Swiss francs, so it is not on the chart. OpenSolar is listed as free of charge on its homepage. Aurora’s Basic plan is $159 per user per month if billed monthly.
Where does project time go in a multi-tool workflow?
Time goes to handoffs: exporting, importing, retyping system size and re-checking numbers. This page does not publish a time saving, since no primary source measures one for solar. You can measure it yourself.
- Pick one typical project and time it end to end in your current stack.
- List each place a number is typed twice (system size, production, losses, price).
- Run the same project in an all-in-one trial and compare time and mismatches.
Time your own project
In a SurgePV demo, bring one real project and note where you would normally retype data.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Where do point tools still win?
Point tools win where one task needs more depth than a suite offers. Three common cases:
- Simulation and reports: PVsyst is built around yield simulation; see the PVsyst review and PVsyst vs SurgePV.
- Site data: Scanifly’s page describes drone-based surveys and design; see satellite vs drone survey.
- Tariff and storage economics: Energy Toolbase’s page describes storage and tariff modeling; see Energy Toolbase vs SurgePV.
An all-in-one platform concentrates vendor risk: a price change or outage affects the whole workflow. Before committing, ask about data export, contract terms and uptime commitments in writing.
Who should pick which?
- Residential and small commercial installers: start with an all-in-one tool and add a point tool only for a gap you can name.
- Teams delivering financed or utility-scale projects: keep the simulation tool your lender names, and see the best bankable simulation list.
- Storage-heavy commercial teams: add a tariff and storage modeling tool to your design platform.
- Teams that sell through a pipeline: pair design software with a CRM; see the best solar CRM list.
- Hybrid: one all-in-one core plus one or two specialist tools is a common pattern; check each integration in writing.
SurgePV’s scope is described above; its outputs support design work and do not replace approval by the responsible engineer, authority, lender or utility. See all-in-one design software for more options.
Bottom line
If your projects are mostly rooftop, consolidating design, shading, yield, financials and proposals usually reduces handoffs. If one task needs specialist depth, keep that tool. Book a SurgePV demo or see SurgePV pricing to test the all-in-one route on your own project.
Sources
- Aurora Solar homepage and pricing page: scope and prices. Checked November 2026.
- PVsyst shop: CHF 700 per year, Professional. Checked November 2026.
- Scanifly homepage: design and drone survey scope, no price. Checked November 2026.
- Energy Toolbase homepage: scope, no price. Checked November 2026.
- Sunbase homepage: scope, starting price. Checked November 2026.
- OpenSolar homepage: free of charge, feature menus. Checked November 2026.
- Enact Solar homepage: modules. Checked November 2026.
Frequently asked questions
Is all-in-one solar software better than point tools?
For most rooftop installers an all-in-one platform is simpler, because design, shading, yield, financials and proposals share one project file. Point tools win where you need depth, such as PVsyst simulation or Scanifly drone surveys (vendor pages, checked November 2026).
Is all-in-one solar software cheaper than a stack of point tools?
It usually means fewer subscriptions, but a stack total cannot be sourced because tools such as Scanifly and Energy Toolbase do not publish prices. Suites compared here list $1,299 to $2,640 per user per year (checked November 2026).
When should I keep a point tool?
Keep one when a task needs more depth than a suite offers: lender-specified yield simulation, drone-based site capture, or tariff and storage modeling. Name the gap first, then pick the tool (checked November 2026).
How much time does an all-in-one platform save?
No primary source publishes a solar-specific figure, so measure it yourself. Time one project in your current stack and in a trial, and count the places data is typed twice.
What does an all-in-one solar platform include?
It varies by vendor. SurgePV lists 3D roof modeling, array layout, shading, yield, financial modeling, electrical workflow support, BOM output and proposals; Aurora lists design, sales, contracts and plan sets (vendor pages, November 2026).
What is the risk of using one platform for everything?
Vendor concentration: a price change or outage affects your whole workflow. Ask about data export, contract terms and uptime in writing before you commit, and keep a specialist tool for any critical niche task.

