Back to Blog
solar software7 min read

Solar Proposal Software and Sales: 3 Ways It Helps

How solar proposal software helps close more jobs: faster proposals, clear savings and steady follow-up, plus how to measure your own results.

Nirav Dhanani

Written by

Nirav Dhanani

Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

Published ·Updated

Answer

Solar proposal software supports sales in three ways: a faster proposal, a clear savings picture and easier follow-up. It builds the proposal from your design, so the numbers match. It does not change your price or lead quality. This guide gives no close-rate gain because none could be checked, so measure your own.

Last updated: November 2026

A solar proposal is the document that turns a site visit into a decision. Proposal software helps with that in three ways: speed, a clear savings picture and steady follow-up. It builds the proposal from your design, so the layout, yield and price match.

SurgePV publishes this guide and sells proposal software. This page explains the ideas and shows how to check your own results. It does not claim a percentage gain.

See a design turn into a proposal

Bring a recent project to a guided demo and watch the layout, yield and savings flow into a branded SurgePV proposal.

Book a Demo

Checking cost first? See the SurgePV pricing page

The three levers

1. Speed

A buyer who has your proposal the same week has less time to talk to other installers. That is simple logic, not a measured result. You can test it on your own jobs by tracking the days from site visit to proposal.

Software saves time because the proposal is built from the design. You do not retype the layout, the yield or the price into a separate file. The US Department of Energy counts the cost of finding new customers as a soft cost, one of the non-hardware costs of going solar (DOE, Solar Soft Costs Basics). The hours you spend building each proposal are part of your own cost of winning a customer, so they are worth measuring.

2. A clear savings picture

Buyers want three answers. How much will I save? When does the system pay for itself? What do I pay if I use a loan?

A good proposal answers these on the first page, in plain words, with figures from the buyer’s own power bill. Show the assumptions next to the numbers. See our glossary entries on financial modeling and proposal generation.

3. Steady follow-up

Many buyers need more than one contact before they decide. Plan your follow-up before you send the proposal. Decide who calls, when, and what you will say. Our guides on follow-up email sequences and solar sales objections can help.

Lever What the software does What to track on your own jobs
Speed Builds the document from the design, with no retyping Days from site visit to proposal
Clear savings Shows savings, payback and financing from one model Whether buyers ask fewer questions about the numbers
Follow-up Can record what was sent, if the tool supports it Contacts made before each decision

Key Takeaway

Each lever is something you can measure on your own jobs. None of them has a published close-rate figure you can borrow, so set your baseline before you change your process.

What a buyer needs to see

Put these items in every proposal:

  • A picture of the buyer’s own roof with the proposed layout.
  • The expected yearly yield in kilowatt-hours (kWh).
  • Estimated savings, with the power price you assumed.
  • The payback time, with the way you worked it out.
  • The price and the payment options, such as cash or loan.
  • What the price covers and what it does not.
  • The date of the proposal and how long the price holds.

Show savings as estimates. A model gives an estimate, not a promise. The free PVWatts calculator is a quick way to sanity-check the yield figure in any proposal. Our guides on solar proposal examples and proposal presentation tips show layouts you can copy.

How to check proposal software

Use this list in a demo.

  1. One source of numbers. Change the layout. Does the proposal update without retyping?
  2. Clear financing. Can you show cash, loan and other options side by side?
  3. Your brand. Can you set your logo, colors and templates?
  4. Reading on a phone. Open a sample proposal on your own phone.
  5. Sharing. Can the buyer send the proposal to a partner or family member?
  6. Language. Does it support the language of your buyers?
  7. Review step. Can you check the figures before the buyer sees them?

For more, read common solar proposal software mistakes to avoid.

What SurgePV proposals include

SurgePV’s public product scope includes proposal generation. The solar proposals page lists the options below. Confirm each one in a demo before you rely on it.

  • Branded templates, where you control logo, colors and layout.
  • Language options, including Spanish.
  • Supporting documents that you upload into the proposal.
  • Web links that open on any device.
  • 2D and 3D views of the system on the buyer’s roof.
  • A before-and-after comparison of energy costs.
  • Financing options such as custom loans, PPAs and leases.
  • Incentive management, where you review eligibility, dates and tariff assumptions before you include them.

The page also says to check the figures and documents before you share a quote. Outputs support your design and documentation work. They do not replace approval by the responsible engineer, authority, lender, insurer or utility.

Proposals come from the same project as the design. The solar designing page and the generation and financial tool page describe the earlier steps.

Measure your own gain

Your close rate is the number of signed jobs divided by the number of proposals sent, over the same period. Here is an example with made-up numbers. Use your own.

  • You send 40 proposals in a month.
  • You sign 8 jobs. The close rate is 8 ÷ 40 = 20%.
  • After a change, you sign 10 jobs from 40 proposals. The close rate is 10 ÷ 40 = 25%.
  • The change added 2 jobs a month.

This example is not data from SurgePV or any customer. Track at least three months of your own numbers before you judge a change. Also track the days from site visit to proposal.

Close rate before and after a process change (illustrative example, not market data) (% of proposals signed)
  • Before: 8 of 40 proposals20%
  • After: 10 of 40 proposals25%

Source: made-up worked example in this guide, not SurgePV or customer data. Illustrative example, not market data, checked November 2026.

Pro Tip

Log each proposal on the day you send it, with the lead source and price. When you compare before and after, count only proposals that already have an outcome, and note any change in price or season.

Check your close-rate math on real proposals

Bring your last ten proposals to a guided demo and see how SurgePV builds the same documents from one project.

Book a Demo

Not ready for a call? Read the SurgePV pricing page first

Mistakes to avoid

  • Hiding the savings on page six.
  • Showing only one payment option.
  • Leaving out the assumptions behind the savings.
  • Sending the proposal days after the visit with no follow-up plan.
  • Presenting modeled savings as a promise.

Next Step

To see proposals built from the same project as the design, book a SurgePV demo. SurgePV is priced per user per year. It costs USD 1,899 for one seat, USD 1,499 per user with 3 seats and USD 1,299 per user with 5 seats (pricing). Confirm taxes and contract terms in a written quote.

For more on proposal strategy, see the Solar Proposals hub. To model the savings behind a proposal, read about the generation and financial tool and the free System Advisor Model from the National Laboratory of the Rockies.

Frequently Asked Questions

How does solar proposal software increase close rates?

It helps in three ways. It makes the proposal faster, because the document comes from the design. It makes the savings clear, because figures come from the same model. It makes follow-up easier to plan. It does not change your price or the quality of your leads, and the size of any gain depends on your team.

What is a good close rate for solar sales?

This guide does not give a benchmark, because we found no public figure we could check. Work out your own close rate: signed jobs divided by proposals sent, over the same period. Track it for a few months before and after you change your proposal process.

How fast should a solar proposal be?

As soon as the design is reviewed and the numbers are checked. Speed matters because a buyer who waits may talk to other installers. Track the days between the site visit and the proposal, and try to shorten that gap without skipping the checks.

How do you calculate close rate for solar proposals?

Divide signed jobs by proposals sent over the same period. For example, 8 signed jobs from 40 proposals is a 20% close rate. Track at least three months of your own numbers before you judge any change.

How much does SurgePV proposal software cost?

SurgePV’s pricing page lists USD 1,899 per user per year for one seat, USD 1,499 per user for 3 seats and USD 1,299 per user for 5 seats. Access is through a guided demo. Confirm taxes and contract terms in a written quote.

What should a solar proposal include?

Show the roof layout, the expected yearly yield, the savings, the price and the payment options. List your assumptions and what the price does not cover. Show modeled savings as estimates, not as promises.

Where this fits

This article is part of SurgePV's Solar Design hub, which works through the topic from first principles to the decisions a project team actually has to make.

About the Contributors

Author
Nirav Dhanani
Nirav Dhanani

Co-Founder · SurgePV

Nirav Dhanani is identified by SurgePV as a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, conversion results, and market-expansion claims are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Get Solar Design Tips in Your Inbox

Join 2,000+ solar professionals. One email per week - no spam.

No spam · Unsubscribe anytime

Book Free Demo

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.