Quick answer
Free solar design software such as OpenSolar and SAM can cover design, sales or engineering analysis at no licence fee, while paid tools list $1,300 to $2,640 per user per year. The deciding factor is the output you are missing, not the price label. Checked 4 November 2026.
Weighing a free tool against a paid design platform?
Bring one real project to a SurgePV demo and see whether the outputs you need are covered before you pay for anything.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
SurgePV publishes this page and is a vendor in this category. SurgePV is not one of the free tools compared here, but it is the paid example. The facts here come from the vendors’ public pages, checked November 2026. Last checked: 4 November 2026.
How much does free vs paid solar design software cost?
Free tools have no licence fee, and paid tools list $1,300 to $2,640 per user per year. A licence price does not show whether the tool produces the layout, simulation, electrical documentation or proposal your team needs.
- OpenSolar$0 free of charge per vendor
- SAM$0 free desktop application
- SurgePV (5 seats)$1,299 per user
- SurgePV (3 seats)$1,499 per user
- Aurora Solar Basic$1,620 $135 per month, billed annually
- SurgePV (1 user)$1,899
- Aurora Solar Premium$2,640 $220 per month, billed annually
Source: OpenSolar, SAM, Aurora Solar and SurgePV pricing pages, checked November 2026.
Aurora’s monthly-billed prices are higher ($159 Basic and $259 Premium per user per month). SurgePV’s prices exclude 18% GST. Neither figure includes onboarding, imagery or third-party services.
Free vs paid: what each option covers
An energy calculator, an engineering model and an installer design platform are different products even when none has a licence fee. Use this map to separate each tool’s documented role from the work that surrounds it.
| Product | Published access model | Documented role | Question to ask |
|---|---|---|---|
| OpenSolar | Free of charge, per its homepage | Design, sales and project management | Which services and templates apply to our market? |
| SAM | Free desktop application | Techno-economic analysis, from residential rooftop to utility-scale PV | Who will build and review the detailed model? |
| PVWatts | Free estimator | Preliminary production estimate | Are our site and loss assumptions defensible? |
| Aurora Solar | Paid: $135 or $220 per user per month, billed annually | Design and sales platform | Which plan includes the outputs we need? |
| SurgePV | Paid: $1,899 per user per year (1 user) | 3D roof modeling, array layout, shading, yield, financial modeling, BOM, proposals | Is the guided demo scope enough for our projects? |
This is a scope map from vendor pages, not a ranking or feature score.




Can free software make single-line diagrams?
Yes. OpenSolar’s single-line diagram page describes an integrated, editable generator with regional templates for Australia, the United States, the United Kingdom, Germany, Italy and Spain. A separate AutoCAD licence is therefore not a universal prerequisite for an OpenSolar diagram. See the glossary entry on the electrical single-line diagram for what a reviewer expects to see.
OpenSolar also lists permitting integrations. Integrated access to a service is not the same as that service being included at no charge. Confirm plan-set, engineering-review and application scope before estimating document cost.
What is the complete cost of a solar design workflow?
The complete cost is the licence plus optional imagery, third-party document services, onboarding, integration, migration and staff time. List each item once. If a CAD licence already serves the whole business, do not assign its full annual cost to one solar tool.
For labor, separate measured active time from waiting on a response or approval. Use the same project, inputs and required outputs for each workflow, and record rework as well as the first draft.
Illustrative labor example
The following is hypothetical, not a SurgePV test, vendor quote or claimed customer saving. Assume 12 comparable projects per month, 0.5 hours saved per project, and time valued at $60 per hour.
| Input or result | Value | Basis |
|---|---|---|
| Comparable projects | 12 per month | Assumption |
| Active time difference | 0.5 hours per project | Assumption; replace with measured time |
| Internal labor value | $60 per hour | Assumption, not an industry wage |
| Time difference | 6 hours per month | Projects times hours |
| Labor-value difference | $360 per month, $4,320 per year | Hours times labor value |
The result excludes subscription changes, training and migration, and it is not a cash saving. Freed capacity may still be valuable even when payroll is unchanged.
Want your own numbers instead of an example?
Run your representative project through SurgePV in a guided session and compare the outputs with your current free workflow.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
How do you test free and paid tools on one project?
Run the same representative project through each candidate. A clean demonstration roof cannot show suitability for obstruction-heavy commercial sites or mixed equipment.
- Fix the equipment, survey inputs, tariff assumptions and required outputs.
- Run your current workflow and record active work, handoffs and corrections.
- Run the candidate workflow with the same information.
- Review layout, loss assumptions, diagrams, proposal and export files.
- Ask the responsible engineer to name missing checks.
- Match written commercial terms to the features demonstrated.
For team use, also test account permissions, revision history and how a second designer continues a project.
Does project size force you onto paid software?
No vendor on this page publishes a capacity cutoff that moves you from free to paid. SAM describes PV systems from small residential rooftop to large utility-scale, though it is an analysis tool rather than an installer proposal platform. Ask each vendor to demonstrate your intended capacity, array geometry and export needs, and record any limit not published as unverified.
Who should pick which?
- Pick a free tool if it already produces every output you need at an acceptable review burden, for example OpenSolar for design and sales or SAM for engineering analysis.
- Pick a paid platform if a verified gap exists, such as an output, support arrangement or integration your free stack lacks.
- Pick both if a free analysis tool sits beside a paid design platform; that is a sensible setup for some teams.
Pros and cons at a glance:
| Free tools | Paid tools | |
|---|---|---|
| Pros | No licence fee; documented design, sales or analysis scope | Contracted scope and support; single workflow in one product |
| Cons | Services around them (permits, plan sets) can cost extra; you assemble the stack | Per-user cost, for example $1,620 to $2,640 per user per year for Aurora Solar |
Bottom line
Keep a free workflow if it produces the required outputs. Move to paid when a verified gap justifies the added cost. To evaluate SurgePV, bring that same project to a design-workflow demonstration, review the documented design scope, and read the pricing page. For side-by-side detail see the OpenSolar review, SAM review, OpenSolar vs SurgePV and the free solar design software list.
Sources
- OpenSolar homepage: free of charge wording and tool list, checked November 2026.
- OpenSolar single-line diagrams: regional templates, checked October 2026.
- SAM: free desktop application and PV scope, checked November 2026.
- Aurora Solar pricing: Basic and Premium prices, checked November 2026.
- SurgePV pricing: per-user annual prices and GST note, checked November 2026.
Frequently Asked Questions
Is there free solar design software for professional installers?
Yes. OpenSolar’s homepage says its software is free of charge for solar professionals and lists design, sales and project management tools. SAM, from the US National Laboratory of the Rockies, describes itself as a free desktop application for techno-economic analysis. Both were checked in November 2026; neither replaces your own review of outputs.
How much does paid solar design software cost?
Published list prices start around $1,300 per user per year. Aurora Solar lists Basic at $135 per user per month billed annually ($1,620 per year) and Premium at $220 ($2,640 per year). SurgePV lists $1,899 per user per year for one user, $1,499 for three users and $1,299 for five, plus 18% GST, per its pricing page checked November 2026.
Are permits free if the design platform is free?
Not necessarily. OpenSolar lists permitting integrations, but access to a service is not the same as that service being free of charge. Ask the provider which plan-set, engineering review and application services are included before you budget.
Can free solar software generate single-line diagrams?
Yes, in at least one case. OpenSolar’s single-line diagram page describes an editable generator with templates for Australia, the United States, the United Kingdom, Germany, Italy and Spain. The diagram still needs review by the responsible engineer and the authority.
When should a solar team move from free to paid software?
Move when a specific output or support arrangement your current tools cannot provide justifies the added cost. Compare the missing output against the licence price and your staff time. Team-size thresholds and payback periods are not published by any vendor on this page.
Is SurgePV free?
No. SurgePV is a paid subscription, and access is through a guided demo rather than a self-serve trial, per its public pages checked November 2026. Prices are $1,899, $1,499 or $1,299 per user per year depending on seats.