Comparison2026
R
RatedPower
VS
E
Energy Toolbase

RatedPower vs Energy Toolbase: Design vs Rate Data

RatedPower designs utility-scale plants; Energy Toolbase models utility rates and storage. Scope, published pricing and limits compared, checked October 2026.

Keyur Rakholiya

Written by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

RatedPower vs Energy Toolbase: Design vs Rate Data: comparison cover

Quick answer

RatedPower designs utility-scale solar and storage plants. Energy Toolbase models utility rates, battery dispatch and proposals for commercial projects. They do different jobs, so choose by task: plant layout and yield, or tariff and storage economics. Neither vendor publishes a price for its main software. Vendor pages checked October 2026.

SurgePV publishes this page and is a vendor in this category. SurgePV is not one of the two products compared here. The facts below come from the vendors’ public pages, checked October 2026. Last checked: 28 October 2026.

Comparing RatedPower and Energy Toolbase?

If your work is rooftop design and proposals rather than plant layout or rate modeling, see SurgePV on your own project.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

RatedPower vs Energy Toolbase: what is the main difference?

RatedPower is design software for utility-scale solar and storage plants. Energy Toolbase (ETB) is modeling software for solar and storage economics. One answers “how should the plant be laid out”, the other answers “what will this battery save against this tariff”.

Topic RatedPower Energy Toolbase
Main job Layout, yield, electrical design and documents for utility-scale plants Utility rates, storage simulation and proposals (ETB Developer)
Panel layout Yes, automated, with .dwg export and re-import The vendor’s own table marks in-app PV panel layout tools with a cross for ETB Developer
Rates and tariffs Not listed “120,000+ verified rates” on the ETB Developer page
Storage Standalone and solar-plus-storage design, arbitrage dispatch Storage simulation, demand response, plus ETB Controller for battery control
Pricing Talk to sales on every plan; one subscription per company ETB Developer: no published price; ETB Controller and Monitor show “As low as” figures
Vendor says it is not for Commercial, industrial or residential rooftop work In-app PV layout; residential storage modeling is marked with a cross

Sources: RatedPower pricing, ETB Developer, checked October 2026.

What does RatedPower do?

RatedPower, part of Enverus, covers four steps on its platform page: find and screen sites, design the plant and its economics, fine-tune the layout, and produce documents. You set limits such as ground coverage ratio, tilt, row pitch and DC/AC ratio, and the tool builds the layout.

  • Yield. A simplified mode reconciles with PVsyst. A 3D mode traces light module by module and takes 10 to 20 minutes per run, per the 3D energy page.
  • Electrical. String sizing, inverter and transformer choice, medium-voltage routing and single line diagrams up to the connection point.
  • Storage. Standalone batteries and DC or AC coupled solar-plus-storage. The vendor says peak shaving, ancillary services and merchant cases are not automated (storage page).
  • Documents. The proposal page lists reports in .pdf and .docx, bills of quantities and .dwg drawings.
RatedPower public website page, captured 29 October 2026
RatedPower public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Limits the vendor states. Its software guide says that for commercial, industrial or residential rooftop work, other tools serve you better. It also says most customers keep PVsyst for the P50, P90 and P99 report that lenders ask for.

What does Energy Toolbase do?

Energy Toolbase sells ETB Developer (modeling and proposals), ETB Controller (battery control), ETB Monitor and ETB Consulting. Its ETB Developer page lists a utility rate database, time-of-use and net metering modeling, storage simulation, demand response modeling, unlimited proposals and lender quotes.

  • Rates. The page says “120,000+ verified rates”. Its FAQ says “more than 110,000”, so ask which count is current.
  • Storage. The ETB Developer FAQ says the software can analyze standalone storage, solar plus storage and grid services, and model demand charge reduction by simulating battery dispatch.
  • Control. The ETB Controller page describes an energy management system that regenerates dispatch forecasts every 15 minutes and is hardware-agnostic.
  • Finance. Cash, power purchase agreement, loan and lease structures are listed.
Energy Toolbase public website page, captured 29 October 2026
Energy Toolbase public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Limits the vendor states. The comparison table on the ETB Developer page marks “In-app PV panel layout tools” and “Residential storage modeling” with a cross. ETB says it works with partner design tools instead.

How much do RatedPower and Energy Toolbase cost?

Neither vendor publishes a price for its core design or modeling software. Prices below are as the vendors show them, checked October 2026.

Item RatedPower Energy Toolbase
Core software Basic, Advanced, Enterprise: all “Talk to sales” ETB Developer: “Request Pricing”, 30-minute call
Billing basis One subscription per company, unlimited users and projects Not stated for ETB Developer
Add-ons 3D energy yield packages; Power Analyst AI agent ETB Controller “As low as $34,000” and “As low as $12,400”; ETB Monitor “As low as $4,700” (currency not named)
Contract Usually multi-year; annual terms available Not stated
Trial Live demo and free product tour Book a demo call; trial terms not stated

Need design and proposals for rooftops?

Neither tool here is built around rooftop proposals. Book a guided demo to see SurgePV roof modeling, layout, shading, yield, financial modeling and proposals on one of your own projects.

Book a Free Demo

Guided demo. SurgePV does not advertise a self-serve trial. No credit card is needed for the demo.

Energy Toolbase listed starting prices ($ as listed, currency not named, billing basis not stated)
  • ETB Controller (higher)$34,000
  • ETB Controller (lower)$12,400
  • ETB Monitor$4,700

Source: Energy Toolbase pricing page, checked November 2026.

RatedPower publishes no price on any plan, and ETB Developer is quoted on a call, so neither core product appears in the chart.

Pros and cons

RatedPower

  • Pro: one run gives layout, electrical design, 3D yield, cost model and documents, per the vendor.
  • Pro: per-company pricing with unlimited users.
  • Con: no list prices; contracts usually multi-year.
  • Con: the vendor says rooftop work is better served elsewhere.

Energy Toolbase

  • Pro: a large rate database and storage simulation inside proposals.
  • Pro: one vendor for modeling, control and monitoring.
  • Con: no in-app panel layout, per the vendor’s own table.
  • Con: ETB Developer has no published price; site counts for ETB Controller differ between pages (200+, more than 120, over 150).

Who should pick which?

  • Pick RatedPower if you develop or engineer utility-scale solar or storage plants and screen many sites.
  • Pick Energy Toolbase if battery dispatch and demand charges drive the returns of commercial projects and you already have a design tool.
  • Use both only if you do utility-scale design and also quote commercial storage. The pages read do not describe a direct integration between them.
  • Look at SurgePV if the job is roof modeling, array layout, shading, yield, financial modeling, electrical workflow support, bill-of-materials output and proposals. Its published scope does not list a utility rate database or battery dispatch modeling, and it does not list utility-scale plant layout.

Where does SurgePV fit?

SurgePV is solar design and proposal software priced in USD per user per year: $1,899 for one user, $1,499 per user for 3 seats and $1,299 per user for 5 seats, on the SurgePV pricing page. Access is by guided demo. Results depend on source data, assumptions and review, and do not replace approval by the responsible engineer, authority, lender, insurer or utility.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Bottom line

Choose RatedPower for plant-scale layout and yield, and Energy Toolbase for tariff and storage economics. If your daily work is rooftop design and proposals, neither is the closest fit; book a SurgePV demo or check the pricing first.

Sources

All vendor pages were read on 28 October 2026. SurgePV facts come from its pricing page, checked November 2026.

Frequently asked questions

Is RatedPower better than Energy Toolbase?

Neither is better overall, because they do different jobs. RatedPower designs utility-scale solar and storage plants, while Energy Toolbase models utility rates, storage and proposals. Pick by task, per vendor pages checked October 2026.

Does Energy Toolbase do solar design?

ETB Developer does not lay out panels in the app. The vendor’s own comparison table marks in-app PV panel layout tools with a cross and lists design software partnerships instead (ETB Developer page, checked October 2026).

Can RatedPower model utility rate economics?

The RatedPower pages read do not list a utility rate database or tariff modeling. They list layout, 3D yield, electrical design, a cost model with LCOE and documents for utility-scale plants (checked October 2026).

How much do RatedPower and Energy Toolbase cost?

Neither publishes a price for its core software. RatedPower plans are all Talk to sales. ETB Developer asks you to book a 30-minute call, while ETB Controller shows “As low as $34,000” and “As low as $12,400” with no currency named (checked October 2026).

Which is better for commercial solar plus storage?

Energy Toolbase is the closer fit for commercial storage economics, because it lists rate modeling, demand charge simulation and ETB Controller. RatedPower’s own guide says rooftop commercial and industrial work is better served by other tools (checked October 2026).

Is there a tool that covers rooftop design and proposals instead?

SurgePV lists 3D roof modeling, array layout, shading, yield, financial modeling, electrical workflow support, bill-of-materials output and proposals. Prices are $1,899 per user per year for 1 user, $1,499 for 3 seats and $1,299 for 5 seats (SurgePV pricing, November 2026).

About the Contributors

Author
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Ready to See the Difference?

Start a free trial and experience why solar teams are switching to SurgePV.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.