PVsyst vs RatedPower 2026: Yield vs Automation

PVsyst vs RatedPower 2026: CHF 700 per year yield simulation against RatedPower's utility-scale design platform with no published price. See which fits.

Keyur Rakholiya

Written by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

PVsyst vs RatedPower 2026: Yield vs Automation: comparison cover

Quick answer

PVsyst is a Windows yield simulation program priced at CHF 700 per year for PVsyst 8 Professional. RatedPower is cloud software that generates utility-scale layouts, electrical design, yield, costs and documents, with no published price. The deciding factor is simulation depth against design automation. RatedPower's own guide says most customers keep PVsyst for lender reports. Checked November 2026.

Comparing PVsyst with RatedPower?

If your work includes rooftop and commercial projects, see a design and proposal tool alongside both.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

SurgePV publishes this page and is a vendor in this category. SurgePV is not one of the two products compared here. The facts come from the vendors’ public pages, checked October and November 2026.

PVsyst vs RatedPower: Scope, Price and Limits

PVsyst studies a system you define, and RatedPower generates the design for you. The table uses each vendor’s own wording.

PVsyst RatedPower
What it is “A PC software package for the study, sizing and data analysis of complete PV systems” Cloud software for utility-scale solar and storage design (part of Enverus)
Core output Hourly simulation, loss diagram, engineer report Layout, electrical design, 3D yield, cost model, more than 400 editable documents
Shading 3D near shading, horizon, electrical shading losses 3D ray-traced yield mode, 10 to 20 minutes per run
P50 and P90 P50/P90 tool in the help Vendor says most customers keep PVsyst for the lender P50, P90 and P99 report
Storage Storage and self-consumption models Standalone and DC or AC-coupled solar plus storage
Price PVsyst 8 Professional CHF 700 per year, one license per computer Not published; one subscription per company
Users One license per computer Unlimited users and projects on every plan
Platform Windows only Cloud
Trial One-month free trial with generic components and watermarks Live demo and free product tour; no free trial found

Sources: PVsyst shop, PVsyst 8 product page, RatedPower pricing, RatedPower platform. Checked November 2026.

PVsyst license list prices (RatedPower publishes none) (CHF per year, as listed on the vendor shop)
  • PVsyst 8 ProfessionalCHF 700
  • PVsyst EducationCHF 420
  • PVsyst Training / ResearchCHF 560
  • PVsystCLICHF 3,000

Source: PVsyst shop, checked October 2026.

What Does PVsyst Do?

PVsyst covers grid-connected, stand-alone, pumping and DC-grid systems. It builds a 3D shade scene, calculates electrical shading losses, models bifacial modules and trackers, and runs P50 and P90 evaluations. It works from the equipment and layout you enter.

Limits from the vendor: Windows only, one license per computer, and Module Layout shading shows a warning above 1 MWp and an error above 5 MWp. No proposal feature was found on the pages read. See the PVsyst review.

PVsyst public website page, captured 29 October 2026
PVsyst public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

What Does RatedPower Do?

RatedPower takes a site to a layout, electrical design, 3D ray-traced yield, cost model and documents in one run. It lists layout rules such as GCR, tilt and row pitch, string sizing, medium-voltage routing and single line diagrams, and CAD round trips through .dwg files.

The vendor says its simplified yield model reconciles with PVsyst and cites a Black & Veatch check of +0.24% to +1.08%; that is the vendor’s claim. Its software guide says rooftop work is better served by other tools. See the RatedPower review.

RatedPower public website page, captured 29 October 2026
RatedPower public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Also quoting rooftop or commercial jobs?

Neither tool is a sales proposal tool. Ask for a SurgePV walkthrough of design, yield and proposals in one workflow.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Who Should Pick Which?

  • Pick PVsyst if you need detailed hourly simulation, loss diagrams, a P50/P90 tool and a low published price, and your team works on Windows PCs.
  • Pick RatedPower if you develop or engineer utility-scale solar and storage and want layout, electrical design, costs and documents from one run, per company.
  • Use both if you design in RatedPower and still need PVsyst for the final lender report, as RatedPower’s guide describes.
  • Look elsewhere if your work is rooftop. RatedPower’s guide says so directly, and PVsyst has no proposal feature. SurgePV lists roof modeling, array layout, shading, yield, financial modeling and proposals from $1,899 per user per year.

Pros and cons. PVsyst: published price and deep simulation, but Windows-only and no layout automation. RatedPower: fast utility-scale design and per-company pricing, but no price shown and no trial.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Bottom Line

PVsyst is the simulation reference many teams keep, and RatedPower is the automation layer for large plants. They complement more than they compete. For rooftop and proposal work, book a SurgePV demo or see the pricing page. More reading: PVsyst alternatives, RatedPower alternatives, PVsyst vs SurgePV, RatedPower vs SurgePV and the P50 and P90 glossary entry.

Sources

Last checked: 4 November 2026.

Frequently Asked Questions

Is PVsyst or RatedPower better for utility-scale solar?

They overlap less than the names suggest. PVsyst simulates yield and losses for a system you define, while RatedPower generates layouts, electrical design, yield, costs and documents for utility-scale plants. RatedPower’s own guide says most customers keep PVsyst for the lender P50, P90 and P99 report.

How much does PVsyst cost compared with RatedPower?

PVsyst 8 Professional is CHF 700 per year on the vendor shop, one license per computer. RatedPower does not publish prices; its Basic, Advanced and Enterprise plans are “Talk to sales” and billed per company. Both checked November 2026.

Does RatedPower replace PVsyst?

Not for every workflow. RatedPower’s simplified yield mode reconciles with PVsyst, per the vendor, and it offers a 3D ray-traced mode. Its own software guide says most customers keep PVsyst for the lender P50, P90 and P99 report.

Can PVsyst design the plant layout?

PVsyst sizes systems and builds a 3D shade scene, but it is a simulation tool rather than a layout generator. The product page lists system design, near shading, electrical shading and loss diagrams. It lists no automated layout of roads, trenches or substations.

Does PVsyst or RatedPower work on Mac or in the cloud?

RatedPower is cloud software, per the vendor. PVsyst runs only on Windows, one license per computer, and the vendor lists servers, Remote Desktop and Azure Virtual Desktop as unsupported. Check the vendor pages for your setup.

Do PVsyst or RatedPower produce customer proposals?

Neither is a residential sales tool. RatedPower lists engineering and cost documents in .pdf, .docx and .dwg for utility-scale projects. No proposal or quote feature was found on the PVsyst pages read. For proposals, see SurgePV or another proposal tool.

About the Contributors

Author
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Ready to See the Difference?

Start a free trial and experience why solar teams are switching to SurgePV.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.