Comparison2026
A
Arka 360
VS
S
SurgePV

Arka 360 vs SurgePV 2026: Which Solar Design Tool Wins?

Arka 360 vs SurgePV 2026: features, pricing, and accuracy compared. Side-by-side comparison for solar designers.

Keyur Rakholiya

Written by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

Key Takeaways

  • Arka360 is the only major platform with built-in CRM — ideal for teams without existing sales software
  • SurgePV delivers native electrical engineering (SLDs, three-line diagrams) without AutoCAD
  • Arka360 supports energy storage and NEM 3.0 now; SurgePV storage is planned but not yet available
  • SurgePV covers carports, trackers, and East-West racking; Arka360 does not support these structures
  • Arka360 users report missing features (16 G2 mentions) and system instability (6 mentions)
  • SurgePV’s PVsyst benchmarking vs Arka360’s unquantified claims

Quick Verdict

Our Verdict

If you’re an India-focused residential installer without an existing CRM and need immediate battery storage support, Arka360 is the better fit. For everyone else — especially commercial EPCs, multi-market teams, or anyone needing complete electrical engineering without AutoCAD — SurgePV delivers significantly more capability at a lower total cost of ownership.

Company Overview

A

Arka360

Founded

2017

Headquarters

Union City, CA + Bengaluru, India

Focus

Solar design with built-in CRM

Best For

India & US residential

Pricing Starts

$1,699/yr (Basic, annual)

S

SurgePV

Founded

2025

Headquarters

London, UK (Global)

Focus

All-in-one solar platform

Best For

Global residential, commercial & utility

Pricing Starts

$1,499/yr (3 users)

Feature Comparison

Here’s a detailed feature-by-feature breakdown of Arka360 vs SurgePV across the capabilities that matter most to solar design teams.

FeatureArka360SurgePV
Cloud-Based Design✓✓
Satellite Imagery✓ (Google & Nearmap)✓ (Google & Nearmap)
3D Shade Analysis✓ (LIDAR-based)✓ (8760-hour simulation)
Auto Panel Layout✓ (AI-assisted)✓ (AI-powered)
String Sizing✓ (Automated)✓ (Auto-stringing)
Single-Line Diagrams (SLD)Basic (manual config, may need AutoCAD)✓ (Native, automated)
Three-Line Diagrams✗✓ (Native)
Bill of MaterialsBasic✓ (Detailed with pricing)
Permit Package Generation✓ (48hr standard)✓ (Automated)
Financial ModelingBasic (cash, loan, lease, PPA, RESCO)✓ (Global, multi-currency)
Proposal Generation✓ (Under 5 min, Sales Mode)✓ (Web + PDF)
Native CRM✓ (Built-in)API-based integration
Battery Storage Design✓ (Available now + NEM 3.0)Planned
Commercial Projects (>100kW)✓ (Limited structures)✓ (Up to 5MW)
Carport Solar Design✗✓ (Native)
Tracker Support✗✓ (Single + dual-axis)
East-West Racking✗✓
Utility-Scale Design✗✓
API AccessPremium/Enterprise only (conflicting info)✓ (All plans)
White-Label Proposals✓✓

Design Capabilities

Both Arka360 and SurgePV are cloud-based platforms that enable solar professionals to design systems using satellite imagery and LIDAR data. However, they differ significantly in their design depth, commercial structures support, and engineering capabilities.

Arka360 Design Strengths

Arka360 has established itself as a user-friendly design tool for the residential and light commercial markets. Its strengths include AI-assisted roof detection, optimized panel placement, and one of the easiest learning curves in the industry (21 G2 mentions for ease of use).

The platform supports both roof-mounted and ground-mounted systems with 3D LIDAR-based shading analysis. Users can generate proposals in under 5 minutes, and the unique Sales Mode allows real-time design changes during client meetings.

However, Arka360 has clear structural limitations. It does not support carport solar, solar trackers, or East-West racking configurations. For commercial projects requiring these structures, teams will need a second platform. Additionally, Arka360’s electrical engineering is basic — SLD generation requires manual configuration, and complex commercial electrical documentation may still require AutoCAD.

SurgePV Design Strengths

SurgePV takes a more comprehensive approach to solar design tools. The platform features AI-powered auto-design that automatically generates optimized panel layouts, along with an 8760-hour shade simulation that provides monthly shade maps for granular analysis.

Where SurgePV truly differentiates is in its commercial structures support and native electrical engineering. The platform includes built-in carport design, single-axis and dual-axis tracker support, and East-West racking optimization — none of which Arka360 offers. SurgePV also generates complete SLDs, three-line diagrams, and automatic wire sizing without requiring any additional software.

CRM & Sales Workflow

Arka360: Built-in CRM Advantage

Arka360 is the only major solar design platform with a native, made-for-solar CRM. This is a genuine differentiator for small to mid-size installers who don’t already have Salesforce or HubSpot.

The built-in CRM includes lead tracking, sales pipeline management, opportunity tracking, task management, and business analytics dashboards. For teams without an existing CRM investment, this eliminates a separate subscription and integration complexity.

The trade-off: if you already use Salesforce or HubSpot, you’re paying for a redundant feature.

SurgePV: CRM Integration Approach

SurgePV does not include a built-in CRM. Instead, it integrates with existing CRM systems via API. This approach avoids duplicating your CRM investment and allows you to keep your existing sales workflows intact.

For teams already using Salesforce, HubSpot, or Zoho, SurgePV’s integration model is actually more cost-effective. You don’t pay for CRM features you won’t use.

Proposal & Sales

Arka360 Proposals

Arka360’s proposal generator creates accurate solar proposals in under 5 minutes. The standout feature is Sales Mode — a unique capability that lets you create instant designs while interacting with clients in real time.

Proposals include 3D simulations, system metrics, ROI calculations, and financing options (cash, loan, lease, PPA, RESCO). Output formats include PDF, shareable web links, and direct email delivery.

SurgePV Proposals

SurgePV generates both web-based and PDF proposals with flexible financial modeling that supports cash, loan, lease, and PPA structures. The platform offers multi-currency support, global tax and incentive modeling, and detailed yield projections at P50/P75/P90 confidence levels.

While SurgePV lacks Arka360’s real-time Sales Mode, its proposals are backed by complete electrical documentation — a significant advantage for commercial projects where engineering credibility matters.

Pricing Comparison

Pricing is one of the most significant differentiators between Arka360 and SurgePV, especially when you factor in hidden costs like AutoCAD for complex electrical work.

PlanArka360SurgePV
Entry Level$1,699/year (Basic, annual)$1,499/year (3 users)
Premium$1,999/year (Premium, annual)$1,299/user/year (5 users)
EnterpriseCustomCustom
AutoCAD Required?Sometimes (complex commercial)No (native SLDs)
Total Year 1 Cost (1 user, commercial)$3,999+ (with AutoCAD)$1,499
Features IncludedTiered (some locked to Premium)All features, all plans
Year 1 Total Cost of Ownership (Commercial)
Arka360 $3,999+ vs SurgePV $1,499 — SurgePV saves ~63%

See Why Teams Are Switching to SurgePV

Design, simulate, propose, and generate permit packages — all in one platform, starting at $1,499/year.

Start Free Trial

No credit card required · No AutoCAD needed · Full access

Pros & Cons Side-by-Side

A

Arka360

Pros

Only major platform with built-in CRM
India market leadership and local compliance
Energy storage and NEM 3.0 available now
Fastest proposal generation (under 5 min)
Gentle learning curve (21 G2 ease-of-use mentions)
Highly rated customer support (11 G2 mentions)

Cons

Missing features cited by 16 G2 reviewers
Limited electrical engineering (may need AutoCAD)
Software performance issues (8 G2 mentions)
System instability and crashes (6 G2 mentions)
No carport, tracker, or East-West racking support
Shading accuracy not independently quantified
S

SurgePV

Pros

All features included in every plan
Native SLD, three-line, and permit packages
No separate CAD seat needed for SLDs and layouts
Carport, tracker, and East-West racking support
Documented ±3% accuracy vs PVSyst
Global financial modeling (multi-currency)
Commercial up to 5MW + utility-scale

Cons

No built-in CRM (integrates with external)
Newer platform (founded 2025)
Battery storage modeling not yet available
No real-time Sales Mode for live client interaction
Smaller user base than established competitors

Who Should Choose What?

The right choice depends on your team’s specific situation. Use this decision matrix to find the best fit.

Your SituationChoose Arka360Choose SurgePV
No existing CRM system✓
India-only residential focus✓
Need battery storage modeling now✓
Budget-conscious startup (no CRM)✓
Need electrical engineering (SLDs)✓
Commercial projects (carports, trackers)✓
Multi-market operations✓
Bankable projects needing documented accuracy✓
All-in-one platform (no add-ons)✓
Existing Salesforce/HubSpot CRM✓
Utility-scale projects✓
Lowest total cost of ownership✓

Migration Guide: Arka360 to SurgePV

Switching from Arka360 to SurgePV is straightforward. Most teams complete the transition within 2–3 weeks. Here’s a step-by-step guide:

1

Sign Up for SurgePV Free Trial

Create your SurgePV account with full access to all features. No credit card required, no feature limitations during the trial.

2

Export Project Data from Arka360

Export your existing project data, component selections, and customer records. SurgePV’s onboarding team can assist with bulk imports.

3

Recreate Active Projects Using AI Auto-Design

Use SurgePV’s AI-powered auto-design to quickly recreate your active project layouts. Most designs take minutes to regenerate.

4

Generate Electrical Documentation Automatically

SurgePV’s native SLD generation creates complete electrical diagrams in 5–10 minutes — no AutoCAD required. This step alone saves 1.5–2.5 hours per project.

5

Set Up Proposals with Your Branding

Upload your logo, configure your company branding, and generate professional proposals with SurgePV’s white-label proposal builder.

6

Cancel Arka360 After Full Transition

Once your team is comfortable with SurgePV and all active projects are migrated, cancel your Arka360 subscription. If you added AutoCAD for electrical work, cancel that too.

Frequently Asked Questions

Is SurgePV better than Arka360?

It depends on your needs. Arka360 excels for India-focused residential teams needing built-in CRM and immediate storage support. SurgePV offers superior electrical engineering, commercial structures, global coverage, and documented simulation accuracy at a lower total cost of ownership.

Can SurgePV replace Arka360 and AutoCAD?

Yes. SurgePV includes native SLD generation, three-line diagrams, and permit package creation that Arka360 requires a separate AutoCAD license ($2,000+/yr) to complete for complex commercial projects.

Which has better CRM capabilities?

Arka360 has a built-in CRM — the only major solar platform with native lead management. SurgePV integrates with existing CRMs like Salesforce and HubSpot via API. If you don’t have a CRM, Arka360 wins. If you already have one, SurgePV avoids paying for redundant features.

Is Arka360 worth the price?

For India-only residential teams without an existing CRM, Arka360’s $1,699/year Basic plan delivers strong value. For commercial EPCs or multi-market teams, SurgePV’s all-inclusive pricing and native electrical engineering deliver significantly more value per dollar.

Can I migrate from Arka360 to SurgePV?

Yes. SurgePV offers guided onboarding for teams switching from Arka360. Most teams complete migration within 2–3 weeks. Project data and component selections transfer easily; SurgePV’s automated SLD generation actually saves time compared to recreating Arka360’s manual electrical docs.

Which is better for commercial projects?

SurgePV. It supports commercial projects up to 5MW with native electrical engineering, carport design, and tracker support. Arka360 lacks carport and tracker design and requires AutoCAD for complex commercial electrical documentation.

About the Contributors

Author
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Ready to See the Difference?

Start a free trial and experience why solar teams are switching to SurgePV.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.