Comparison2026
A
Aurora Solar
VS
S
SurgePV

Aurora Solar vs SurgePV 2026: Feature, Pricing & Accuracy Comparison

Aurora Solar vs SurgePV 2026: AI automation, global compliance, and pricing. Side-by-side for solar design teams.

Keyur Rakholiya

Written by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

Key Takeaways

  • Aurora Solar excels in visual proposal quality and US market coverage
  • SurgePV includes every feature on every plan, starting at $1,499/year
  • Aurora requires a separate AutoCAD license for electrical engineering, licensed separately from Autodesk
  • SurgePV includes native SLD generation, BOM, and permit packages
  • Aurora is stronger for large US enterprises; SurgePV is better for global teams
  • Both offer cloud-based design with satellite imagery

Quick Verdict

Our Verdict

If you’re a large US enterprise doing 500+ residential projects/year and need best-in-class visual proposals with Salesforce CRM integration, Aurora Solar is the better fit. For teams that need design, simulation, proposals, electrical engineering, and financial modeling inside a single licence, with no separate CAD subscription for single-line diagrams, SurgePV covers more of the workflow.

Company Overview

A

Aurora Solar

Founded

2013

Headquarters

San Francisco, USA

Focus

Cloud solar design & proposals

Best For

US residential & commercial

Pricing Starts

$159/user/mo, or $135/user/mo billed annually ($1,620/yr)

S

SurgePV

Founded

2025

Headquarters

London, UK (Global)

Focus

All-in-one solar platform

Best For

Global residential, commercial & utility

Pricing Starts

$1,499/yr

Feature Comparison

Here’s a detailed feature-by-feature breakdown of Aurora Solar vs SurgePV across the capabilities that matter most to solar design teams.

FeatureAurora SolarSurgePV
Cloud-Based Design✓✓
Satellite Imagery✓ (Google & Nearmap)✓ (Google & Nearmap)
3D Shade Analysis✓ (LIDAR + solar access)✓ (8760-hour simulation)
Auto Panel Layout✓✓ (AI-powered)
String Sizing✓✓ (Auto-stringing)
Single-Line Diagrams (SLD)✗ (Needs AutoCAD)✓ (Native)
Three-Line Diagrams✗✓ (Native)
Bill of MaterialsBasic✓ (Detailed with pricing)
Permit Package Generation✗✓
Financial ModelingBasic (US-focused)✓ (Global, multi-currency)
Proposal Generation✓ (Best-in-class visual)✓ (Web + PDF)
CRM Integration✓ (Native Salesforce)API-based
E-Signature✓ (DocuSign)Coming soon
Battery Storage Design✓✓
Commercial Projects (>100kW)✓✓ (Up to 5MW)
Utility-Scale Design✗✓
API AccessEnterprise only✓ (All plans)
White-Label Proposals✓✓

Design Capabilities

Both Aurora Solar and SurgePV are cloud-based platforms that enable solar professionals to design systems using satellite imagery. However, they differ significantly in their design workflow depth and engineering capabilities.

Aurora Solar Design Strengths

Aurora Solar has established itself as a leading design tool for the US residential market. Its strengths include deep integration with LIDAR data for accurate roof modeling, access to NearMap HD aerial imagery for precise panel placement, and one of the best shade analysis engines in the industry using solar access data.

Aurora’s design workflow is intuitive for residential projects — you can go from satellite image to a complete panel layout in minutes. However, a notable limitation is the absence of native electrical engineering tools. If you need Single-Line Diagrams (SLDs), three-line diagrams, or detailed electrical documentation for DSO/utility approvals, Aurora requires a separate AutoCAD license, which is licensed separately from Autodesk.

SurgePV Design Strengths

SurgePV takes a more comprehensive approach to solar design software. The platform features AI-powered auto-design that automatically generates optimized panel layouts, along with an 8760-hour shade simulation that provides monthly shade maps for granular analysis throughout the year.

Where SurgePV truly differentiates is in its native electrical engineering capabilities. The platform includes built-in SLD generation, three-line diagrams, and automatic wire sizing — all without requiring any additional software. SurgePV also supports carport solar design, commercial projects up to 5MW, and utility-scale design, making it a more versatile tool for teams working across multiple project types.

Proposal & Sales

Aurora Solar Proposals

Aurora Solar produces what many consider the best-looking interactive proposals in the industry. Their proposal builder is highly visual, mobile-optimized, and designed to impress homeowners. Aurora integrates natively with Salesforce and HubSpot CRM, and offers built-in DocuSign e-signature integration, making it a complete sales workflow tool for US residential teams.

The limitation is that Aurora’s financial models are US-centric — they rely on US utility rate databases, US tax credits (ITC), and US-specific financing models. International teams will find the financial modeling restrictive.

SurgePV Proposals

SurgePV generates both web-based and PDF proposals with flexible financial modeling that supports cash, loan, lease, and PPA structures. The platform offers multi-currency support, global tax and incentive modeling, and detailed yield projections at P50/P75/P90 confidence levels.

While SurgePV’s proposal visuals are less polished than Aurora’s best-in-class interactive proposals, the financial content is significantly more comprehensive. For teams selling internationally or working on commercial projects with complex financing, SurgePV’s proposal engine delivers more actionable content.

Pricing Comparison

Pricing is one of the most significant differentiators between Aurora Solar and SurgePV, especially when you factor in Aurora’s AutoCAD dependency for electrical engineering work.

Aurora Solar’s published pricing is $159/user/month, or $135/user/month billed annually ($1,620/year), for Basic and $259/user/month, or $220/user/month billed annually ($2,640/year), for Premium, per Aurora’s pricing page (checked 21 September 2026). Enterprise is quoted per project.

PlanAurora SolarSurgePV
Entry LevelBasic $159/user/mo, or $135/user/mo billed annually ($1,620/year)$1,499/year (3 users)
PremiumPremium $259/user/mo, or $220/user/mo billed annually ($2,640/year)$1,299/user/year (5 users)
EnterpriseCustom per projectCustom
AutoCAD Required?Yes (licensed separately from Autodesk)No (native SLDs)
Electrical DocumentationSeparate CAD licence requiredIncluded in the subscription
Features IncludedTiered (some locked)All features, all plans

The structural difference is the one to weigh: SurgePV includes SLD generation in its own licence, so an EPC does not license a separate CAD tool for that step. Aurora’s published tiers cover design and proposals, and electrical documentation is licensed separately from Autodesk on top.

See Why Teams Are Switching to SurgePV

Design, simulate, propose, and generate permit packages — all in one platform, starting at $1,499/year.

Start Free Trial

No credit card required · No AutoCAD needed · Full access

Pros & Cons Side-by-Side

A

Aurora Solar

Pros

Best-in-class visual proposal quality
Strong CRM integration (Salesforce native)
Excellent US market coverage and utility data
Mature platform with large user base
DocuSign e-signature integration

Cons

No native electrical engineering (SLD/three-line)
Requires AutoCAD license for DSO approvals
US-centric financial modeling
Electrical documentation needs a separate CAD licence
Feature-gated pricing tiers
S

SurgePV

Pros

All features included in every plan
Native SLD, three-line, and permit packages
One flat subscription with no separate CAD licence to buy
Global financial modeling (multi-currency)
AI-powered auto-design and auto-stringing
Utility-scale support (up to 5MW)

Cons

Newer platform (founded 2025)
Proposal visuals less polished than Aurora
No native CRM (API-based integration)
E-signature integration coming soon
Smaller US-specific utility database

Who Should Choose What?

The right choice depends on your team’s specific situation. Use this decision matrix to find the best fit.

Your SituationChoose AuroraChoose SurgePV
Large US enterprise (500+ projects/yr)✓
Need Salesforce CRM integration✓
Budget-conscious teams✓
Need electrical engineering (SLDs)✓
International/European market✓
Commercial + utility-scale projects✓
Best visual proposal quality✓
All-in-one platform (no add-ons)✓
Small team (1-5 people)✓
Need permit package generation✓

Migration Guide: Aurora Solar to SurgePV

Switching from Aurora Solar to SurgePV is straightforward. Most teams complete the transition within 1-2 days. Here’s a step-by-step guide:

1

Sign Up for SurgePV Free Trial

Create your SurgePV account with full access to all features. No credit card required, no feature limitations during the trial.

2

Import Project Data and Customer Information

Transfer your existing project data and customer records into SurgePV. The onboarding team can assist with bulk imports.

3

Recreate Active Projects Using AI Auto-Design

Use SurgePV’s AI-powered auto-design to quickly recreate your active project layouts. Most designs take minutes to regenerate.

4

Generate Proposals with Your Branding

Set up your company branding, upload your logo, and generate professional proposals with SurgePV’s white-label proposal builder.

5

Cancel Aurora Subscription After Transition

Once your team is comfortable with SurgePV and all active projects are migrated, cancel your Aurora Solar and AutoCAD subscriptions.

Frequently Asked Questions

Is SurgePV better than Aurora Solar?

It depends on your needs. Aurora Solar excels for large US enterprises needing CRM integration and visual proposals. SurgePV includes all features in one subscription, with native electrical engineering and global financial modeling, and no separate CAD licence to buy.

Can SurgePV replace Aurora Solar and AutoCAD?

Yes. SurgePV includes native SLD generation, three-line diagrams, and permit package creation that Aurora requires a separate AutoCAD license to accomplish. AutoCAD is licensed separately from Autodesk.

Which has better shade analysis?

Both offer excellent shade analysis. Aurora uses LIDAR and solar access data. SurgePV provides 8760-hour simulation with monthly shade maps. For most projects, both deliver comparable accuracy.

How does Aurora Solar’s pricing compare to SurgePV’s?

Aurora Solar’s published pricing is $159/user/month, or $135/user/month billed annually ($1,620/year), for Basic and $259/user/month, or $220/user/month billed annually ($2,640/year), for Premium, per Aurora’s pricing page (checked 21 September 2026). Enterprise is quoted per project. SurgePV starts at $1,499/year with all features included on every plan, including SLD generation, so there is no separate CAD licence to buy for electrical documentation.

Can I migrate from Aurora Solar to SurgePV?

Yes. SurgePV offers guided onboarding for teams switching from Aurora. Most teams are fully transitioned within 1-2 days.

Which is better for commercial projects?

SurgePV supports commercial projects up to 5MW with native electrical engineering. Aurora handles commercial design but lacks native SLD generation and requires AutoCAD for engineering documentation.

About the Contributors

Author
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Ready to See the Difference?

Start a free trial and experience why solar teams are switching to SurgePV.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.