Answer
A SolarNexus alternative should match the sales, project, and data-export work your team needs. Its public starting price is $90 per license with three licenses minimum, but the billing period is unspecified. Compare written quotes and migration terms; SurgePV covers design and proposals rather than a verified CRM replacement.
Last updated: November 2026
Choose a replacement by tracing one project from lead capture through the final handoff. A low starting price is useful only when the quote also explains seats, billing, implementation, and the work your team can actually move. CRM means customer relationship management.
SurgePV publishes this post and sells solar design software. SurgePV and QuickEstimate have a commercial relationship; QuickEstimate is a sponsored inclusion. Vendor pages were checked in November 2026.
Key takeaways
- SolarNexus lists lead capture, array design, proposals, task workflows, reports, and a mobile app.
- Its solutions page shows a starting price. The page carries a date stamp of 7 March 2022.
- Ownership language is not an export specification. Request a sample export before moving.
- Set a cancellation reminder from your signed order form before beginning migration.
Moving the design and proposal part of your workflow?
Bring a representative project to a SurgePV demo and compare its design outputs with the handoff your team needs.
Book a DemoChecking cost first? See the SurgePV pricing page.
What does SolarNexus do?
The SolarNexus solutions page describes sales and project workflow software. Its published features span these areas.
- Sales: lead capture, solar array design, hourly energy models, financial estimates, and proposal and contract templates.
- Operations: custom workflows, automatic task assignment, project documents and photos in one place, and work groups.
- Reports: it logs the workflow of every job and offers custom reports.
- Communication: a mobile app, automatic customer emails, team notifications, and @mentions.
- Help: customer support, professional services, and user guides.
The integrations page lists lead generation providers, lead qualification and scheduling by text, residential plan set services, and a customer portal with fleet monitoring.
What does SolarNexus cost?
The solutions page lists a $90 starting price per license and a three-license minimum, with quantity discounts. It omits the billing period and carries a March 7, 2022 timestamp. Obtain a dated quote before comparing annual costs.
The SolarNexus terms, timestamped January 25, 2022, specify individual logins, advance monthly or annual billing, non-refundable subscriptions, and 30 days’ notice for price changes. Conflicting order-form terms take precedence.
Key Takeaway
An unspecified billing period prevents an annual price comparison. Ask each vendor to itemize the subscription, minimum seats, implementation, integrations, and renewal terms.
Which tools can you compare?
This list is alphabetical. It is not complete. It names tools whose own sites describe sales and project features, which are the jobs the SolarNexus pages list. SurgePV is included only for its design and proposal side. Prices are what each vendor’s site showed in November 2026. Currencies, billing periods, and product scopes differ; the table is a purchasing checklist, not a cost ranking.
| Tool | What its site says it covers | Price its site shows | Setup help its site names |
|---|---|---|---|
| Enerflo | Sales Core (deal pipeline, scheduling, proposals, contracts, e-signatures) and Install Tracker (project management and milestones). Built-in CRM functionality. Built for residential solar and light commercial | Not published. A monthly subscription priced by average monthly volume, a one-time implementation fee, and a 12-month minimum contract for new partners | Subscription includes onboarding and training with guided setup |
| OpenSolar | Design, sales, and project management. Includes Project Management CRM (projects, workflow stages, actions, calendar, documents) | Core app free. API Access charges began 16 April 2026; connectors have separate rollout and billing details. Optional Enterprise Services: Support US$500 / month, Customize US$1,350 / month | Support plan: guided setup, priority support, and training, with account setup such as pricing scheme and contract and file template upload |
| QuickEstimate (sponsored) | Lead capture, WhatsApp follow-up, pipeline, quotations, and proposals. Marketed to Indian engineering, procurement, and construction (EPC) businesses | Free: ₹0, 1 user, 10 proposals a month. Pro: ₹6,999 per user per year, minimum 3 users, billed annually. Larger teams: contact sales | Pro lists bulk Excel import. The larger-team offer lists an app walkthrough; agree onboarding scope in the quote |
| SurgePV | Design and proposal side only: 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output, proposals | USD 1,899 per user per year (1 user), USD 1,499 per user per year (3 seats), USD 1,299 per user per year (5 seats). Guided demo, no self-serve trial | “Free onboarding” is listed on each per-user plan card on the pricing page |
Sources: Enerflo FAQ, OpenSolar Enterprise Services, OpenSolar pricing post, QuickEstimate pricing, and SurgePV’s pricing page. The QuickEstimate pricing page now calls the product “Quickest Solar CRM.”
For OpenSolar’s CRM in more detail, read our OpenSolar CRM alternative guide.
Compare annual seat rates on the same basis
SurgePV’s published annual tiers offer a comparable set of per-user figures. The lower rate at a larger seat count is not a lower total bill, and these design-software prices do not price a full SolarNexus migration.
| SurgePV annual tier | USD per user per year | Required seats | Calculated annual subscription total, USD |
|---|---|---|---|
| Individual | 1,899 | 1 | 1,899 |
| Three-seat team | 1,499 | 3 | 4,497 |
| Five-seat team | 1,299 | 5 | 6,495 |
- 1-seat tier$1,899
- 3-seat tier$1,499
- 5-seat tier$1,299
Source: SurgePV pricing page; required seats and total commitments shown above, checked November 2026.
Source: SurgePV’s published plans. Totals multiply each listed rate by its required seat count. Request a written quote for final terms and any additional services.
Check the proposal handoff before switching tools
Use a SurgePV walkthrough to inspect a roof model, production assumptions, and the proposal your sales team would receive.
Book a DemoChecking cost first? See the SurgePV pricing page.
Public Website Homepage Captures
These images show the vendors’ public website heroes as seen on 29 October 2026. They are not screenshots from product testing.
SolarNexus

Enerflo

OpenSolar

QuickEstimate

SurgePV

What happens to your data?
The linked terms preserve ownership of uploads and convert a cancelled paid account to a free account with one login. After 90 inactive days, deletion is scheduled; data is deleted 30 days later.
The solutions, integrations, and terms pages checked here do not document export formats. Ask for written instructions and a sample file before relying on migration access.
Before you cancel, ask SolarNexus in writing:
- Which file formats can you export?
- Do exports include documents, photos, notes, and task history?
- Who runs the export, how long does it take, and does it cost money?
Pro Tip
Ask for one sample export with a project, its attachments, and its history. Open it in the destination workflow and record missing fields before approving a cancellation.
A short checklist for moving
- List the jobs you use today: lead capture, design, quotes, tasks, reports, and mobile.
- Get your export request answered in writing. Do this before you cancel.
- Test the new tool with a small set of real projects, with permission to use the data.
- Compare counts. Do the number of customers, projects, and documents match?
- Keep access until the check passes, and schedule cancellation from the applicable order form.
- Train your team on real work, not a demo.
For questions about links between tools, use our integration planning checklist. For sales requirements, compare the workflow in our solar-company CRM guide.
Where does SurgePV fit?
SurgePV’s published product scope lists 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output, and proposal generation. SolarNexus also lists array design, energy models, financial estimates, and proposals.
SurgePV’s published product scope supports design and proposal work; it is not evidence of a complete CRM replacement. Map the lead, task, and customer-history requirements separately.
A SolarNexus data importer is not documented in SurgePV’s published scope. Bring your export requirements to a guided demo, and get any migration commitments in writing before cancelling the existing service.
Frequently Asked Questions
How much does SolarNexus cost?
Its public starting price is $90 per license, with a three-license minimum. The page omits the billing period, so request a dated quote.
What are the alternatives to SolarNexus?
Enerflo, OpenSolar, and QuickEstimate publish sales and project tools. SurgePV covers design and proposals; compare the workflows you need before treating it as a replacement.
Can I export my data from SolarNexus?
Export formats are not documented on the public pages checked here. Ask for written instructions and a sample export before cancelling.
What happens to my data if I cancel SolarNexus?
Cancellation converts the account to a free single-login plan. After 90 inactive days, deletion is scheduled 30 days later, according to the linked terms.
Can I cancel SolarNexus at any time?
Monthly cancellation takes effect at the paid period’s end. Annual cancellation through the software is available in the final paid month; check your order form.
Can SurgePV replace SolarNexus?
SurgePV can be considered for the design and proposal portion of the workflow. Its published scope does not document a full CRM replacement or a SolarNexus importer.
Is QuickEstimate a SolarNexus alternative?
QuickEstimate, now branded Quickest Solar CRM on its pricing page, lists sales tools for Indian solar businesses. It is a sponsored inclusion here; evaluate its project coverage and migration requirements separately.
Sources
Primary research and reference material used for this desk-research article.
Where this fits
This article is part of SurgePV's Solar Design hub, which works through the topic from first principles to the decisions a project team actually has to make.


