Answer
Listed solar CRM prices in India start at ₹0. QuickEstimate Pro is ₹6,999 per user per year, with a 3-user minimum. Zoho CRM Standard to Enterprise is ₹800 to ₹2,400 per user per month. Salesforce is USD 25 to USD 550 per user per month. Add GST, set-up, data moving and message costs, then compare a 3-year total.
The price on a CRM pricing page is rarely the price you pay. Seat cost is one line. GST, set-up, data moving, WhatsApp and SMS charges, connectors and the cost of leaving all sit on top.
SurgePV publishes this post and sells solar design software. SurgePV also has a commercial relationship with QuickEstimate, one of the CRMs listed below.
Last updated: November 2026
A CRM (customer relationship management) is software that tracks your leads, calls, quotes and follow-ups. The seat price is only part of what you pay. This guide shows the listed prices, the yearly cost for 3 and 10 users, and the other costs to add.
Quote From a Design, Not a Spreadsheet
A CRM tracks the lead. Design software builds the proposal that closes it. See SurgePV’s design-to-proposal workflow on a real project.
Book a DemoChecking cost first? See the SurgePV pricing page · 20 minutes · No credit card required
What Do Solar CRMs Cost in India?
The table shows the prices listed on each vendor’s own pricing page, read on 28 October 2026. Prices change, so check the page again before you buy.
| Plan | Listed price | Notes |
|---|---|---|
| QuickEstimate Free | ₹0 | 1 user, 10 proposals a month |
| QuickEstimate Pro | ₹6,999 per user per year | Minimum 3 users, billed yearly |
| QuickEstimate Enterprise | Custom | Listed for 25 or more users |
| Zoho CRM Free | ₹0 | Up to 3 users |
| Zoho CRM Standard | ₹800 per user per month | Yearly billing |
| Zoho CRM Professional | ₹1,400 per user per month | Yearly billing |
| Zoho CRM Enterprise | ₹2,400 per user per month | Yearly billing |
| Salesforce Free Suite | USD 0 | Per user per month |
| Salesforce Starter Suite | USD 25 per user per month | Billed monthly or annually |
| Salesforce Pro Suite | USD 100 per user per month | Billed annually |
| Salesforce Core | USD 195 per user per month | Billed annually |
| Salesforce Advanced | USD 395 per user per month | Billed annually |
| Salesforce Max | USD 550 per user per month | Billed annually |
Sources: the QuickEstimate pricing page, the Zoho CRM pricing page and the Salesforce India pricing page.
Some notes on the table:
- QuickEstimate shows its product as “Quickest Solar CRM” on its site. Its Pro plan lists unlimited proposals, 1,00,000 leads and 2 GB of storage.
- Zoho says local taxes may apply. It also lists an Ultimate edition for large setups, but its pricing page does not give a price for it.
- Zoho shows prices by country. The rupee figures here are the India prices in Zoho’s own pricing data. Zoho’s monthly billing costs more per user than yearly billing.
- Salesforce India lists prices in US dollars. Its page says the information is subject to change and that you should contact a sales representative for detailed pricing.
Disclosure: SurgePV and QuickEstimate have a commercial relationship. QuickEstimate is listed here under the same rules as every other tool.
What Does a Team Pay Each Year?
This table multiplies the listed price by 12 months and by the number of users. It is the list price only. It leaves out tax, discounts, add-ons and set-up.
| Plan | 3 users, 1 year | 10 users, 1 year |
|---|---|---|
| QuickEstimate Pro | ₹20,997 | ₹69,990 |
| Zoho CRM Standard | ₹28,800 | ₹96,000 |
| Zoho CRM Professional | ₹50,400 | ₹168,000 |
| Zoho CRM Enterprise | ₹86,400 | ₹288,000 |
| Salesforce Starter Suite | USD 900 | USD 3,000 |
| Salesforce Pro Suite | USD 3,600 | USD 12,000 |
| Salesforce Core | USD 7,020 | USD 23,400 |
| Salesforce Advanced | USD 14,220 | USD 47,400 |
- QuickEstimate Pro₹20,997
- Zoho CRM Standard₹28,800
- Zoho CRM Professional₹50,400
- Zoho CRM Enterprise₹86,400
Source: QuickEstimate and Zoho CRM pricing pages, multiplied as shown above; Salesforce is listed in US dollars so it is left out, checked 28 October 2026.
Key Takeaway
List price can differ by about four times for the same 3 users (₹20,997 against ₹86,400 a year), but the plans do not cover the same features. Compare them only after you price set-up, messaging and exit costs.
How the numbers work:
- QuickEstimate Pro: ₹6,999 × 3 users = ₹20,997. With 10 users, ₹6,999 × 10 = ₹69,990.
- Zoho Standard: ₹800 × 12 months = ₹9,600 per user. For 3 users, ₹9,600 × 3 = ₹28,800.
- Salesforce Core: USD 195 × 12 = USD 2,340 per user. For 3 users, USD 7,020.
For a 3-year total, multiply by 3 if the price stays the same. For example, 5 users on QuickEstimate Pro: ₹6,999 × 5 × 3 years = ₹104,985. Prices can change at renewal. The Pro plan lists a 3-user minimum, so a team of 1 pays for 3 on Pro. A solo user can look at the Free plan.
Do not convert US dollars with a guessed exchange rate. Ask your bank or the vendor for the rate and the fees.
Which Costs Come on Top of the Seat Price?
The seat price is easy to see. These costs are harder to see, so ask about each one:
- Set-up. Time to build fields, pipelines, roles and reports.
- Moving old data. Cleaning and loading leads from spreadsheets or an old CRM.
- Messages and calls. WhatsApp, SMS and phone charges may be billed by a message provider, not the CRM. Do not assume the CRM price includes them.
- Connectors. Linking Meta lead ads, IndiaMART or your website may need extra tools. API access (the way two programs share data) may need a higher plan.
- Storage. Photos, documents and call files use space. QuickEstimate Pro lists 2 GB. Check the limit and the price for more.
- Training and admin time. Someone must set up users, fix data and run reports.
- Support. Check what support is included and what costs extra.
- Leaving. Test whether you can export all leads, notes, files and history.
Our guides cover these topics in more detail: the solar CRM software guide for India, free solar CRM options, the Meta lead CRM guide and the IndiaMART lead CRM guide. For tool choice, see best CRM for installers. For two vendors in detail, see Salesforce for solar companies and Zoho CRM for solar companies.
How Do You Work Out a 3-Year Cost?
Use this simple formula. TCO means total cost of ownership, everything you pay over time.
3-year TCO = seats + set-up + data move + connectors + messages + storage + training and admin time + support + exit costs
Do it in three steps:
- List your users. Count sales staff, managers and anyone who needs a login. Check how the vendor counts each type.
- Get a written quote. Ask each vendor to price the same users, the same needs and the same 3 years. Ask them to mark each line as included, extra or unknown.
- Fill the formula. Use quotes where you have them and your own estimates where you do not. Mark each line as quoted or estimated, so you see how sure the total is.
Run a low, a middle and a high case. Change the number of users, the price at renewal and the set-up effort. See how the total moves.
Pro Tip
Ask every vendor the same six questions in writing, and ask them to mark each cost line as included, extra or unknown. A line marked unknown is where the surprise bill usually comes from.
How Does GST Affect the Price?
Ask each vendor to show GST as a separate line. QuickEstimate’s pricing page says it issues tax invoices with GST, HSN and your registered details, and that the invoices are eligible for input tax credit (ITC, a way to offset tax you paid). Zoho’s page says local taxes may apply. Salesforce’s India page lists US dollar prices.
Ask your accountant whether you can claim ITC on the CRM. Also ask the vendor for its legal name and its GSTIN (GST registration number). You can check a GSTIN on the government’s GST search page.
Should You Pay Yearly or Monthly?
QuickEstimate Pro is billed yearly only, and its pricing page says you can add users during the year at a prorated price. Zoho shows a lower per-user price for yearly billing than for monthly billing. Yearly billing is cheaper, but it ties up cash. It only pays off if you keep the users for the full year. Read the refund and cancellation terms before you pay.
Pilot the Proposal Side Too
While you pilot a CRM, bring a real project to SurgePV and see how design, yield and proposals work from one model.
See the Proposal WorkflowWant the price? Read the SurgePV pricing page · Live project walkthrough
How Do You Test a CRM Before You Buy?
Run a short pilot with real users and real leads. A demo shows how the product looks. A pilot shows how it works in your office.
Measure these before and after:
- Time from a new lead to the first follow-up
- Number of duplicate or missing leads
- Time to prepare and send a quote
- Hours spent fixing data
- Support questions and how fast they are answered
Add edge cases: a lead that comes twice, a user who leaves the company, and a full data export. Count the cost of the pilot too, including staff time. The mobile CRM guide covers field use. The CRM and quotation guide covers quotes.
What Questions Should You Ask Before You Sign?
- What exactly does the price include, and what costs extra?
- What is the minimum number of users?
- What will the price be at renewal?
- How can I cancel, and what do I get back?
- Who is the legal seller, and what is their GSTIN?
- Can I export all my data? In what format?
Send every vendor the same list. Compare the answers side by side.
Further Reading
For feature comparisons rather than price, read the solar CRM software guide for India and free solar CRM options.
Where Does SurgePV Fit?
SurgePV is not in the tables above, because they compare CRM prices. SurgePV is solar design and proposal software. It supports roof modeling, layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. Its prices are USD 1,899 per user per year for one seat, USD 1,499 per user for 3 seats and USD 1,299 per user for 5 seats. See the pricing page, or book a SurgePV demo to see it work on your own project.
Before you buy design software, read our guide on free vs paid solar design software. For project cost context, see industrial rooftop solar cost in India.
Frequently Asked Questions
How much does solar CRM cost in India?
Listed prices start at ₹0 for the QuickEstimate Free and Zoho Free plans. QuickEstimate Pro is ₹6,999 per user per year with a 3-user minimum. Zoho CRM Standard to Enterprise is ₹800 to ₹2,400 per user per month billed yearly. Salesforce is USD 25 to USD 550 per user per month. GST and set-up costs are extra.
Does QuickEstimate provide GST invoices?
Its pricing page says it issues tax invoices with GST, HSN and your registered details, and that they are eligible for input tax credit (ITC). Ask your accountant whether you can claim ITC.
What costs are missing from CRM seat pricing?
Set-up, moving old data, message and call charges, connectors to other tools, extra storage, training, staff time to run the system, support plans, GST, and the cost of exporting your data if you leave.
Can Zoho and Salesforce prices be compared directly?
Not on the list price alone. Zoho shows rupees and Salesforce India shows US dollars. Plans also differ in billing, limits and add-ons. Compare the same number of users over 3 years and include all extra costs.
Should a solar EPC pay yearly or monthly?
QuickEstimate Pro is billed yearly only. Zoho shows lower per-user prices for yearly billing than for monthly billing. Yearly billing saves money only if you keep the users and the tool for the full year, so check the refund and cancellation terms first.
How should a solar EPC test a CRM before buying?
Run a short pilot with real users, real leads and real quotes. Count the time to follow up a new lead, the number of duplicate leads, and the hours spent fixing data. Also test exporting all your data.
Is SurgePV in the CRM price tables?
No. This page compares CRM prices. SurgePV is solar design and proposal software priced at USD 1,899 per user per year for one seat, USD 1,499 per user for 3 seats and USD 1,299 per user for 5 seats. See the pricing page for details.
Sources
Primary research and reference material used for this desk-research article.
Where this fits
This article is part of SurgePV's Solar Design hub, which works through the topic from first principles to the decisions a project team actually has to make.


