Back to Best Solar Software
Best ListBest-Of List5 tools compared

Solar Software in Romania (2026): Five Tools Compared

Five solar software tools compared on what each vendor publishes for Romanian work: price currency, yield evidence, proposals and the ANRE prosumer rules. Checked November 2026.

SurgePV publishes this list and sells solar design and proposal software, so we have a commercial interest in this category. This is a desk comparison of what each vendor publishes; we have not run side-by-side tests. Prices and vendor facts checked November 2026. How we evaluate software

Published Last updated
Rainer Neumann

Written by

Rainer Neumann

Editorial contributor · SurgePV

Keyur Rakholiya

Edited by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

If you design and sell solar in Romania, pick by the job. OpenSolar’s core app is free. PVsyst documents P50 to P90 yield results, which suit a lender file (P90 is a yield expected to be met or exceeded in 90% of years). HelioScope prices per license for commercial design. Aurora Solar prices per user for residential design and proposals. SurgePV lists roof modeling, single line diagrams, bill of materials (a parts list) and proposals in one product, priced per user. No vendor here states a euro or lei price, a Romanian language interface, or an ANRE prosumer rule on the pages we read.

This is a desk comparison of what each vendor publishes, checked November 2026. We have not run side-by-side trials. SurgePV publishes this page and is one of the five tools on it. Local rules come from ANRE’s own prosumer Q&A page. Tool facts come from each vendor’s own site. Other tools are not compared here. See the global list of solar design software for them.

Criteria used: price currency, yield evidence, proposal output, diagram output, and whether the vendor states any Romanian rule.

Want to see SurgePV on your own Romanian project?

Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Best-For Picks for Romania

  • Yield evidence for a commercial roof or a lender: PVsyst. Its help documents P50 to P90 evaluations. It runs on Windows only and describes no proposals.
  • A free core app for small prosumer jobs: OpenSolar. The vendor says the core app is free. API Access and connectors are charged from 16 April 2026.
  • Commercial roofs with storage, priced per license: HelioScope. Pro adds financial modeling, proposals and P90 values. Basic is $159 per license per month.
  • Residential design with a sales proposal, per user: Aurora Solar. Basic is $159 per user per month. The price list names no currency.
  • Roof model to bill of materials and proposal in one product, priced per user: SurgePV. Ask in a demo how it handles Romanian prosumer settlement. Its published scope states no Romanian rule.

Comparison Table

Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked November 2026 on each vendor’s own page.

Tool Best for Price Free or paid Decisive scope fact
Aurora Solar Residential design and sales proposals, per user Basic $159 per user per month; $135 per user per month billed annually Paid Price list shows a “$” sign without naming the currency
HelioScope Commercial design and modeling, per license Basic $159 per license per month; $1,620 per license per year Paid, free trial offered Off-grid is not mentioned on the pages we read
OpenSolar Free core app Core app free; API Access and connectors charged from 16 April 2026 Free core app, paid API and connectors Documents no local rule for Romania
PVsyst Yield simulation and P50 to P90 evidence CHF 700 per year (Professional) Paid, one-month trial Windows only; no proposal generation described
SurgePV Roof model to BOM and proposal, per user $1,899 per user per year (1 user) Paid, guided demo BOM and proposal generation in scope; no Romanian rule stated

Romania Criteria Matrix

Each cell is Documented, Partial or Not stated, based on the vendor pages we read in November 2026. They are linked in the entries and under Sources and Dates. Documented means the page states it for this task. Partial means the page lists a related feature but not the Romanian item. Not stated means the pages we read do not mention it. There are no scores or weights.

Tool Local tariff or prosumer entry Diagram output Price currency Yield evidence
Aurora Solar Not stated Not stated Partial ($ sign; currency not named) Not stated
HelioScope Not stated Not stated Documented (USD) Partial (P90, P95 and P99 values listed under Pro)
OpenSolar Not stated Documented (single-line diagrams listed; Romania not named) Partial (core app free; no local price) Not stated
PVsyst Partial (economic assessment listed; no Romanian rule stated) Not stated Documented (CHF) Documented (P50 to P90 help page)
SurgePV Partial (financial modeling listed; no Romanian rule stated) Documented (single line diagrams listed; Romania not named) Partial ($ sign; currency not named) Partial (yield and financial modeling listed; P50 to P90 not stated)

Two things stand out. No vendor page we read mentions ANRE, prosumer net billing or a Romanian DSO. The tools differ most on price model, on P50 to P90 evidence and on whether they output a diagram.

Tool Entries

Aurora Solar

Best for: teams that want residential design and sales proposals on a per-user plan and can work with a “$” price list.

Not the right choice if: you need a price in lei or euros, or a P-value report. The pages we read state neither.

What the vendor documents: Aurora’s homepage says its tools cover design, pricing, contracting and permitting. It describes roof modeling, panel placement and shading analysis, and a Sales Mode that turns a design into a proposal with pricing, financing and savings. The site offers regional versions for Deutschland, España, France, the United Kingdom and Europe (English), and it shows North America by default.

Price (checked November 2026): on the pricing page, Basic is $159 per user per month, or $135 per user per month billed annually ($1,620 billed annually). Premium is $259 per user per month, or $220 per user per month billed annually ($2,640 billed annually). Enterprise is custom per project. The page uses a $ sign without naming the currency and shows North America as the selected region.

Limitations: the pages we read name no ANRE, DSO or Romanian item and state no P-value output.

Vendor link: aurorasolar.com.

Aurora Solar public website page, captured 29 October 2026
Aurora Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

HelioScope

Best for: commercial installers who want rooftop, carport and ground-mount design with storage, priced per license, and who may need P90 values (Pro plan).

Not the right choice if: you need off-grid design (the pages we read do not mention it) or an unlimited-project plan below Enterprise. Basic and Pro include 10 projects per month.

What the vendor documents: the HelioScope site describes a commercial design and sales platform and says users can “model rooftop, carport, and ground mount solar together with storage”. On the pricing page, Basic covers foundational design and modeling, storage design and designs up to 1.25 MW DC. Pro adds financial modeling and sales proposals, P90, P95 and P99 values and designs up to 5 MW DC. Enterprise adds unlimited users, single-axis trackers, PVsyst export, direct API access and designs up to 30 MW DC. The pages we read do not mention off-grid design.

Price (checked November 2026): Basic is $159 per license per month, or $1,620 per license per year. Pro is $259 per license per month, or $2,640 per license per year. Both include 1 user and 10 projects per month. Enterprise is custom. Prices are shown in USD. A free trial is offered.

Limitations: the pages we read name no Romanian item and do not mention off-grid. Both paid plans include 10 projects per month.

Vendor link: helioscope.aurorasolar.com.

HelioScope public website page, captured 29 October 2026
HelioScope public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

OpenSolar

Best for: small installers who want a free core app for design and proposals.

Not the right choice if: you need documented P50 to P90 results or a vendor that states local rules. The pages we read state neither.

What the vendor documents: the homepage says OpenSolar is free software for solar professionals that covers design, sales and project management. It lists automated system design and bill of materials, single-line diagrams, proposal creation, cash-flow analysis, integrated financing and e-signatures. It also lists an API as an add-on.

Price (checked November 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access and supported connectors, per its post on data export pricing. The post says the core app stays free for the full workflow inside the platform. No local-currency price appears on the pages we read.

Limitations: the pages we read state no Romanian tariff or prosumer rule. Charges for API Access and connectors apply from 16 April 2026.

Vendor link: opensolar.com.

OpenSolar public website page, captured 29 October 2026
OpenSolar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVsyst

Best for: yield evidence on a larger roof or ground-mounted site where a lender or investor wants a simulation report.

Not the right choice if: you want proposals from the same tool (the pages we read describe none), or you work on a Mac. The requirements page says PVsyst runs only under Windows.

What the vendor documents: a P50 to P90 evaluation that treats annual yield as a probability distribution. The page says P50 and P90 are exceedance values and that they are only meaningful for annual yields. The product page describes stand-alone (off-grid) simulation with energy storage and sun-tracking pumping systems. It also lists an economic assessment with CAPEX, OPEX, NPV, LCOE and ROI. It does not describe proposal generation.

Price (checked November 2026): CHF 700 per year for PVsyst 8 Professional, with grouped-order discounts of 5% for 2 to 4 licences, 15% for 5 to 9 and 20% for 10 or more. The product page offers a one-month free trial. No lei or euro price is published.

Limitations: the pages we read name no Romanian rule. PVsyst is a simulation tool, and the pages we read describe no proposal generation.

Vendor link: pvsyst.com.

PVsyst public website page, captured 29 October 2026
PVsyst public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV

SurgePV publishes this page and is one of the five tools on it, so read this entry with that in mind.

Best for: teams that want roof modeling, shading, yield, financial modeling, single line diagrams, bill of materials and proposals in one product, priced per user. Ask for Romanian outputs in a demo.

Not the right choice if: you want a self-serve trial (SurgePV offers a guided demo), you want a free tool for small jobs (OpenSolar’s core app is free), or you need a price in lei or euro in writing before talking to sales. The pricing page lists US-dollar-style “$” prices and says taxes and terms are confirmed in your quote. Outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender or utility.

What the vendor documents: AI roof generation, hour-by-hour shade studies, hourly yield modeling with a loss breakdown, bankable energy yield and financial modeling, stringing, single line diagrams and wire sizing, and white-label proposals with a bill of materials. See solar design software for the product page.

Price (checked November 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 users, $1,299 per user for 5 users. The page does not name the currency. Taxes, renewal and cancellation terms are confirmed in your quote.

Limitations: results depend on source data, assumptions and equipment models. The pricing page and published scope do not state a Romanian-language interface, a Romanian prosumer rule or P50 to P90 results. SurgePV does not publish a CRM (customer tracking tool) or monitoring in its scope.

Vendor link: surgepv.com.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Romanian Prosumer Rules That Shape the Choice

Systems up to 200 kW. On ANRE’s Q&A page on prosumers after 1 July 2025, ANRE says prosumers have the right to quantitative compensation directly on the invoice. Surplus energy can be used over up to 24 months from the invoice date. Quantitative compensation means exported kWh offset imported kWh rather than being paid at a price.

Systems from 200 kW to 400 kW. The same page says suppliers must buy the energy produced and delivered at the weighted average price on the day-ahead market (Piata pentru Ziua Urmatoare). Check which band your project falls into before you model savings.

What is not covered here. We did not read a current ANRE order text, the Casa Verde Fotovoltaice guide from AFM, or DSO connection rules, so we state none of them. Law 123/2012 has been amended more than once, so read the current text on anre.ro before you quote a client.

Regulator pointer. Use ANRE for prosumer rules and guides.

What to Ask a Vendor Before Buying

Ask each vendor for one sample project. Then look for these items. First, a way to enter a prosumer tariff, either offset against the bill or paid at a market price. Second, a diagram you could hand to a grid operator. Third, a P50 to P90 yield if a lender is involved. Fourth, a price in the currency you will be invoiced in. Where a vendor does not publish a feature on the pages we read, the matrix says so. A demo or trial is the place to check it.

How We Ordered These Tools

We did not rank these tools. They are listed alphabetically, and the best-for picks come from the matrix above.

  • Local tariff or prosumer entry: Romanian savings depend on whether a project is offset on the bill or paid at a market price. We did not assess whether any calculation is correct.
  • Diagram output: grid connection files need an electrical drawing. We did not assess whether any tool’s diagram meets a Romanian operator’s format.
  • Price currency: the currency shows what a Romanian buyer will pay and whether tax is added. We did not assess discounts or negotiated quotes.
  • Yield evidence: larger projects may need a report a lender will read. We did not assess acceptance by any lender.

Sources and Dates

Vendor pages were read in November 2026. Aurora Solar (homepage, pricing). HelioScope (site, pricing). OpenSolar (homepage, free, API and connector charges). PVsyst (shop, product, requirements, P50 to P90). SurgePV (pricing, solar design software). Romanian rules come from ANRE only. HelioScope Enterprise and other plan details are on its pricing page.

See SurgePV on your own Romanian project

Book a guided demo and ask for the Romanian outputs you need.

Book a Free Demo

Go Deeper on a Category

Frequently Asked Questions

What is the best solar software in Romania?

It depends on the job. OpenSolar’s core app is free. PVsyst documents P50 to P90 yield results. HelioScope and Aurora Solar price in dollars, per license or per user. SurgePV lists roof modeling, single line diagrams, bill of materials and proposals in one product. No vendor page we read states a Romanian prosumer rule or a lei price.

Is there free solar software for Romania?

OpenSolar says its core app is free for solar professionals. The vendor charges for API Access and supported connectors from 16 April 2026. The pages we read state no Romanian tariff or prosumer rule.

How do Romanian prosumer rules treat exported power?

Per ANRE, prosumers up to 200 kW get quantitative compensation on the invoice, and surplus can be used over up to 24 months. For 200 kW to 400 kW, suppliers buy the energy at the weighted average day-ahead market price. Read the current ANRE text before quoting a client.

Which solar software gives P50 to P90 yield results?

PVsyst has a help page on P50 to P90 evaluations. HelioScope lists P90, P95 and P99 values under its Pro plan. Aurora’s pages we read do not state a P-value output. SurgePV’s published scope lists bankable yield and financial modeling but does not state P50 to P90.

How much does solar software cost in Romania?

No vendor publishes a lei price. OpenSolar’s core app is free. PVsyst 8 Professional is 700 Swiss francs per year. HelioScope Basic is $159 per license per month, or $1,620 per year. Aurora Basic is $159 per user per month, or $135 per user per month billed annually. SurgePV lists $1,899 per user per year for one user.

About the Contributors

Author
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Editor
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Ready to Design and Propose Faster?

SurgePV covers solar design, energy-yield modeling, financial modeling, and proposals in one platform. Book a guided demo to see it on a project like yours.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.