Back to Best Solar Software
Best ListBest-Of List5 tools compared

Solar Software in Bulgaria (2026): Five Tools Compared

Five solar software tools compared on what each vendor publishes for work in Bulgaria: language, diagram output, tariff entry, price currency and yield evidence. Checked October 2026.

SurgePV publishes this list and sells solar design and proposal software, so we have a commercial interest in this category. This is a desk comparison of what each vendor publishes; we have not run side-by-side tests. Prices and vendor facts checked October 2026. How we evaluate software

Published Last updated
Rainer Neumann

Written by

Rainer Neumann

Editorial contributor · SurgePV

Keyur Rakholiya

Edited by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

A Bulgarian installer quoting a rooftop job has five questions for software: can the client read the proposal in Bulgarian, can a wiring diagram come out of the tool, can the tariff be typed in, what currency is the invoice in, and will a lender accept the yield figure. This page puts Aurora Solar, HelioScope, OpenSolar, PVsyst and SurgePV side by side on those five points, using only what each vendor publishes. None of the vendor pages names Bulgaria, so the matrix shows where you must ask for a sample.

Bulgarian is the language most Bulgarian clients will expect on a quote. OpenSolar’s proposal list, PV*SOL’s interface list and PVsyst’s interface translations all leave it out. SurgePV prices per user in US dollars and lists roof modeling, a bill of materials (a parts list) and proposals in one product.

Everything here is a desk comparison of vendor pages read in October 2026, with no hands-on trials. SurgePV publishes this page and is a vendor on this list. The one local source is a January 2023 news report on Bulgaria’s rooftop permit change, summarised in the Bulgaria rooftop rules section below. Tariffs, incentives and grid conditions are not covered; take them from your utility or the regulator. For tools outside these five, use the global list of solar design software.

Criteria used: local-language output, diagram output, tariff entry, price currency, yield evidence.

Want to see SurgePV on your own project?

Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Best-For Picks for Bulgaria

  • A quote tied to monthly per-user billing in dollars: Aurora Solar. Basic costs $159 per user per month, or $135 on annual billing. Its utility-rate help article sets an export rate and a compensation policy, which is where a Bulgarian surplus rule would go by hand.
  • Mid-size commercial roofs, carports and ground arrays that need a wiring diagram: HelioScope. Single-line diagrams and an 8760 production report (hourly output across a year) come on every plan. P90, P95 and P99 figures start on Pro.
  • A zero-cost start with Bulgarian rates typed in manually: OpenSolar. The core app is free. Its custom tariff builder takes flat, tiered and demand-charge rates, but the proposal list has 13 languages and Bulgarian is not one of them.
  • A yield report for a bank or investor: PVsyst. It documents P50 to P90 evaluations, and its interface has translations into eleven languages, none of them Bulgarian. Windows only.
  • One product from roof model to parts list and proposal: SurgePV. It is priced per user in US dollars. A demo should show a Bulgarian-language output, a tariff entry and a diagram, because its published scope names none of them.

Comparison Table

The rows run in alphabetical order, ignoring punctuation, and carry no ranking. Choose by the job in the picks above. Every price was read in October 2026 from the vendor’s own page.

Tool Best for Price Free or paid Decisive scope fact
Aurora Solar Design and sales proposals, per user Basic $159 per user per month; $135 per user per month billed annually Paid SLD editor “only available in Europe”; P50 only
HelioScope Commercial rooftop, carport and ground mount Basic $1,620 per license per year; Pro $2,640; Enterprise custom Paid, 14-day free trial Single-line diagrams on every plan; P90 on Pro
OpenSolar Free core app, proposals Core app free; API Access and connectors charged from 16 April 2026 Free core app, paid API and connectors 13 proposal languages; you translate the template
PVsyst Yield evidence CHF 700 per year (Professional) Paid, one-month trial Documents P50 to P90 evaluations; Windows only
SurgePV Roof model to BOM and proposal, per user $1,899 per user per year (1 user) Paid, guided demo BOM and proposal generation in scope

Bulgaria Criteria Matrix

Each cell reads Documented, Partial or Not stated, drawn from the vendor pages linked in the entries and under Sources and Dates. Documented means a vendor page states the item for this job. Partial means a related feature is listed but nothing Bulgarian. Not stated means silence on the pages read. No scores, no weights.

Tool Local-language output Diagram output Tariff entry Price currency Yield evidence
Aurora Solar Not stated Partial (SLD editor “only available in Europe”; Bulgaria not named) Partial (export rate and compensation settings; $ per kWh) Partial ($ sign; currency not named) Partial (P50 only; no native P90)
HelioScope Not stated Documented (single-line diagrams on every plan) Not stated (financial analysis listed on Pro) Documented (USD) Documented (P90, P95, P99 on Pro)
OpenSolar Not stated (no local language in the proposal language list) Partial (list has AU, NZ, US, CA, UK, FR, DE, IT, ES, IN; Bulgaria not in it) Partial (custom tariffs with flat, tiered and demand-charge rates; Bulgaria rates not stated) Documented (core app free) Not stated
PVsyst Not stated (no local language in the interface translations) Partial (SLD editor, “still work in progress”; grid-connected systems only) Partial (feed-in tariff and self-consumption help page) Documented (CHF) Documented
SurgePV Not stated Not stated (electrical workflow support listed) Partial (financial modeling listed) Documented (USD) Not stated (energy-yield modeling listed)

Silence on a page is not proof that a feature is missing. Hand each vendor one real Bulgarian roof, a sample utility bill and a request for a Bulgarian-language proposal, then compare what comes back.

Tool Entries

Aurora Solar

Best for: a Bulgarian design-and-sales team content to budget in dollars per seat, with the Europe-only diagram editor available to it.

Not the right choice if: a Bulgarian lender wants P90 (Aurora does not natively output P90 for solar energy production), or your finance team needs the invoice in leva. The price list shows a $ sign only, and Bulgaria sits inside the Europe-only reach of the diagram editor but is not named.

What the vendor documents: the single line diagram editor page says the editor is only available in Europe. The help article on P-values says Aurora’s estimates are P50 values from typical-year weather data. The help article on utility rates lets you set an export rate in dollars per kWh and a compensation policy.

Price (checked October 2026): on the pricing page, Basic is $159 per user per month, or $135 per user per month billed annually ($1,620 billed annually). Premium is $259 per user per month, or $220 per user per month billed annually ($2,640 billed annually). The page uses a $ sign without naming the currency.

Limitations: no Bulgarian tariff, form or grid-code item appears on the pages read, and the app language for Bulgarian proposals is unstated.

Vendor link: aurorasolar.com.

Aurora Solar public website page, captured 29 October 2026
Aurora Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

HelioScope

Best for: Bulgarian commercial and industrial designers who handle factory roofs, carports and small ground plants with storage in the same file, and who hand a single-line diagram to the grid operator.

Not the right choice if: most of your Bulgarian work is single-family rooftops, since the vendor positions HelioScope as commercial solar-plus-storage software. Plants above 5 MW (DC), single-axis trackers or a PVsyst export push you to the custom-priced Enterprise tier.

What the vendor documents: every plan includes site modeling and design, rooftop, carport, ground-mount and battery layouts, CAD export, single-line diagrams, a 50,000 component library, shade reports and an 8760 production report (pricing page). Pro adds LiDAR-assisted modeling, AI-based obstruction detection, storage modeling, financial analysis, customizable reports, sales proposals, and P90, P95 and P99 values.

Price (checked October 2026): Basic is $159 USD per license per month or $1,620 USD per license per year, for designs up to 1.25 MW (DC). Pro is $259 per license per month or $2,640 per license per year, for designs up to 5 MW (DC). Enterprise is custom per-project pricing, for designs up to 30 MW (DC). The help centre documents a 14-day free trial.

Limitations: Basic and Pro include one user per license. Nothing on the pages read covers a Bulgarian tariff, form or grid-code item, and no interface language list is published.

Vendor link: helioscope.aurorasolar.com.

HelioScope public website page, captured 29 October 2026
HelioScope public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

OpenSolar

Best for: small Bulgarian installers who want 3D design and proposals without a licence fee and are willing to translate a proposal template into Bulgarian themselves.

Not the right choice if: a lender expects documented P50 to P90 yield results, which no OpenSolar page read mentions. Extras are not free: API Access and supported connectors are charged from 16 April 2026, and Enterprise Services plans start at US$500 per month. Auto Design is labelled beta.

What the vendor documents: the proposal language article lists English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish, and says you need a manually translated proposal template. The single line diagram article says SLDs are supported in AU, NZ, US, CA, UK, FR, DE, IT, ES and IN. The tariff article shows how to create a custom tariff with flat, tiered and demand-charge rates.

Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access and supported connectors, per its 16 February 2026 post. The core app stays free.

Limitations: no Bulgarian tariff, form or grid-code item is stated, and Bulgaria is outside the single-line-diagram country list.

Vendor link: opensolar.com.

OpenSolar public website page, captured 29 October 2026
OpenSolar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVsyst

Best for: a large Bulgarian roof or a field plant where a bank or investor wants a simulation report with P50 to P90 values.

Not the right choice if: the same tool must also print a client proposal (none is described), the diagram must include storage, or the team works on Macs. The requirements page says PVsyst runs only under Windows.

What the vendor documents: a P50 to P90 evaluation. P50 and P90 are yields with a 50% and 90% probability of being exceeded in a year. The languages page says English is the reference language and lists translations into French, German, Spanish, Portuguese, Italian, Turkish, Korean, Chinese, Japanese, Polish and Russian. The documentation itself is not translated. The single line diagram page describes an editor for PV strings, inverters and transformers. It covers grid-connected systems only, leaves out storage, and calls the feature “still work in progress”. The economic evaluation help page covers feed-in tariffs and self-consumption.

Price (checked October 2026): CHF 700 per year for PVsyst 8 Professional, with grouped-order discounts of 5% for 2 to 4 licences, 15% for 5 to 9 and 20% for 10 or more. The product page offers a one-month free trial.

Limitations: documentation stays in English, no Bulgarian interface translation exists, and no Bulgarian tariff or grid-code item is named.

Vendor link: pvsyst.com.

PVsyst public website page, captured 29 October 2026
PVsyst public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV

SurgePV is our product.

Best for: Bulgarian teams that want one per-user product from roof model and shading through a bill of materials to the proposal. Ask in the demo for the Bulgarian outputs you need.

Not the right choice if: you want to self-start without a call (only a guided demo is offered), or need a lev price in writing first. The pricing page shows US dollars. Outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender or utility. SurgePV’s published product scope does not list a CRM (customer tracking tool), monitoring or ERP (business management software).

What the vendor documents: 3D roof modeling, array layout and shading analysis. It also lists energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar design software for the product page.

Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.

Limitations: results depend on source data, assumptions and equipment models. Neither the pricing page nor the published scope names a Bulgarian tariff, Bulgarian-language output, a diagram format or P50 to P90 results.

Vendor link: surgepv.com.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Bulgaria Rooftop Rules Behind the Software Question

Software outputs feed a permit process, and Bulgaria changed that process recently. Balkan Green Energy News reported in January 2023, updated August 2023, that parliament amended the territorial planning law so rooftop solar for self-consumption no longer needs a building permit or a submitted project. Before the change, the report says, becoming a prosumer could take up to a year.

  • Notification replaces the permit. The owner tells the municipality about the planned roof array. If the municipality raises no objection within 14 days, tacit consent applies, per the report.
  • Size limit. The original proposal covered systems up to 10.8 kW. Lawmakers raised the threshold to 20 kW. Larger systems are outside this simplification as the article describes it.
  • Commissioning. For technical commissioning the owner and the contractor only need to inform the authorities, the article says. It describes no separate grid-operator step, so ask the operator that serves the site what it needs.
  • Why it matters for tools. Without a project file to submit, the drawing and parts list become a sales and installation document rather than a permit filing. A client reading a Bulgarian-language proposal is then the main reason to check language support. The same report quotes an MP saying most Bulgarian installations sit on fields rather than roofs, which is why ground-mount and yield-report tools stay relevant.

The report is from 2023 and later amendments may have moved the thresholds, so read the current law text before quoting a limit to a client.

What to Ask a Vendor Before Buying

Bring one real Bulgarian roof, a sample utility bill and a client who reads Bulgarian. Ask each vendor to produce four things from it. A proposal in Bulgarian or a template you can translate. A wiring diagram suitable for the grid operator. A place to type the surplus-power rate you actually receive. An invoice in the currency your accountant uses, with VAT shown. Where a page is silent the matrix says Not stated, and the trial or demo is where you close that gap.

See SurgePV on your own project

Book a guided demo and ask for the Bulgaria items you need.

Book a Free Demo

How We Ordered These Tools

We did not rank these tools. They are listed alphabetically, ignoring punctuation, and the best-for picks come from the matrix above.

  • Local-language output: a Bulgarian client signs a quote more readily when it is in Bulgarian. Translation quality is not judged here.
  • Diagram output: the grid operator or a lender may ask for a single line diagram (a simple wiring drawing). Whether any diagram fits a Bulgarian form is not judged.
  • Tariff entry: the payback figure in a quote depends on the rate and export terms typed in. Calculation accuracy is not judged.
  • Price currency: the currency tells you what a Bulgarian buyer is invoiced and whether VAT is added. Discounts and negotiated quotes are not judged.
  • Yield evidence: a bank financing a large Bulgarian plant may want a probability-based report. Lender acceptance is not judged.

Methodology and Disclosure

SurgePV is published by SurgePV, which is also one of the vendors on this list. Its entry follows the same template and sources as the others: the vendor’s own public pages, read in October 2026. The Bulgarian language, tariff and diagram items are open questions for every vendor, SurgePV included. Where a page does not state a feature, we say Not stated.

Sources and Dates

Vendor pages were read in October 2026. Prices and features come from the vendor pages linked here and in the entries above. Each vendor page can change, so check the vendor before you buy.

The Bulgarian permit facts come from the Balkan Green Energy News report on the rooftop procedure, read in November 2026.

Go Deeper on a Category

Frequently Asked Questions

What is the best solar software in Bulgaria?

It depends on the job. No vendor page we read names Bulgaria, so pick by what each tool publishes. Aurora Solar prices per user in US dollars. HelioScope documents single-line diagrams and, on Pro, P90 values. OpenSolar’s core app is free. PVsyst documents P50 to P90 yield evidence. SurgePV lists roof modeling, bill of materials and proposals in one product.

Is there free solar software for Bulgaria?

OpenSolar says its core app is free for solar professionals. The vendor charges for API Access and supported connectors from 16 April 2026. PVsyst offers a one-month free trial and HelioScope a 14-day free trial. SurgePV offers a guided demo and no self-serve trial.

Can solar software show Bulgaria tariffs and local currency?

None of the vendors on this list states a Bulgaria tariff or a local-currency price on the pages we read. OpenSolar lets you build a custom tariff with flat, tiered and demand-charge rates. Aurora lets you edit export rates, shown in dollars per kWh. PV*SOL has feed-in and net-metering tariff data sets, and PVsyst has a feed-in and self-consumption help page. Test each tool with a sample bill from your utility before you buy.

Which solar software works in the languages used in Bulgaria?

Local languages include Bulgarian. OpenSolar lists none of them among its proposal languages. PV*SOL lists none of them among its interface languages. PVsyst lists none of them among its interface translations. Check the vendor pages for the language of the proposals and reports you need to hand to a client.

How much does solar software cost for Bulgaria installers?

Each vendor uses its own currency, and none publishes a Bulgaria price. Aurora Basic is $159 per user per month, or $135 per user per month billed annually. HelioScope Basic is $1,620 per license per year and Pro is $2,640. OpenSolar’s core app is free, with charges for API Access and connectors from 16 April 2026. PVsyst 8 Professional is 700 Swiss francs per year. SurgePV lists $1,899 per user per year for one user.

About the Contributors

Author
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Editor
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Ready to Design and Propose Faster?

SurgePV covers solar design, energy-yield modeling, financial modeling, and proposals in one platform. Book a guided demo to see it on a project like yours.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.