Back to Best Solar Software
Best ListBest-Of List4 tools compared

Solar Proposal Software in North Macedonia: 4 Tools Compared (2026)

Four solar proposal tools compared on what each vendor publishes for quotes in North Macedonia: custom tariffs, local language, PPA and lease financing, price and free tier. Checked October 2026.

SurgePV publishes this list and sells solar design and proposal software, so we have a commercial interest in this category. This is a desk comparison of what each vendor publishes; we have not run side-by-side tests. Prices and vendor facts checked October 2026. How we evaluate software

Published Last updated
Nirav Dhanani

Written by

Nirav Dhanani

Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

Installers and EPC teams selling solar in North Macedonia can compare four proposal tools below. Short answer: a free core app that takes custom tariffs with demand charges is OpenSolar, and PPA, lease or loan comparisons on commercial deals point to Energy Toolbase.

A North Macedonian quote has to carry the customer’s real tariff, including any capacity charge, and has to arrive in a language the customer reads. OpenSolar documents custom tariffs with demand charges on a free core app. Energy Toolbase lists PPA and lease financing; a PPA (power purchase agreement) means the customer pays for the power a system makes instead of buying the system. SurgePV documents roof modeling through proposals, priced per user, and states no North Macedonian tariff output. Because no vendor page we read names North Macedonia, give each one a single real bill and compare what comes back.

Everything here comes from vendor pages read in October 2026, with no side-by-side trials. Tool facts are taken from each vendor’s own site. Nothing is claimed about North Macedonian regulation, incentive programs or tariff levels, because no official source was read for this update, and the unsourced market figures in the earlier version were removed.

The matrix below scores six items: custom tariff entry, demand or capacity charge fields, Macedonian proposal language, lease or PPA financing, a US dollar price and a free tier.

Solargraf is not compared. Its site (solargraf.com) could not be opened by automated tools in October 2026, so nothing about it can be sourced.

Want to see SurgePV quote a North Macedonia project?

Book a guided demo and bring a real North Macedonia site. We walk through design, yield, finance and the proposal in one platform.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Best-For Picks for North Macedonia

  • Free core app that builds custom tariffs with demand charges: OpenSolar. Its help article covers flat, time-of-use, tiered and demand-charge rates plus fixed and minimum charges. API Access and connectors are charged from 16 April 2026, and Macedonian is not among its proposal languages.
  • Commercial customers weighing PPA, lease or loan offers: Energy Toolbase. Its FAQ lists cash, PPA, loan and lease structures, and the price is given on a demo call.
  • Tablet proposals with editable rates: Aurora Solar. Basic lists tablet-friendly sales proposals, and each project can use an edited rate or a custom rate with demand charges.
  • One product from roof model to parts list and proposal, charged per user: SurgePV. It documents roof modeling, shading, yield, financial modeling, bill of materials and proposals. Its published scope names neither a North Macedonian tariff nor a capacity charge, so raise both in a demo.

North Macedonia Solar Proposal Software Comparison Table

Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked October 2026 on each vendor’s own page, in the currency the vendor publishes.

Tool Best for Price Free or paid Decisive North Macedonia fact
Aurora Solar Tablet-friendly proposals $159 or $259 per user per month (monthly billing); $135 or $220 billed annually Paid Pricing page lists North America and Europe regions; North Macedonia not named
Energy Toolbase PPA and lease modeling for commercial deals Price given on a demo call Paid North Macedonia not named on the pages we read
OpenSolar Custom tariffs with demand charges Core app free of charge; API Access and connectors charged from 16 April 2026 Free core app, paid API and connectors 13 proposal languages; Macedonian is not on that list
SurgePV Roof model to BOM and proposal, per user $1,899 per user per year (1 user), in US dollars Paid, guided demo BOM and proposal generation in scope; no North Macedonia item stated

North Macedonia Criteria Matrix

Cells read Documented, Partial or Not stated. Documented means the vendor’s own page says it outright, Partial means the page describes a related feature without the full item, and Not stated means the pages read in October 2026 are silent. No scores or weights are applied.

Tool Custom tariff entry Demand or capacity charge fields Macedonian proposal language Lease or PPA financing US dollar price Free tier
Aurora Solar Documented (configure your own rates) Documented (help article on custom rates adds demand charges) Not stated Documented (loan, lease, PPA or cash product in Sales Mode) Partial ($ shown, currency not named) Not stated
Energy Toolbase Documented (help center: create your own custom rate schedules) Partial (FAQ: models demand charge reduction with storage) Not stated Documented (cash, PPA, loan, lease) Not published for ETB Developer (demo call) Not stated
OpenSolar Documented (custom tariff form) Documented (demand charges in the form) Partial (13 languages; Macedonian is not on that list) Partial (options depend on market and provider) Documented (core app free; paid services in US$) Documented
SurgePV Not stated Not stated Not stated Not stated Documented ($1,899 per user per year, 1 user) Not stated (guided demo)

Two points follow. No page read names a North Macedonian tariff, and the OpenSolar and Aurora help articles each describe custom rates with demand charges. A silent page does not prove a missing feature, so put one real North Macedonian bill through each tool before buying.

Tool Entries

Aurora Solar

Best for: a team in North Macedonia that wants tablet-friendly proposals and a rate database in which rates can be edited or created.

Not the right choice if: a ready-made Macedonian rate or Macedonian-language proposal is required. The pricing page and the help articles read neither name North Macedonia nor list Macedonian.

What the vendor documents: the pricing page lists 3D roof modeling, performance simulation, adders, discounts and incentives, and a utility rate database where you “configure your own rates or use rates from Genability and Aurora”. Premium adds LIDAR-assisted modeling, bankable shade reports and battery modeling. Its help article on editing rates says you can change the import rate, export rate, rate details and compensation policy for a project. Its help article on custom rates lets an admin create a rate with tiers, time-of-use periods and demand charges. Its financial analysis article says a loan, lease, PPA or cash product must be chosen in Sales Mode.

Price (checked October 2026): Basic $159 per user per month billed monthly, or $135 per user per month billed annually ($1,620 billed annually); Premium $259 per user per month, or $220 billed annually ($2,640 billed annually). Enterprise is custom, per project. The page shows “$” and does not name the currency.

Limitations: the pricing page names North America and Europe regions but not North Macedonia, and no North Macedonian rate appears in the articles read.

Vendor link: aurorasolar.com.

Aurora Solar public website page, captured 29 October 2026
Aurora Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Energy Toolbase

Best for: developers building PPA, lease or loan offers with storage for commercial customers in North Macedonia.

Not the right choice if: a posted price matters, or North Macedonia has to be named on the vendor’s pages. The pricing page has you book 30 minutes and receive the demo and pricing on the call.

What the vendor documents: its ETB Developer FAQ says the platform supports cash purchases, power purchase agreements, loans and leases. It says the platform has a built-in database of utility rates, incentives and tariffs, and that it models demand charge reduction with battery storage. It also says ETB Developer is web-based. The product page counts 120,000+ tracked utility rates and describes a fully custom proposal template builder.

Price (checked October 2026): no ETB Developer figure is published on the pricing page. The page also lists implementation and support packages with no price.

Limitations: neither North Macedonia nor the countries the rate database covers are named on the pages read. Its rate schedules help page says users can create custom rate schedules, and that its rates database spans 50 states and 42 international territories.

Vendor link: energytoolbase.com.

Energy Toolbase public website page, captured 29 October 2026
Energy Toolbase public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

OpenSolar

Best for: a small North Macedonian installer on a free core app who must enter a custom tariff with demand charges.

Not the right choice if: the customer expects a Macedonian proposal. The language article lists 13 supported languages, and Macedonian is not one.

What the vendor documents: its tariff article says you can create a custom tariff with a tariff type and compensation mechanism. The rate structures are flat, time-of-use, tiered and demand charges. You can add fixed and minimum charges. Its integrated finance page says the options depend on your market and provider, and may include loans, leases, PPAs and third-party ownership.

Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access, which lets other software connect to OpenSolar, and for supported connectors. This comes from its 16 February 2026 post.

Limitations: a North Macedonian tariff must be built by hand in the form, since no such tariff is named on the pages read.

Vendor link: opensolar.com.

OpenSolar public website page, captured 29 October 2026
OpenSolar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV

SurgePV is our product, so read this entry with that in mind.

Best for: teams that want roof modeling, shading, yield and financial modeling in one product, with bill of materials (the parts list) and proposals charged per user, and that check the North Macedonian items in a demo.

Not the right choice if: a self-serve trial is needed (SurgePV offers a guided demo), or a custom tariff form, demand charge fields or Macedonian text must be confirmed before talking to sales, since the published scope states none of them. Outputs support design and documentation, and the responsible engineer, authority, lender or utility still approves. The scope lists no CRM (a tool to track customers and sales), and monitoring and ERP (business management software) are outside it. OpenSolar documents a custom tariff form that SurgePV’s published scope does not.

What the vendor documents: 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar proposal software for the product page.

Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.

Limitations: results rest on source data, assumptions and equipment models. The published scope states no tariff form, capacity charge field, Macedonian text or PPA modeling.

Vendor link: surgepv.com.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

What North Macedonian Support Data and Connection Costs Mean for a Quote

How support has worked. The regulator’s renewable energy sector page reports 2021 data. It says a preferential (feed-in) tariff was introduced in 2007, with the first plants selling under it from 2010, and that the 2018 Energy Law added a premium paid on top of the market price, with producers chosen by an auction run by the Ministry of Economy. In 2021 the page counts 220 solar plants with 45 MW and about 51 GWh. Of them 101 used preferential tariffs and 121 sold on the market, which it calls the first year more PV plants sold on the market than under preferential tariffs. It also lists 48 new PV plants starting in 2021, and says 135 of 344 renewable producers used no support measure. The page uses the terms domestic producer and preferential producer, not prosumer, and it holds 2021 figures, so treat it as a sign of direction and not as a current rate card.

The law has been amended. The regulator’s decision of 15 June 2026 cites the Law on Energy as published in Official Gazette 101/25 and 135/25. A quote that cites an older law should be rechecked against those texts.

Connection cost can be a separate line. In the same decision, Elektrodistribucija priced a non-standard connection outside an urban plan at 148,774 denars without VAT (175,553 with VAT) for each request. The operator’s calculation rested on a low-voltage network upgrade specification of 1,085,838 denars without VAT, shared by requested capacity, plus a real-cost specification of 14,554 denars paid in full by the applicant. The regulator rejected the applicant’s objection to the amount. That case was eleven weekend houses and not solar plants, so the figure is an example of how the operator builds a price, not a rate for PV. A quote for a site outside a planned area should carry a line for connection cost that the operator sets, and should not assume it is zero.

Yield assumption. PVGIS for Skopje (41.998 N, 21.428 E, 247 m; 1 kWp, fixed, 35 degrees, facing south, 14% losses, 2005 to 2023 data) gives 1,346 kWh a year, with a year-to-year standard deviation of 50.5 kWh. November to February give 21.9% of the annual figure. Show the monthly profile and the range, not one annual number.

For the market view see Best Solar Software for North Macedonia, for the connection and design side see Best Solar Design Software for North Macedonia, and for features see Best Solar Proposal Software.

What to Ask a Vendor Before Buying

Give each vendor one real North Macedonian electricity bill and ask for a sample proposal built from it. Look for four things. A way to enter the tariff and any fixed or capacity charge. Macedonian output, if your customer needs it. Financing that matches how your customers pay. A price in the currency you are invoiced in. The matrix flags every item a vendor leaves unpublished, and a demo settles it. Permit and grid-connection rules for North Macedonia sit with its authorities, because the vendor pages do not cover them.

How We Ordered These Tools

Methodology: alphabetical order, no ranking, with the best-for picks drawn from the matrix above. SurgePV publishes this page and is one of the vendors on the list, held to the same rules as the others and not placed first.

  • Custom tariff entry: a North Macedonian bill rarely fits a US rate shape. How well a tool models an entered tariff was not assessed.
  • Demand or capacity charge fields: bigger customers may pay by capacity as well as by energy. No tool’s math was assessed.
  • Macedonian proposal language: many buyers want the proposal in their own language. Translation quality was not assessed.
  • Lease or PPA financing: commercial buyers often weigh buying against paying for the power. Whether any tool models a North Macedonian deal was not assessed.
  • US dollar price: a posted price helps you budget before a call. Discounts and negotiated quotes were not assessed.
  • Free tier: a free plan lets a small team try the workflow. Limits beyond what the page states were not assessed.

Sources and Dates

Vendor pages were read in October 2026 and the headline prices were rechecked on 3 November 2026. They are Aurora (pricing and three help articles), Energy Toolbase (pricing, FAQ and product page), OpenSolar (free page, 16 February 2026 post, and the tariff, language and finance pages linked above) and SurgePV (pricing). Screenshots are captures of each vendor’s public website from 29 October 2026.

North Macedonia support and connection facts were read in November 2026 from the Energy Regulatory Commission: its renewable energy sector page (2021 data) and a decision of 15 June 2026. The yield figure comes from PVGIS for Skopje.

See SurgePV on your North Macedonia project

Book a guided demo and ask how it handles a North Macedonia tariff and capacity charge.

Book a Free Demo

More Solar Software Guides to Compare

Frequently Asked Questions

What is the best solar proposal software in North Macedonia?

It depends on the job. OpenSolar documents custom tariffs with demand charges, and its core app is free. Energy Toolbase lists PPA and lease financing. Aurora Solar lists tablet-friendly proposals. SurgePV documents roof modeling through proposals but states no North Macedonia output. No tool here names North Macedonia on the pages we read, so ask each vendor to model one real North Macedonia electricity bill.

Can proposal software handle electricity tariffs in North Macedonia?

OpenSolar and Aurora Solar help articles describe custom rates with demand charges, and OpenSolar lists flat, time-of-use and tiered rates too. Energy Toolbase’s help center says users can create custom rate schedules. None of these pages names a North Macedonia tariff, so enter the rate from the customer’s bill and check the result.

Is there free solar proposal software for North Macedonia?

OpenSolar says its core app is free for solar professionals. From 16 April 2026 it charges for API Access and supported connectors. The other tools here are paid or priced on request.

Does solar proposal software support Macedonian proposals?

OpenSolar lists 13 proposal languages: English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish. For North Macedonia, Macedonian is not on that list. The Aurora, Energy Toolbase and SurgePV pages we read do not list proposal languages for North Macedonia. Ask each vendor if you must send proposals in Macedonian.

How much does solar proposal software cost for an installer in North Macedonia?

Prices are in US dollars, as each vendor shows them. OpenSolar’s core app is free. Aurora lists $159 per user per month for Basic billed monthly, or $135 per user per month billed annually. SurgePV lists $1,899 per user per year for one user. Energy Toolbase gives its price on a demo call.

About the Contributors

Author
Nirav Dhanani
Nirav Dhanani

Co-Founder · SurgePV

Nirav Dhanani is identified by SurgePV as a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, conversion results, and market-expansion claims are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Ready to Design and Propose Faster?

SurgePV covers solar design, energy-yield modeling, financial modeling, and proposals in one platform. Book a guided demo to see it on a project like yours.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.