Back to Best Solar Software
Best ListBest-Of List5 tools compared

Solar Software in North Macedonia (2026): Five Tools Compared

Five solar software tools compared on what each vendor publishes for rooftop work in North Macedonia: a single line diagram, net metering settings, weather data and euro prices. Checked October 2026.

SurgePV publishes this list and sells solar design and proposal software, so we have a commercial interest in this category. This is a desk comparison of what each vendor publishes; we have not run side-by-side tests. Prices and vendor facts checked October 2026. How we evaluate software

Published Last updated
Rainer Neumann

Written by

Rainer Neumann

Editorial contributor · SurgePV

Keyur Rakholiya

Edited by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

This page is for installers and EPCs quoting rooftop solar in North Macedonia. Short answer: PV*SOL premium for a euro price and a generated circuit diagram, or PVsyst for a single line diagram with P50 to P90 yield figures.

Start with the grid company, not the software. In North Macedonia, you ask Elektrodistribucija for a connection approval when you add a solar system to its grid. Its leaflet lists a single-line electrical scheme and a basic design for the plant among the documents. So pick a tool by the drawing it gives you, then by weather data, net metering settings and price. From what the vendors publish, PV*SOL premium has a euro price, weather data for any location worldwide and a generated circuit diagram. PVsyst documents a single line diagram (SLD, a simple drawing of how the system is wired) and P50 to P90 yield figures. P50 is a yield expected to be met or exceeded in 50% of years, and P90 in 90% of years. OpenSolar’s core app and Sunny Design are free. SurgePV lists roof modeling, shading, yield, financial modeling, bill of materials (a parts list) and proposals in one product, priced per user.

This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side tests. SurgePV publishes this page and is one of the tools on it. Local facts come from Elektrodistribucija, the Ministry of Energy, Mining and Mineral Resources and a government draft law. Tool facts come from each vendor’s own site.

Criteria used: single line diagram, Macedonian interface, weather data for your site, net metering or net billing settings, price currency, P50 to P90 yield figures.

Quoting solar in North Macedonia? See SurgePV on your project

Book a guided demo and bring a real site. Ask which outputs you need for North Macedonia, such as the single line scheme.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Best-For Picks for North Macedonia

  • A euro price list, 3D shading and a 30-day trial: PV*SOL premium. It shows EUR 845.00 plus VAT per named user for one year. It runs on Windows 10 and 11 only.
  • A free tool for a small rooftop: OpenSolar or Sunny Design. OpenSolar’s core app is free and generates an SLD. API Access and connectors are charged from 16 April 2026. Sunny Design is free and runs in a web browser or on a tablet. Neither page we read names North Macedonia.
  • Yield evidence for a larger project: PVsyst. Its documentation describes P50 to P90 evaluations and an SLD editor. The pages we read describe no proposal output.
  • A tariff you can model yourself: PV*SOL premium or OpenSolar. PV*SOL has a help page on net-metering tariff data sets. OpenSolar explains how to create a custom tariff. Neither names Macedonian rates.
  • Roof model to bill of materials and proposal in one product, priced per user: SurgePV. Ask in a demo whether it can print an SLD for an Elektrodistribucija application. Also ask for a euro quote. Its published scope states neither.

Comparison Table

Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked October 2026 on each vendor’s own page.

Tool Best for Price Free or paid Decisive scope fact
OpenSolar Free core app and SLD Core app free; API Access and connectors charged from 16 April 2026 Free core app, paid API and connectors North Macedonia is not on either SLD template list
PV*SOL premium Euro price, 3D shading EUR 845.00 per named user per year, plus VAT Paid, 30-day trial Circuit diagram and Meteonorm 9 weather data; Windows only
PVsyst Yield evidence CHF 700 per year (Professional) Paid, one-month trial P50 to P90; SLD for grid-connected systems; Windows only
Sunny Design Free planning in a browser Free; Sunny Design PRO 600 € per year (net) Free and paid SMA’s own tool; circuit diagram download in release 5.70
SurgePV Roof model to BOM and proposal, per user $1,899 per user per year (1 user) Paid, guided demo BOM and proposal generation in scope; no Macedonian output stated

North Macedonia Criteria Matrix

Each cell is Documented, Partial or Not stated, based on the vendor pages we read in October 2026. We list them under Sources and Dates. Documented means the page states it for this task. Partial means the page lists a related feature but not the Macedonian item. Not stated means the pages we read do not mention it. It may exist elsewhere. There are no scores or weights.

Tool Single line diagram Macedonian interface Weather data for your site Net metering or net billing settings Price currency P50 to P90
OpenSolar Partial (SLD generator; North Macedonia not listed) Not stated (13 proposal languages, none Macedonian) Partial (TMY weather data; place coverage not stated) Partial (custom tariffs) Partial (core app free; no euro price) Not stated
PV*SOL premium Partial (circuit diagram; Macedonian format not stated) Not stated (nine interface languages, none Macedonian) Documented (Meteonorm 9, any location worldwide) Partial (net-metering tariff data sets, feed-in tariff database) Documented (EUR, plus VAT) Partial (P50 and P90 topic, full feed-in only)
PVsyst Partial (SLD for grid-connected systems; storage not included) Not stated (12 program languages, none Macedonian) Documented (map location, seven databases, own files) Partial (feed-in tariff and self-consumption help) Documented (CHF; no euro price) Documented
Sunny Design Partial (circuit diagram download, release 5.70) Not stated (no language list on the page) Documented (location worldwide, nearest data set) Partial (net-metering note in release 5.10, tariff management listed) Documented (EUR for PRO; base tool free) Not stated
SurgePV Not stated (electrical workflow support listed) Not stated Not stated (shading analysis and energy-yield modeling listed) Partial (financial modeling listed) Documented (USD) Not stated

Two things stand out. No vendor page we read mentions Elektrodistribucija, Macedonian net metering or a Macedonian interface. The tools differ most on price currency, diagrams and P50 to P90 figures.

Tool Entries

OpenSolar

Best for: small installers who want a free core app with proposals and a generated SLD. Check the drawing against what Elektrodistribucija asks for.

Not the right choice if: you need a diagram template that lists North Macedonia (neither page we read does), a euro price, or documented P50 to P90 figures.

What the vendor documents: its SLD page lists “Region-specific templates for AU, US, UK, DE, IT, ES”. Its help article lists ten countries and does not list North Macedonia either. The tariff article explains how to create a custom tariff. The output article says the default calculator uses PVWatts Version 6 and hourly TMY weather data. TMY means typical meteorological year, a standard year of weather data. The proposal language article lists 13 languages. Macedonian is not one of them.

Price (checked October 2026): the core app is free for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access and supported connectors. Source: its 16 February 2026 post.

Limitations: the pages we read state no P50 to P90 figures and no Macedonian net metering rules. The two SLD pages disagree on the template list, so confirm with the vendor.

Vendor link: opensolar.com.

OpenSolar public website page, captured 29 October 2026
OpenSolar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PV*SOL premium

Best for: designers who want a euro-priced named-user licence with 3D shading, a generated circuit diagram and a tariff database.

Not the right choice if: you work on a Mac or in a browser (the system requirements list Windows 10 and 11), or you need a Macedonian interface.

What the vendor documents: on the product page, 3D visualisation and shading analysis, and “fully customizable circuit diagrams, including safety components”. It says weather data comes from Meteonorm 9 “for any location worldwide”. It lists a 20-year financial analysis that uses a feed-in tariff database. The interface comes in German, English, Spanish, French, Italian, Polish, Czech, Portuguese and Turkish. The help centre has a net-metering tariffs page and a Bankability (P50, P90) topic.

Price (checked October 2026): EUR 845.00 plus VAT (value-added tax) for a named-user licence, one year. The vendor’s trial page offers a 30-day free trial with report printing and saving turned off.

Limitations: the Bankability topic says P50 is the default and P90 is a choice for the profitability calculation. It says this relates only to full feed-in. The pages we read name no Macedonian form or tariff.

Vendor link: valentin-software.com.

PV*SOL premium public website page, captured 29 October 2026
PV*SOL premium public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVsyst

Best for: yield evidence on projects above household size, such as a factory roof, where a lender, investor or insurer may want a simulation report.

Not the right choice if: you need quotations and proposals from the same tool (the pages we read describe none), or you work on a Mac or in a browser. The requirements page says PVsyst runs only under Windows.

What the vendor documents: the product page lists 12 program languages, and Macedonian is not one of them. It lists on-board mapping and automatic import of weather data from Meteonorm 9, NASA-Power, PVGIS-TMY, NLR/NSRDB TMY, Solcast TMY, Solar Anywhere TGY and Solargis. The single line diagram help page describes an editor and viewer for grid-connected systems only. It says the feature is “still work in progress”. The P50 to P90 page says annual production has a 50% chance of exceeding the P50 value and a 90% chance of exceeding the P90 value.

Price (checked October 2026): CHF 700 per year for PVsyst 8 Professional, with grouped-order discounts of 5% for 2 to 4 licences, 15% for 5 to 9 and 20% for 10 or more. The product page offers a one-month free trial. No euro price is published.

Limitations: the pages we read do not mention Macedonian forms or tariffs. The economic evaluation help page covers a fixed feed-in tariff and self-consumption economics, not net metering.

Vendor link: pvsyst.com.

PVsyst public website page, captured 29 October 2026
PVsyst public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Sunny Design

Best for: a free browser or tablet planner for a small system, if you already plan around SMA equipment.

Not the right choice if: you need P50 to P90 figures or a proposal tool. SMA sells inverters. Its release notes list SMA inverter models. The pages we read do not say whether you can choose other makers’ inverters.

What the vendor documents: the product page says you can use Sunny Design free of charge, in a web browser or on an iPad or Android tablet. It lists “Choice of location worldwide” and import of your own meteorological data and load profiles. Release 5.70 notes a downloadable “schematic circuit diagram” from the modules to the grid connection. Release 5.10 notes “Net-Metering for standard PV projects”. The page lists no interface languages beyond a “Russian User interface” in the release 5.00 notes.

Price (checked October 2026): Sunny Design is free of charge. Sunny Design PRO lists a price of 600 € per year (net) in the page’s function table, with a month-long free trial.

Limitations: the pages we read do not mention P50 to P90 figures or Macedonian tariffs.

Vendor link: sma.de.

Sunny Design public website page, captured 3 November 2026
Sunny Design public website capture, captured 3 November 2026. This shows the vendor's website, not a test inside the software.

SurgePV

SurgePV is our product.

Best for: teams that want roof modeling, shading, yield, financial modeling, bill of materials and proposals in one product, priced per user. Confirm Macedonian outputs in a demo.

Not the right choice if: you want a self-serve trial (SurgePV offers a guided demo). It is also not right if you need a euro price in writing before talking to sales. Ask for a quote, because the price we can state is in US dollars. Another case is a free tool for small jobs, where OpenSolar’s core app and Sunny Design are free. Outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender or utility. SurgePV’s published product scope does not list a CRM (customer tracking tool). It is not a monitoring or ERP (business management software) product.

What the vendor documents: 3D roof modeling, array layout and shading analysis. It also lists energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar design software for the product page.

Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.

Limitations: results depend on source data, assumptions and equipment models. The published scope does not state an SLD, P50 to P90 figures, a Macedonian interface or Macedonian tariffs.

Vendor link: surgepv.com.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Macedonian Rules That Shape the Choice

Connection approval. Elektrodistribucija DOOEL lists eight cases where you need its Connection Approval. Three matter here. The first is “new renewable sources generator units for personal use or for sale”. The second is installing an energy storage device. The third is an increase of the approved maximal simultaneous power. It describes itself as part of the EVN Group. You apply on its electronic platform.

Documents. The company’s leaflet of needed documents is in Macedonian. We read it in October 2026, and it has no date. For a new meter point with a renewable generating unit, it lists these items.

  • An extract from the Central Registry, for legal persons.
  • A building permit or a legalization decision.
  • A property sheet of the parcel.
  • An extract from the plan, issued by the municipality.
  • A single-line electrical scheme.
  • A basic design for the production plant.
  • A decision on placing the generating unit, and the owners’ contract or consent. These two apply only if the building has more than one owner.

For a solar plant on an existing meter, the leaflet lists the Central Registry extract, the property sheet, the single-line scheme, the basic design and the two multi-owner items. A tool’s SLD may help with the scheme. We found no vendor that says its drawing matches this leaflet.

The new law. The Ministry of Energy, Mining and Mineral Resources announced on 30 June 2026 that the new Law on the Use of Energy from Renewable Sources was adopted. It says the law regulates net metering and net billing for the first time. It also has a chapter on the status of the consumer-producer. A law firm reports that it was published in Official Gazette no. 146/2026. It says the law took effect on 10 July 2026 (BDK Advokati). We could not find the published text of the adopted law. So we read a draft of the law on a government portal. The draft has no date, and the final text may differ.

What the draft says. In Article 68 of the draft, net metering applied to plants up to 16 kW. Net billing applied from 16 kW up to 50 kW. A commercial supply scheme applied above 50 kW. Under net metering, extra power you send to the grid is carried forward as an energy deposit. The supplier makes a final calculation by 1 April for the previous 12 months. Any leftover surplus is paid at an agreed price, with no extra network fees. Under net billing, the extra power becomes a money deposit worth the agreed price minus 5%. Article 19 of the draft proposed a simpler connection process for plants of 10.8 kW or less. Ask Elektrodistribucija for the limits in force before you size a system.

Who to ask. Start with Elektrodistribucija’s page for distributed producers. It says investors in renewable generation can use the preferential tariff laid down by the Energy Regulatory Commission. They must first get the needed licences and approvals and connect to its grid. We did not check how this fits the new law. The Regulatory Commission for Energy, Water Services and Municipal Waste Management Services has its own site at erc.org.mk. MEPSO states its mission as reliable transmission of electricity and efficient management of the electricity transmission system.

Language and currency. The leaflet and the draft law are in Macedonian. The Ministry statement we cite is in English. No tool page we read lists a Macedonian interface. Vendors publish USD, EUR and CHF prices, and none shows a denar price on the pages we read. We did not review North Macedonian building rules or electrical standards. Ask Elektrodistribucija which drawings it accepts.

What to Ask a Vendor Before Buying

Ask each vendor for one sample project. Then look for these items. First, the single-line scheme you would attach to the application. Second, a way to enter the tariff and the net metering or net billing rules your supplier applies. Third, weather data for your town. Fourth, a price in the currency you will pay. Fifth, P50 to P90 figures, if a lender will read your report. Where a vendor does not publish a feature on the pages we read, the matrix says so. A demo or trial is the place to confirm it.

How We Ordered These Tools

We did not rank these tools. They are listed alphabetically, and the best-for picks come from the matrix above.

  • Single line diagram: Elektrodistribucija lists a single-line electrical scheme among its documents. We did not assess whether any tool’s diagram meets its format.
  • Macedonian interface: local paperwork is in Macedonian, so a Macedonian screen could help a team. We found none, and we did not assess translation quality.
  • Weather data for your site: yield starts from weather data. We did not check any vendor’s coverage of Macedonian towns.
  • Net metering or net billing settings: the new law regulates both. We did not assess whether any tool models the Macedonian rules.
  • Price currency: the currency shows what a Macedonian buyer will pay and whether VAT is added. We did not assess discounts or negotiated quotes.
  • P50 to P90 figures: larger projects may need a report that a lender or insurer will read. We did not assess acceptance by any Macedonian lender.

Sources and Dates

Vendor pages were read in October 2026. OpenSolar (free, diagrams). PV*SOL (premium, trial). PVsyst (shop, weather data). Sunny Design (product page). SurgePV (pricing). Local sources are the Elektrodistribucija connection page and document leaflet, the Ministry of Energy statement of 30 June 2026, the draft law on the government portal and the BDK Advokati note. All are linked above and were read in October 2026. The Official Gazette text of the adopted law was not available to us.

See SurgePV on your own project

Book a guided demo and ask for the outputs you need for North Macedonia.

Book a Free Demo

Go Deeper on a Category

Frequently Asked Questions

What is the best solar software for North Macedonia?

It depends on the job. From what the vendors publish, PV*SOL premium has a euro price, weather data for any location worldwide and a generated circuit diagram. PVsyst documents P50 to P90 yield figures and a single line diagram (SLD, a simple drawing of how the system is wired). OpenSolar’s core app and Sunny Design are free. SurgePV lists roof modeling, shading, yield, financial modeling, bill of materials and proposals in one product, priced per user in US dollars. No vendor page we read mentions Elektrodistribucija or Macedonian law.

What documents does Elektrodistribucija ask for to connect a rooftop solar system?

Its leaflet on needed documents is in Macedonian. For a consumer-producer, it lists a single-line electrical scheme and a basic design for the production plant. It also lists a property sheet of the parcel and an extract from the Central Registry for legal persons. A building permit or legalization decision is listed for a new meter point. If the building has more than one owner, it also asks for the generating unit placement decision and the owners’ contract or consent. Check the current leaflet before you apply.

What are the net metering limits in North Macedonia?

We could not confirm the final limits. The new Law on the Use of Energy from Renewable Sources was adopted on 30 June 2026. It regulates net metering and net billing for the first time. In the draft we read, net metering applied up to 16 kW. Net billing applied from 16 kW to 50 kW. A commercial supply scheme applied above 50 kW. Ask Elektrodistribucija or the Ministry of Energy for the figures in force.

Does any solar software support the Macedonian language?

None of the language lists we read includes Macedonian. PVsyst lists 12 program languages. PV*SOL premium lists nine interface languages. OpenSolar lists 13 proposal languages. The Sunny Design page lists no languages. SurgePV’s published product scope lists none. Plan to work in English, and write the Macedonian paperwork yourself.

How much does solar software cost in North Macedonia?

Vendors publish prices in different currencies, and none of the pages we read shows denar. PV*SOL premium is 845 euro plus VAT (value-added tax) per named user per year. Sunny Design PRO lists 600 euro per year, net. PVsyst Professional is 700 Swiss francs per year. OpenSolar’s core app and the base Sunny Design are free. SurgePV lists 1,899 US dollars per user per year for one user.

Is free solar software enough for a small rooftop in North Macedonia?

It can be for layout and a first estimate. OpenSolar’s core app is free and makes a single line diagram, but neither of its diagram pages lists North Macedonia. Sunny Design is free and offers a downloadable circuit diagram, but it is SMA’s tool, and SMA sells inverters. Elektrodistribucija asks for a single-line scheme and a basic design, so check what it accepts before you rely on a tool’s drawing.

About the Contributors

Author
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Editor
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Ready to Design and Propose Faster?

SurgePV covers solar design, energy-yield modeling, financial modeling, and proposals in one platform. Book a guided demo to see it on a project like yours.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.