Moldovan installers and EPC teams picking quote software get four entries below, sorted by job. OpenSolar suits custom tariffs with demand charges on a free core app. Energy Toolbase suits PPA, lease or loan comparisons on commercial deals.
A Moldova quote has to carry the buyer’s actual tariff, any capacity charge and wording in a language they read. OpenSolar documents demand-charge tariffs on a free core app, though Romanian is not on its proposal language list. Energy Toolbase lists PPA and lease financing (in a PPA, the customer pays for the power a system makes and does not buy the system). SurgePV documents roof modeling through proposals at a per-user price, with no Moldova tariff output stated. No vendor names Moldova on the pages read, so give each a real Moldova bill to model.
Method: a desk read of vendor pages in October 2026, with no side-by-side trials. No claim is made about Moldova regulation, incentive programs or tariff levels, since no official body supplied them for this update, and the unsourced market figures from the earlier version of this page were removed.
The matrix holds six items: custom tariff entry, demand or capacity charge fields, Romanian proposals, lease or PPA financing, a US dollar price and a free tier.
Solargraf is left out of the comparison. Automated tools could not read solargraf.com in October 2026, so nothing about it can be sourced.
Want to see SurgePV quote a Moldova project?
Book a guided demo and bring a real Moldova site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Moldova
- Custom tariffs with demand charges, on a free core app: OpenSolar. Its help article lists flat, time-of-use, tiered and demand-charge rates, plus fixed and minimum charges. The core app costs nothing, while API Access and connectors are charged from 16 April 2026. Romanian is missing from its language list.
- PPA, lease or loan comparisons on commercial deals: Energy Toolbase. The FAQ lists cash, PPA, loan and lease structures, and price is given on a demo call.
- Tablet-friendly proposals: Aurora Solar. Basic lists tablet proposals, an editable rate on each project, and custom rates with demand charges.
- Roof model to bill of materials and proposal in one per-user product: SurgePV. Roof modeling, shading, yield, financial modeling, bill of materials and proposals are documented. Ask in a demo how a Moldova tariff and a capacity charge are handled; the published scope names neither.
Moldova Solar Proposal Software Comparison Table
Alphabetical, not ranked: choose by the job in the list above. Prices were read in October 2026 on each vendor’s own page, in the currency shown there.
| Tool | Best for | Price | Free or paid | Decisive Moldova fact |
|---|---|---|---|---|
| Aurora Solar | Tablet-friendly proposals | $159 or $259 per user per month (monthly billing); $135 or $220 billed annually | Paid | Pricing page lists North America and Europe regions; Moldova not named |
| Energy Toolbase | PPA and lease modeling for commercial deals | Price given on a demo call | Paid | Moldova not named on the pages we read |
| OpenSolar | Custom tariffs with demand charges | Core app free of charge; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | 13 proposal languages; Romanian is not on that list |
| SurgePV | Roof model to BOM and proposal, per user | $1,899 per user per year (1 user), in US dollars | Paid, guided demo | BOM and proposal generation in scope; no Moldova item stated |
Moldova Criteria Matrix
Each cell reads Documented, Partial or Not stated. Documented means the vendor’s page says it outright. Partial means a related feature is stated. Not stated means the October 2026 pages are silent. No scores or weights.
| Tool | Custom tariff entry | Demand or capacity charge fields | Romanian proposal language | Lease or PPA financing | US dollar price | Free tier |
|---|---|---|---|---|---|---|
| Aurora Solar | Documented (configure your own rates) | Documented (help article on custom rates adds demand charges) | Not stated | Documented (loan, lease, PPA or cash product in Sales Mode) | Partial ($ shown, currency not named) | Not stated |
| Energy Toolbase | Documented (help center: create your own custom rate schedules) | Partial (FAQ: models demand charge reduction with storage) | Not stated | Documented (cash, PPA, loan, lease) | Not published for ETB Developer (demo call) | Not stated |
| OpenSolar | Documented (custom tariff form) | Documented (demand charges in the form) | Partial (13 languages; Romanian is not on that list) | Partial (options depend on market and provider) | Documented (core app free; paid services in US$) | Documented |
| SurgePV | Not stated | Not stated | Not stated | Not stated | Documented ($1,899 per user per year, 1 user) | Not stated (guided demo) |
Two points stand out. No page read names a Moldova tariff, while the OpenSolar and Aurora help articles each describe custom rates with demand charges. A tool that is silent may still support the item, so run one real Moldova bill through each before buying.
Tool Entries
Aurora Solar
Best for: teams that want tablet proposals and a rate database where rates can be edited or created.
Not the right choice if: a Moldova rate has to be preloaded, or proposals must be in Romanian. The pricing page and the help articles name neither Moldova nor Romanian.
What the vendor documents: the pricing page lists 3D roof modeling, performance simulation, adders, discounts and incentives, and a utility rate database where you “configure your own rates or use rates from Genability and Aurora”. Premium adds LIDAR-assisted modeling, bankable shade reports and battery modeling. Its help article on editing rates says you can change the import rate, export rate, rate details and compensation policy for a project. Its help article on custom rates lets an admin create a rate with tiers, time-of-use periods and demand charges. Its financial analysis article says a loan, lease, PPA or cash product must be chosen in Sales Mode.
Price (checked October 2026): Basic $159 per user per month billed monthly, or $135 per user per month billed annually ($1,620 billed annually); Premium $259 per user per month, or $220 billed annually ($2,640 billed annually). Enterprise is custom, per project. The page shows “$” and does not name the currency.
Limitations: the pricing page shows North America and Europe regions without Moldova, and no Moldova rate appears in the pages read.
Vendor link: aurorasolar.com.

Energy Toolbase
Best for: developers modeling PPA, lease or loan offers with storage for commercial customers.
Not the right choice if: a published price or a named Moldova market is needed. The pricing page describes a 30-minute booking that brings a demo and pricing.
What the vendor documents: its ETB Developer FAQ says the platform supports cash purchases, power purchase agreements, loans and leases. It says the platform has a built-in database of utility rates, incentives and tariffs, and that it models demand charge reduction with battery storage. It also says ETB Developer is web-based. The product page counts 120,000+ tracked utility rates and describes a fully custom proposal template builder.
Price (checked October 2026): no ETB Developer figure is published on the pricing page. The page also lists implementation and support packages with no price.
Limitations: Moldova is not named on the pages read, and neither is the country list of the rate database. The rate schedules help page says users can create custom rate schedules and that the database spans 50 states and 42 international territories.
Vendor link: energytoolbase.com.

OpenSolar
Best for: installers who want a free core app and a custom tariff form with demand charges.
Not the right choice if: proposals must go out in Romanian. The language article lists 13 supported languages, and Romanian is not one of them.
What the vendor documents: its tariff article says you can create a custom tariff with a tariff type and compensation mechanism. The rate structures are flat, time-of-use, tiered and demand charges. You can add fixed and minimum charges. Its integrated finance page says the options depend on your market and provider, and may include loans, leases, PPAs and third-party ownership.
Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access, which lets other software connect to OpenSolar, and for supported connectors. This comes from its 16 February 2026 post.
Limitations: a Moldova tariff has to be built by hand, and no page read names one.
Vendor link: opensolar.com.

SurgePV
SurgePV is our product.
Best for: teams that want roof modeling, shading, yield and financial modeling with a bill of materials (the parts list) and proposals, at a per-user price, and will check the Moldova items in a demo.
Not the right choice if: a self-serve trial is required (SurgePV runs a guided demo), or a custom tariff form, demand charge fields or Romanian output must be in writing before a sales call. The published scope states none of them. Outputs support design and documentation and do not replace approval by the responsible engineer, authority, lender or utility. A CRM (customer and sales tracking tool) is not in the published scope, and monitoring and ERP (business management software) are outside it. OpenSolar documents a custom tariff form that SurgePV’s published scope does not.
What the vendor documents: 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar proposal software for the product page.
Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.
Limitations: outputs depend on source data, assumptions and equipment models. The published scope names no tariff form, capacity charge field, Romanian or PPA modeling.
Vendor link: surgepv.com.

What Chisinau Irradiation Data Means for a Moldovan Quote
A Moldovan quote starts from a yield figure and a monthly shape. PVGIS for Chisinau (47.010 N, 28.860 E, 44 m) was read in November 2026 for a 1 kWp crystalline silicon system with 14% losses, using PVGIS-SARAH3 data for 2005 to 2023.
- 35 degrees, facing south: 1,215 kWh a year. December gives 39.0 kWh and July 149.9 kWh, a ratio of 3.9 to 1. November to February give 15.7% of the year.
- 15 degrees, facing south: 1,153 kWh a year, 5.2% lower. December falls to 29.6 kWh, 23.9% below the steeper layout, while July rises 3.9% to 155.7 kWh.
- Year-to-year spread: PVGIS reports a standard deviation of 47.6 kWh at 35 degrees, about 3.9% of the annual figure.
What this means for a quote:
- Show a range. A single annual number hides the spread between years. State the reference figure and the standard deviation, so a customer who sees a weaker year is not surprised.
- Show winter honestly. Chisinau’s December output is about a quarter of its July output at 35 degrees and about a fifth at 15 degrees. A customer who expects bills to fall evenly through the year will be wrong, and the quote should include a monthly chart.
- Flat-roof racks trade seasons. A shallow tilt costs 5.2% over the year here but cuts December by almost a quarter, so compare the layouts on monthly output.
This section covers irradiation only. The Moldovan regulator’s site could not be reached for it, so tariffs, net-metering terms and connection rules for prosumers are not covered and should be taken from the regulator and the network operator before a quote is issued. For the market see Best Solar Software for Moldova, for design see Best Solar Design Software for Moldova, and for features see Best Solar Proposal Software.
What to Ask a Vendor Before Buying
Hand each vendor one real Moldova electricity bill and ask for a sample proposal. Look for tariff entry with any fixed or capacity charge, Romanian output where the customer needs it, financing that matches how Moldovan customers pay, and a price in your invoice currency. The matrix names what a vendor leaves unpublished, so a demo is where to check. Permit and grid-connection rules are not covered by the vendor pages, so take them to the Moldova authorities. The Chisinau figures above show why the quote should also carry a monthly output chart.
How We Ordered These Tools
Order: alphabetical and unranked, with the best-for picks taken from the matrix. SurgePV publishes this page and is one of the vendors on the list. The same rules apply to it as to the rest, and it is not placed first.
- Custom tariff entry: a Moldova bill rarely looks like a US rate, so entry fields matter. How well any tool models an entered tariff was not assessed.
- Demand or capacity charge fields: larger customers can pay on capacity and not only on energy. No tool’s math was assessed.
- Romanian proposal language: buyers in Moldova generally read proposals in the local language. Translation quality was not assessed.
- Lease or PPA financing: commercial buyers often compare buying with paying for the power. Whether any tool models a Moldova deal was not assessed.
- US dollar price: a published price allows planning before a call. Discounts and negotiated quotes were not assessed.
- Free tier: a free plan lets a small team try the workflow. Limits beyond what its page states were not assessed.
Sources and Dates
Vendor pages were read in October 2026 and the headline prices were rechecked on 3 November 2026. They are Aurora (pricing and three help articles), Energy Toolbase (pricing, FAQ and product page), OpenSolar (free page, 16 February 2026 post, and the tariff, language and finance pages linked above) and SurgePV (pricing). Screenshots are captures of each vendor’s public website from 29 October 2026.
The Chisinau irradiation figures were read in November 2026 from PVGIS at 35 degrees and 15 degrees. No Moldovan regulator page could be read.
See SurgePV on your Moldova project
Book a guided demo and ask how it handles a Moldova tariff and capacity charge.
Book a Free DemoMore Solar Software Guides to Compare
- Best solar software in Moldova
- Solar design software for Moldova
- Best solar proposal software, all markets
- Solar proposal software features and SurgePV pricing
Frequently Asked Questions
What is the best solar proposal software in Moldova?
It depends on the job. OpenSolar documents custom tariffs with demand charges, and its core app is free. Energy Toolbase lists PPA and lease financing. Aurora Solar lists tablet-friendly proposals. SurgePV documents roof modeling through proposals but states no Moldova output. No tool here names Moldova on the pages we read, so ask each vendor to model one real Moldova electricity bill.
Can proposal software handle electricity tariffs in Moldova?
OpenSolar and Aurora Solar help articles describe custom rates with demand charges, and OpenSolar lists flat, time-of-use and tiered rates too. Energy Toolbase’s help center says users can create custom rate schedules. None of these pages names a Moldova tariff, so enter the rate from the customer’s bill and check the result.
Is there free solar proposal software for Moldova?
OpenSolar says its core app is free for solar professionals. From 16 April 2026 it charges for API Access and supported connectors. The other tools here are paid or priced on request.
Does solar proposal software support Romanian proposals?
OpenSolar lists 13 proposal languages: English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish. For Moldova, Romanian is not on that list. The Aurora, Energy Toolbase and SurgePV pages we read do not list proposal languages for Moldova. Ask each vendor if you must send proposals in Romanian.
How much does solar proposal software cost for an installer in Moldova?
Prices are in US dollars, as each vendor shows them. OpenSolar’s core app is free. Aurora lists $159 per user per month for Basic billed monthly, or $135 per user per month billed annually. SurgePV lists $1,899 per user per year for one user. Energy Toolbase gives its price on a demo call.


