A Kuwaiti rooftop quote has an awkward job. The sources we found describe low retail electricity prices, no nationwide net metering and a buyback plan with no published price, so the proposal cannot lean on a tariff or an export rate. What it can lean on is the customer’s own bill, shown line by line, and an Arabic version when the buyer wants one.
On that test the four tools split as follows. OpenSolar documents a custom tariff form with demand charges, and its core app is free. Energy Toolbase names PPA and lease financing. Aurora Solar names tablet-friendly proposals. SurgePV documents roof modeling through proposals, priced per user, and states no Kuwait tariff output. None of them names Kuwait on the vendor pages checked, so every claim below about Kuwait fit is a question to put to the vendor. A PPA (power purchase agreement) means the customer pays for the power a system makes instead of buying the system.
SurgePV publishes this page and is a vendor on this list. The tool facts come from each vendor’s own site and were read in October 2026; no side-by-side trials were run. The Kuwait context section further down cites a press report and a pv magazine item, and nothing on this page is drawn from a Kuwaiti regulator’s text.
Criteria used: custom tariff entry, demand or capacity charge fields, Arabic proposal language, lease or PPA financing, US dollar price, free tier.
Solargraf is not compared. Its site (solargraf.com) could not be read by automated tools in October 2026, so no claim about it can be sourced.
Want to see SurgePV on your own project?
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Kuwait
- A bill-driven quote where subsidised power makes savings thin: OpenSolar. A custom tariff form with flat, time-of-use, tiered and demand-charge rates lets you copy the customer’s actual bill, which matters when no published Kuwait tariff exists to load. The core app is free, though API Access and connectors are charged from 16 April 2026. Arabic is not among its 13 proposal languages.
- A commercial buyer who wants to compare owning with buying the power: Energy Toolbase. Its FAQ names cash, PPA, loan and lease structures. Pricing comes on a demo call.
- A sales visit where the proposal is shown on a tablet: Aurora Solar. The Basic plan names tablet-friendly sales proposals, and a project’s rate can be edited by hand or built as a custom rate with demand charges.
- One product from roof model to parts list and proposal: SurgePV. It documents roof modeling, shading, yield, financial modeling, bill of materials and proposals. Ask in a demo how a Kuwait tariff and a capacity charge are entered, since its published scope names neither.
Comparison Table
Alphabetical order, not a ranking. Each price below was read on the vendor’s own page in October 2026 and stays in the currency the vendor shows.
| Tool | Best for | Price | Free or paid | Decisive Kuwait fact |
|---|---|---|---|---|
| Aurora Solar | Tablet-friendly proposals | $159 or $259 per user per month (monthly billing); $135 or $220 billed annually | Paid | Pricing page lists North America and Europe regions; Kuwait not named |
| Energy Toolbase | PPA and lease modeling for commercial deals | Price given on a demo call | Paid | Kuwait not named on the pages we read |
| OpenSolar | Custom tariffs with demand charges | Core app free of charge; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | 13 proposal languages; Arabic is not on that list |
| SurgePV | Roof model to BOM and proposal, per user | $1,899 per user per year (1 user), in US dollars | Paid, guided demo | BOM and proposal generation in scope; no Kuwait item stated |
Kuwait Criteria Matrix
Every cell reads Documented, Partial or Not stated. Documented: the vendor’s own page states so. Partial: a related feature is described but not the whole item. Not stated: silence on the pages read in October 2026. Nothing is scored or weighted.
| Tool | Custom tariff entry | Demand or capacity charge fields | Arabic proposal language | Lease or PPA financing | US dollar price | Free tier |
|---|---|---|---|---|---|---|
| Aurora Solar | Documented (configure your own rates) | Documented (help article on custom rates adds demand charges) | Not stated | Documented (loan, lease, PPA or cash product in Sales Mode) | Partial ($ shown, currency not named) | Not stated |
| Energy Toolbase | Documented (help center: create your own custom rate schedules) | Partial (FAQ: models demand charge reduction with storage) | Not stated | Documented (cash, PPA, loan, lease) | Not published for ETB Developer (demo call) | Not stated |
| OpenSolar | Documented (custom tariff form) | Documented (demand charges in the form) | Partial (13 languages; Arabic is not on that list) | Partial (options depend on market and provider) | Documented (core app free; paid services in US$) | Documented |
| SurgePV | Not stated | Not stated | Not stated | Not stated | Documented ($1,899 per user per year, 1 user) | Not stated (guided demo) |
The Kuwait column that matters most is the first one. No vendor page names a Kuwait tariff, so the custom entry and capacity-charge cells decide whether a Kuwaiti bill can be typed in at all. OpenSolar and Aurora help articles both cover demand charges. Silence from a vendor is not proof of a gap, so hand each one the same Kuwait bill and compare the output.
Tool Entries
Aurora Solar
Best for: installers who present on a tablet and are happy to key in a Kuwait rate themselves, because the rate database lets you edit or create rates.
Not the right choice if: you want a Kuwait rate preloaded or an Arabic proposal. The pricing page and the help articles read name neither Kuwait nor Arabic.
What the vendor documents: the pricing page names 3D roof modeling, performance simulation, adders, discounts and incentives, and a utility rate database where you “configure your own rates or use rates from Genability and Aurora”. Premium brings LIDAR-assisted modeling, bankable shade reports and battery modeling. Its help article on editing rates states you can change the import rate, export rate, rate details and compensation policy for a project. Its help article on custom rates lets an admin create a rate with tiers, time-of-use periods and demand charges. Its financial analysis article states a loan, lease, PPA or cash product must be chosen in Sales Mode.
Price (checked October 2026): Basic $159 per user per month billed monthly, or $135 per user per month billed annually ($1,620 billed annually); Premium $259 per user per month, or $220 billed annually ($2,640 billed annually). Enterprise is custom, per project. The page shows “$” and does not name the currency.
Limitations: the pricing page shows North America and Europe regions only. The rate would be entered by hand from a Kuwait bill, and no result for Kuwait is described.
Vendor link: aurorasolar.com.

Energy Toolbase
Best for: developers pricing a Kuwait commercial or institutional site as a PPA, lease or loan, with storage in the model.
Not the right choice if: you need a price before a call or want Kuwait named. The pricing page sends you to a 30-minute demo for a quote.
What the vendor documents: its ETB Developer FAQ states the platform supports cash purchases, power purchase agreements, loans and leases. It states the platform has a built-in database of utility rates, incentives and tariffs, and that it models demand charge reduction with battery storage. It also states ETB Developer is web-based. The product page counts 120,000+ tracked utility rates and outlines a fully custom proposal template builder.
Price (checked October 2026): no ETB Developer figure is published on the pricing page. The page also names implementation and support packages with no price.
Limitations: the pages read do not name Kuwait or say which countries the rate database covers. Its rate schedules help page states users can create custom rate schedules, and that its rates database spans 50 states and 42 international territories.
Vendor link: energytoolbase.com.

OpenSolar
Best for: small installers who want to start free and copy a Kuwait customer’s bill, demand charge included, into a custom tariff.
Not the right choice if: the proposal must be in Arabic. The language article gives 13 languages and Arabic is not one of them.
What the vendor documents: its tariff article states you can create a custom tariff with a tariff type and compensation mechanism. The rate structures are flat, time-of-use, tiered and demand charges. You can add fixed and minimum charges. Its integrated finance page states the options depend on your market and provider, and may include loans, leases, PPAs and third-party ownership.
Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access, which lets other software connect to OpenSolar, and for supported connectors. This comes from its 16 February 2026 post.
Limitations: a Kuwait tariff has to be built by hand, and the pages read name no Kuwait tariff to start from.
Vendor link: opensolar.com.

SurgePV
SurgePV is our product.
Best for: teams that want one product from roof model to parts list and proposal, priced per user, and will check the Kuwait items in a demo.
Not the right choice if: you need a self-serve trial (SurgePV runs a guided demo) or want a tariff form, capacity-charge field or Arabic confirmed in writing before a sales call. The published scope names none of them, whereas OpenSolar documents a custom tariff form. Outputs support design and documentation and do not replace approval by the responsible engineer, authority, lender or utility. A CRM (customer tracking tool) is not in the published scope, and monitoring and ERP (business management software) sit outside it.
What the vendor documents: 3D roof modeling, array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar proposal software for the product page.
Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.
Limitations: results depend on source data, assumptions and equipment models. No tariff form, capacity-charge field, Arabic output or PPA modeling is stated.
Vendor link: surgepv.com.

What Kuwait Says About Paying for Rooftop Solar
A Kuwaiti proposal should be cautious about export income, because the sources read show plans, not a published scheme. These facts are as of November 2026.
A buyback plan, with no price. An Arab Times item of 31 August 2024, citing Al-Seyassah and unnamed informed sources, states the Ministry of Electricity, Water and Renewable Energy made buying renewable electricity from citizens a priority in its 2024 to 2025 development plan. Citizens would install rooftop panels and sell the output to the ministry. The price is described only as competitive. No ministry document was read, so treat this as an unconfirmed press report of a plan. The ministry was still evaluating economics, installation logistics and safety procedures, and no launch date is given.
No nationwide net metering described. A pv magazine report of 24 September 2025 on a Rystad Energy forecast does not describe an existing nationwide net metering policy, and the analyst recommends adopting one with transparent compensation rates and simpler applications. It puts current solar capacity at about 50 MW.
Low retail prices limit the savings story. The same analyst states subsidised fossil fuels lead to low electricity prices for end consumers. The report gives no tariff figures, so a proposal should use the customer’s own bill and show payback on that, not on an assumed rate.
The ministry’s public site. The ministry’s English home page, as read in November 2026, shows no rooftop solar or tariff pages, only a citizen guide on rationalising consumption and a services portal. Ask the ministry or a registered installer for the current scheme in writing.
How to write the proposal. Make self-consumption savings the base case, show export income as a separate optional line with its source and date, and do not state a per-kWh export rate. Ask each vendor, SurgePV included, whether a proposal can show an optional income line in a demo, and see plan details on the pricing page. For connection and design points, see the design software category, and for the market, the Kuwait solar software list.
What to Ask a Vendor Before Buying
Bring one real Kuwait electricity bill and ask each vendor to build the proposal from it. Watch for four things. Can the tariff and any fixed or capacity charge be typed in? Does the customer-facing document come out in Arabic, if your buyer needs that? Do the financing options match how Kuwaiti customers pay? Is the price quoted in the currency on your invoice? Where a vendor is silent, the matrix states Not stated, and a demo is the place to settle it. Because the Kuwait sources here report plans rather than a published export scheme, also ask whether an optional income line can be switched off. Permit and grid-connection rules sit with the Kuwait authorities, not with any vendor page above.
How We Ordered These Tools
Methodology: the tools are in alphabetical order and carry no score. The best-for picks come from the matrix. SurgePV publishes this page and is a vendor on this list; it follows the same rules as the others and is not placed first.
- Custom tariff entry: matters most in Kuwait because the sources read give no tariff figures. Not assessed: how well a tool models a tariff you enter.
- Demand or capacity charge fields: larger customers can pay for capacity as well as energy. Not assessed: any tool’s arithmetic.
- Arabic proposal language: a Kuwaiti buyer may expect Arabic. Not assessed: translation quality.
- Lease or PPA financing: commercial buyers weigh buying against paying for output. Not assessed: whether a tool models a Kuwaiti deal.
- US dollar price: a published price lets a team budget before a call. Not assessed: discounts or negotiated quotes.
- Free tier: a free plan lets a small team try the workflow. Not assessed: its limits beyond what the page states.
Sources and Dates
Vendor pages were read in October 2026 and the headline prices were rechecked on 3 November 2026. They are Aurora (pricing and three help articles), Energy Toolbase (pricing, FAQ and product page), OpenSolar (free page, 16 February 2026 post, and the tariff, language and finance pages linked above) and SurgePV (pricing). Screenshots are captures of each vendor’s public website from 29 October 2026.
The Kuwait facts come from the Arab Times item of 31 August 2024 (a news report citing unnamed sources) and the pv magazine report of 24 September 2025, read in November 2026. The ministry’s home page, mew.gov.kw, was also read in November 2026.
See SurgePV on your own project
Book a guided demo and ask how it handles a Kuwait tariff and capacity charge.
Book a Free DemoGo Deeper on a Category
- Best solar software in Kuwait
- Solar design software for Kuwait
- Best solar proposal software, all markets
- Solar proposal software features and SurgePV pricing
Frequently Asked Questions
What is the best solar proposal software in Kuwait?
It depends on the job. OpenSolar documents custom tariffs with demand charges, and its core app is free. Energy Toolbase lists PPA and lease financing. Aurora Solar lists tablet-friendly proposals. SurgePV documents roof modeling through proposals but states no Kuwait output. No tool here names Kuwait on the pages we read, so ask each vendor to model one real Kuwait electricity bill.
Can proposal software handle electricity tariffs in Kuwait?
OpenSolar and Aurora Solar help articles describe custom rates with demand charges, and OpenSolar lists flat, time-of-use and tiered rates too. Energy Toolbase’s help center says users can create custom rate schedules. None of these pages names a Kuwait tariff, so enter the rate from the customer’s bill and check the result.
Is there free solar proposal software for Kuwait?
OpenSolar says its core app is free for solar professionals. From 16 April 2026 it charges for API Access and supported connectors. The other tools here are paid or priced on request.
Does solar proposal software support Arabic proposals?
OpenSolar lists 13 proposal languages: English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish. For Kuwait, Arabic is not on that list. The Aurora, Energy Toolbase and SurgePV pages we read do not list proposal languages for Kuwait. Ask each vendor if you must send proposals in Arabic.
How much does solar proposal software cost for an installer in Kuwait?
Prices are in US dollars, as each vendor shows them. OpenSolar’s core app is free. Aurora lists $159 per user per month for Basic billed monthly, or $135 per user per month billed annually. SurgePV lists $1,899 per user per year for one user. Energy Toolbase gives its price on a demo call.


