Start with what the job in Kuwait needs. For a small installer, OpenSolar’s core app is free, though Arabic is missing from its proposal languages. For utility-scale or lender-facing work, PVsyst documents P50 to P90 yield results and HelioScope Pro takes designs up to 5 MW (DC). Aurora Solar charges per user in US dollars, and SurgePV covers roof modeling, bill of materials and proposals in one product. Pv magazine reported in September 2025 that Kuwait had about 50 MW of solar and large tenders under way, so tender-grade output is the gap to probe. No vendor here states a Kuwaiti ministry output.
This is a desk comparison of what each vendor publishes, checked November 2026. We have not run side-by-side tests. SurgePV publishes this page and is one of the five tools on it. Tool facts come from each vendor’s own site. Other tools are not compared here. See the global list of solar design software for them.
Criteria used: Arabic support, utility-scale design and price, the three things a Kuwait tender or industrial client is most likely to ask a vendor about.
Want to see SurgePV on your own project?
Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Kuwait
- Large roof or tender-sized plant that needs yield evidence: PVsyst. The help site describes P50 to P90 evaluations, which suits the 500 MW Jahra tender scale of conversation, though it lists 11 translations besides English and Arabic is not one. Windows only.
- Industrial rooftop, carport or ground array with a price you can read: HelioScope. Pro costs $2,640 per license per year and stops at 5 MW (DC), with P90, P95 and P99 values.
- Small installers who want zero licence cost: OpenSolar. The core app is free and proposals come in 13 listed languages, Arabic excluded. API Access and connectors carry charges from 16 April 2026.
- Sales teams on a seat plan: Aurora Solar. Basic is $135 per user per month billed annually, in US dollars.
- Roof model through bill of materials to proposal, per user: SurgePV. Bring a Kuwait site to the demo and ask for Arabic output and a ministry-ready diagram; the published scope states neither.
Comparison Table
Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked on each vendor’s own page in October and November 2026.
| Tool | Best for | Price | Free or paid | Decisive scope fact |
|---|---|---|---|---|
| Aurora Solar | Design and sales proposals, per user | Basic $159 per user per month; $135 per user per month billed annually | Paid | SLD editor “only available in Europe”; P50 only |
| HelioScope | Commercial design, published prices | Basic $159 per month or $1,620 per year; Pro $259 per month or $2,640 per year, per license | Paid | Up to 5 MW (DC) on Pro; USD prices |
| OpenSolar | Free core app, proposals | Core app free; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | Free core app; custom tariffs |
| PVsyst | Yield evidence | CHF 700 per year (Professional) | Paid | Documents P50 to P90 evaluations; Windows only |
| SurgePV | Roof model to BOM and proposal, per user | $1,899 per user per year (1 user) | Paid, guided demo | BOM and proposal generation in scope; no Kuwait-specific output stated |
Tool Entries
Aurora Solar
Best for: sales-led installers in Kuwait who prefer one seat price per person and are comfortable budgeting in dollars.
Not the right choice if: a lender in Kuwait asks for P90 figures, because Aurora reports P50 only, or you want a diagram or price list prepared for Kuwait. Its single line diagram editor is “only available in Europe” and Kuwait is not named on the pages read.
What the vendor documents: Aurora’s P-value help article describes estimates as P50 values drawn from typical-year weather data. On utility rates, the help article lets you enter an export rate in dollars per kWh together with a compensation policy, the closest published match to a Kuwait tariff rule. The diagram editor page restricts the single line diagram editor to Europe. A regional selector on the pricing page covers North America and Europe, and no page read lists app or proposal languages, so check Arabic output yourself.
Price (checked November 2026): on the pricing page, Basic is $159 per user per month, or $135 per user per month billed annually ($1,620 billed annually). Premium is $259 per user per month, or $220 per user per month billed annually ($2,640 billed annually). Prices are in US dollars.
Limitations: no Aurora page read names a Kuwait ministry or tender output.
Vendor link: aurorasolar.com.

HelioScope
Best for: commercial and industrial teams in Kuwait that want rooftop, carport and ground mount in one tool and a plan price they can read without a sales call.
Not the right choice if: a Kuwait site is larger than 5 MW (DC) and Enterprise is off the table, or you need a ministry or tender output. Pro stops at 5 MW (DC), and no page read names Kuwait.
What the vendor documents: every plan lists rooftop, carport and ground mount layouts, storage design, shade reports, an 8760 production report (one yield figure per hour of the year) and a 50,000-component module and inverter library. Pro adds financial modeling, sales proposals, LiDAR-assisted modeling (laser-scan height data) and P90, P95 and P99 values. Enterprise alone carries single-axis trackers, PVsyst export and designs up to 30 MW (DC). The plan page claims “Accuracy within 1% of PVsyst”, which is the vendor’s own statement.
Price (checked November 2026): Basic is $159 per license per month or $1,620 per license per year, with 1 user, 120 projects per year and designs up to 1.25 MW (DC). Pro is $259 per month or $2,640 per year, for designs up to 5 MW (DC). Enterprise is custom per-project pricing. Source: HelioScope pricing. The free trial is 14 days, one per customer.
Limitations: HelioScope’s pages read name no Kuwait ministry or tender output.
Vendor link: helioscope.aurorasolar.com.

OpenSolar
Best for: small Kuwait installers who want a free core app and are happy to build proposals in a language on the vendor’s list.
Not the right choice if: your Kuwait clients need Arabic proposals, a diagram template that names Kuwait, or documented P50 to P90 yield. The pages read list none of these.
What the vendor documents: the proposal language article names 13 proposal languages (English, Dutch, Swedish, Spanish, French, Norwegian, Thai, German, Polish, Portuguese, Italian, Danish and Finnish) and adds that a manually translated proposal template is required, so Arabic is not on the list. SLD support is stated in the single line diagram article for AU, NZ, US, CA, UK, FR, DE, IT, ES and IN, which leaves Kuwait out. Its tariff article explains custom tariffs with flat, tiered and demand-charge rates, the route to model a Kuwait tariff by hand.
Price (checked November 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access and supported connectors, per its 16 February 2026 post. The core app stays free.
Limitations: OpenSolar’s pages read name no Kuwait ministry or tender output.
Vendor link: opensolar.com.

PVsyst
Best for: Kuwait projects where a lender or investor wants a simulation report, such as a large roof or a ground-mounted array.
Not the right choice if: you want proposals from the same tool (none are described on the pages read), need a diagram that shows storage, or work on a Mac. The requirements page says PVsyst runs only under Windows.
What the vendor documents: PVsyst documents a P50 to P90 evaluation, where P50 and P90 are the yields exceeded in 50% and 90% of years. English is the reference language per its languages page, and the translations are French, German, Spanish, Portuguese, Italian, Turkish, Korean, Chinese, Japanese, Polish and Russian, so Arabic is not offered. The documentation is not translated. The single line diagram page describes an editor and viewer for PV strings, inverters and transformers; it is for grid-connected systems, excludes storage, and the page itself calls it “still work in progress”. Tariff modeling sits in the economic evaluation help page on feed-in tariffs and self-consumption.
Price (checked November 2026): CHF 700 per year for PVsyst 8 Professional, with grouped-order discounts of 5% for 2 to 4 licences, 15% for 5 to 9 and 20% for 10 or more. The product page offers a one-month free trial.
Limitations: PVsyst’s pages read name no Kuwait ministry or tender output.
Vendor link: pvsyst.com.

SurgePV
SurgePV is our product. We publish this list and sell this software.
Best for: Kuwait teams that want roof modeling, shading, yield, financial modeling, bill of materials and proposals under one per-user licence. Ask for Kuwait outputs in a demo.
Not the right choice if: you want to try it alone first (SurgePV offers a guided demo), or need a local-currency price in writing before speaking to sales; the pricing page lists US dollars. It also fits badly if you want a free tool for small jobs, since OpenSolar’s core app is free. Outputs support design and documentation but do not replace sign-off by the responsible engineer, authority, lender or utility. The published scope lists no CRM (customer tracking tool), monitoring or ERP (business management software).
What the vendor documents: 3D roof modeling, array layout and shading analysis. It also lists energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar design software for the product page.
Price (checked November 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.
Limitations: results rest on source data, assumptions and equipment models. The pricing page and published scope state no Arabic interface, no Kuwait ministry or tender output and no P50 to P90 results.
Vendor link: surgepv.com.

Kuwait Market Facts
Pv magazine (24 September 2025) quotes Kuwait’s solar capacity at around 50 MW and says it is expected to pass 1 GW in 2029. It gives the goal of raising renewables from under 1% of generation to 15% by 2030, and says Rystad Energy thinks the goal could be out of reach. It describes the 1.1 GW Shagaya Renewable Energy Park tender and a May 2025 tender for two solar plants totalling 500 MW in the Jahra region. A Rystad analyst said a clear nationwide net metering policy is vital, so check the ministry for the rules that apply to a small system.
What to Ask a Vendor Before Buying
Ask each vendor to run one sample Kuwait project, ideally a tender-sized or industrial roof. Check four things. A proposal in Arabic your client can read. A layout and yield result at the capacity you work at, from rooftop to utility scale. A diagram you could hand a ministry or tender owner. An invoice currency that matches your budget. Where a vendor is silent on the pages read, a demo or trial is the place to settle it.
How We Ordered These Tools
We did not rank these tools. They are listed alphabetically, and the best-for picks come from what each vendor publishes.
- Arabic output: tender documents and clients may use Arabic. Translation quality was not assessed.
- Capacity range: a rooftop and a 500 MW plant need different tools. How any tool copes with a very large site was not assessed.
- Diagram for the owner: ministry or tender owner formats were not compared with any tool’s diagram.
- Currency: the invoice currency shows what a Kuwait buyer pays. Discounts and negotiated quotes were not assessed.
- Lender-grade yield: larger plants may need a report a financier will read. No lender’s acceptance was assessed.
Sources and Dates
Vendor pages were read in October and November 2026. Aurora Solar (pricing, diagram editor, P-values, utility rates). HelioScope (pricing, free trial). OpenSolar (free, API and connector charges, languages, diagrams, tariffs). PVsyst (shop, product, languages, diagram, P50 to P90, economics). SurgePV (pricing). Kuwait sources: pv magazine, September 2025.
Go Deeper on a Category
- Solar design software for Kuwait
- Solar proposal software for Kuwait
- Solar software in Oman, a neighbor market
- Solar software in Saudi Arabia, a neighbor market
- Solar software in Qatar, a neighbor market
- Best solar design software, all markets
Frequently Asked Questions
How much solar does Kuwait have?
Pv magazine reported in September 2025 that Kuwait’s solar capacity stood at around 50 MW and was expected to pass 1 GW in 2029. Its goal is 15% of generation from renewables by 2030, which Rystad Energy said could be out of reach.
What large solar tenders is Kuwait running?
Pv magazine describes the 1.1 GW Shagaya Renewable Energy Park tender and a May 2025 tender for two solar plants totalling 500 MW in the Jahra region. Check the tender owner for current status.
What is the best solar software in Kuwait?
It depends on the job. OpenSolar does not list Arabic among its proposal languages. PVsyst does not list Arabic among its translations. PVsyst documents P50 to P90 yield results. SurgePV lists roof modeling, bill of materials and proposals in one product. None of the vendor pages we read states a ministry or tender output.
Is there free solar software for Kuwait?
OpenSolar says its core app is free for solar professionals. The vendor charges for API Access and supported connectors from 16 April 2026. PVsyst offers a one-month free trial and HelioScope a 14-day trial. None of the vendors states a ministry or tender output.
Which solar software works in Arabic?
OpenSolar does not list Arabic among its proposal languages. PVsyst does not list Arabic among its translations. Aurora Solar and SurgePV do not state a Arabic interface on the pages we read.
How much does solar software cost in Kuwait?
Each vendor uses its own currency. Aurora Basic is $159 per user per month, or $135 per user per month billed annually. HelioScope Pro is $2,640 per license per year. OpenSolar’s core app is free, with charges for API Access and connectors from 16 April 2026. PVsyst 8 Professional is 700 Swiss francs per year. SurgePV lists $1,899 per user per year for one user.


