Solar Design Software in Kuwait: 6 Tools Compared (2026)

Six solar design tools compared on what each vendor publishes for Kuwait: heat and dust settings, trackers, ground-mount scale, the drawings and calculations MEW asks for, and price. Checked October 2026.

SurgePV publishes this list and sells solar design and proposal software, so we have a commercial interest in this category. This is a desk comparison of what each vendor publishes; we have not run side-by-side tests. Prices and vendor facts checked October 2026. How we evaluate software

Published Last updated
Akash Hirpara

Written by

Akash Hirpara

Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

Pick by the job, not by one winner. For a large ground-mount plant, look at PVcase or RatedPower. For a yield report with heat and dust settings, look at PVsyst. For commercial roofs and ground sites up to a set size, look at HelioScope. For roof design to proposal, look at Aurora Solar or SurgePV. Kuwait adds one more test: MEW, the Ministry of Electricity, Water and Renewable Energy, wants drawings and calculations for solar that connects to its grid.

This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side tests. Local rules below come from MEW and the Kuwait Authority for Partnership Projects (KAPP). Tool facts come from each vendor’s own site. For wider Gulf rules, see our Middle East solar compliance guide.

Criteria used: heat and dust settings, tracker support, ground-mount scale, drawings and calculations for a MEW file, published price.

Want to see SurgePV on your own project?

Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Best-For Picks for Kuwait

  • Large ground-mount plant with trackers: PVcase or RatedPower. PVcase lists terrain, piling, cable sizing and single line diagram (SLD) export. An SLD is a simple drawing of how the system is wired. RatedPower describes layout from screening to a document set. Neither publishes a price.
  • Yield report with heat and dust settings: PVsyst. Its help pages describe a thermal model and soiling values you can enter by month. Soiling is the loss from dust on the panels. It runs on Windows only.
  • Commercial roof, carport or ground site, sized by plan: HelioScope. Every plan lists roof, carport and ground-mount design and an SLD. Design size is capped by plan, at 1.25 MW, 5 MW or 30 MW DC. Single-axis trackers are on the Enterprise plan only.
  • Roof design to proposal and parts list in one product: SurgePV or Aurora Solar. SurgePV lists roof modeling, bill of materials (a parts list) and proposals, priced per user in US dollars. Aurora lists sales proposals and ground mounts, priced per user in dollars.

Comparison Table

Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked October 2026 on each vendor’s own page.

Tool Best for Price Free or paid Decisive scope fact
Aurora Solar Roof design to sales proposal Basic $159 per user per month, or $135 billed annually (North America page; currency not named) Paid Help article: SLD editor “only available in Europe”
HelioScope Commercial roof and ground sites Basic US$159 per month or US$1,620 per year per license Paid, free trial Single-axis trackers: Enterprise plan only
PVcase Large ground-mount plants Not published; talk to sales Paid Ground Mount is built on AutoCAD
PVsyst Yield reports CHF 700 per year (Swiss francs) Paid, one-month trial Thermal model and monthly soiling values; Windows only
RatedPower Utility-scale layout and design Not published; talk to sales Paid One subscription per company, unlimited users
SurgePV Roof design to proposal, per user US$1,899 per user per year (1 user) Paid, guided demo Heat, dust and tracker settings not stated in its published scope

Kuwait Criteria Matrix

Each cell is Documented, Partial or Not stated, based on the vendor pages we read in October 2026. Documented means the page describes the item. Partial means the page describes a related item. Not stated means the pages we read do not mention it. There are no scores or weights.

Tool Heat settings Soiling settings Single-axis trackers Drawings and calculations Published price
Aurora Solar Partial (hourly simulation uses temperature) Documented (annual or monthly value) Not stated Partial (SLD editor, Europe only) Documented ($, currency not named)
HelioScope Documented (cell temperature model) Documented (condition set) Documented (Enterprise plan only) Documented (SLD, CAD export) Documented (USD)
PVcase Not stated Partial (soiling listed as an uncertainty input) Documented Documented (SLD export, cable sizing, BOM export) Not stated
PVsyst Documented (thermal model) Documented (monthly values) Documented Partial (SLD editor, grid-connected only) Documented (CHF)
RatedPower Not stated Not stated Documented (tracker moves in layout editor) Partial (document set, bill of materials) Not stated
SurgePV Not stated Not stated Not stated Partial (electrical workflow support, bill-of-materials output) Documented (USD)

In the last column group, drawings and calculations means what MEW asks for under Section 13 (see below). That is design drawings, calculations with cable sizing, and an equipment summary. We did not check whether any tool’s output matches a MEW format.

Tool Entries

Aurora Solar

Best for: teams that sell roof projects and want design, a sales proposal and financing in one tool.

Not the right choice if: you need single-axis tracker design. The help articles we searched for “tracker” and “single-axis” did not describe it. It is also not right if you need the SLD editor in Kuwait, because the help article says it is only available in Europe.

What the vendor documents: the pricing page lists Design Mode with ground mounts, sales proposals, and “Bankable shade reports” on Premium. Its system loss diagram article says soiling uses a value in your system loss settings, set as one annual value or by month. The same article says the hourly simulation adjusts module behavior for irradiance and temperature. Its P-value article says production estimates are P50. It also says “Aurora does not natively output P90 for solar energy production.” P50 is a yield expected to be met or exceeded in 50% of years. P90 is the same test at 90% of years.

Price (checked October 2026): on the North America pricing page, Basic is $159 per user per month billed monthly. Billed annually, it is $135 per user per month. Premium is $259 monthly, or $220 per user per month billed annually. Enterprise is custom per project. The page shows “$” without naming the currency, and it does not say whether prices apply in Kuwait.

Limitations: the pages we read do not mention MEW or Kuwait.

Vendor link: aurorasolar.com.

Aurora Solar public website page, captured 29 October 2026
Aurora Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

HelioScope

Best for: commercial roof, carport and ground-mount designs where a plan size cap fits the project.

Not the right choice if: you need single-axis trackers without an Enterprise plan, or a design above the plan size cap.

What the vendor documents: the pricing page lists roof, carport, ground-mount and battery layout, CAD export and single-line diagrams on every plan. Design size is “up to 1.25 MW (DC)” on Basic, 5 MW on Pro and 30 MW on Enterprise. P90, P95 and P99 values are on Pro and Enterprise. Export to PVsyst is on Enterprise. The Cell Temperature Model article describes two models: the Sandia model and a diffusion model, “the same as that used in PVSyst.” Its condition sets article says soiling losses are set there, including monthly soiling factors. Its tracker article calls single-axis trackers “a premium feature available as part of our Enterprise plan.” The weather article lists Meteonorm files and says its free NSRDB source covers India and the Americas.

Price (checked October 2026): Basic is US$159 per month or US$1,620 per year per license. The license includes 1 user and 10 projects per month. Pro is US$259 per month or US$2,640 per year per license. Enterprise is custom per project. The pricing page shows a free trial.

Limitations: the pages we read do not mention MEW or Kuwait. HelioScope is an Aurora Inc. company, as its footer says.

Vendor link: helioscope.aurorasolar.com.

HelioScope public website page, captured 29 October 2026
HelioScope public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVcase

Best for: engineering teams that design large ground-mount plants in AutoCAD and want terrain, trackers, cable sizing and SLD export in one workflow.

Not the right choice if: you design roofs only, you do not use AutoCAD, or you need a published price. The vendor’s home page says Ground Mount is “built on AutoCAD.” Its update guide says updates need AutoCAD 2025 or newer.

What the vendor documents: the Ground Mount plan page lists slope, collision, grading and piling checks, and stringing. It also lists cable sizing and voltage drop, SLD export and bill of materials (BOM) export. Layouts export to PVcase Yield and PVsyst. The help center has articles on terrain-following trackers and single-axis tracker cabling. The Yield plan page lists bifacial and complex-terrain modeling. It also lists “built-in probability scenarios (P50, P90).” The probability estimation article lists soiling as one of the modeling uncertainties.

Price (checked October 2026): not published. The home page says “We don’t offer a complete price list online.” The plan pages say to talk to sales.

Limitations: the pages we read do not describe temperature settings or a soiling loss setting. They do not mention MEW or Kuwait.

Vendor link: pvcase.com.

PVcase public website page, captured 29 October 2026
PVcase public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVsyst

Best for: yield evidence on larger projects, where you want to set heat and dust inputs yourself and read P50 to P90 results.

Not the right choice if: you work on a Mac or in a browser, because the product page says “PVsyst only runs on Windows.” It is also not right if you need proposals from the same tool. The pages we read describe none.

What the vendor documents: the thermal loss help page describes a thermal model with heat transfer values you can change. The soiling loss page says PVsyst allows soiling loss factors “in monthly values,” and the tutorial says soiling “may become significant” in desert climates. The product page lists “single or dual-axis trackers, with safety and backtracking options.” Backtracking turns the rows to keep them from shading each other. The P50 to P90 page calls P50 and P90 exceedance values. Annual production has a 50% probability of exceeding the P50 value and a 90% probability of exceeding the P90 value. Its SLD help page describes an editor for grid-connected systems that leaves out storage and is “still work in progress.”

Price (checked October 2026): CHF 700 per year for PVsyst 8 Professional. Group discounts are 5% for 2 to 4 licenses, 15% for 5 to 9 and 20% for 10 or more. The currency is Swiss francs. The product page lists a one-month free trial.

Limitations: the pages we read do not mention MEW or Kuwait.

Vendor link: pvsyst.com.

PVsyst public website page, captured 29 October 2026
PVsyst public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

RatedPower

Best for: early-stage design of utility-scale plants, from site screening to a document set.

Not the right choice if: you need a price list, or you need the yield report itself. The vendor’s platform page says it is not a replacement for your yield-report tool. It says you can reconcile with PVsyst for the “P50, P90 and P99 report your lenders expect.”

What the vendor documents: the platform page describes parametric layout, electrical design, storage, CAPEX and a document set. It also describes a layout editor where you can shift trackers, roads and structures. The bill of materials and levelized cost of energy (LCOE) come from your cost templates. Its weather page lists PVGIS, NASA POWER, SolarAnywhere, Solcast and Solargis, or your own TMY file. A TMY file is a typical year of hourly weather data.

Price (checked October 2026): the pricing page lists Basic, Advanced and Enterprise plans, each “Talk to sales.” It sells one subscription per company, with unlimited users and projects. It shows no amount and no currency.

Limitations: the pages we read do not describe temperature or soiling settings. We did not read RatedPower’s help center. The pages we read do not mention MEW or Kuwait.

Vendor link: ratedpower.com.

RatedPower public website page, captured 29 October 2026
RatedPower public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV

SurgePV is our product.

Best for: teams that design on roofs and want roof modeling, bill of materials and proposals in one product, priced per user. See solar design software for the product page.

Not the right choice if: you design ground-mount plants or need tracker work, because SurgePV’s published scope lists roof modeling and array layout. It does not list trackers. It is also not right if you want a self-serve trial, because SurgePV offers a guided demo. Ask for heat and dust settings in writing first if you need them. Outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender or utility. SurgePV’s published product scope does not list a CRM (customer tracking tool), monitoring or ERP (business management software); /pricing lists lead management.

What the vendor documents: 3D roof modeling, solar array layout, shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation.

Price (checked October 2026): US$1,899 per user per year for 1 user, US$1,499 per user for 3 seats, US$1,299 per user for 5 seats. SurgePV does not publish a price in Kuwaiti dinars.

Limitations: results depend on source data, assumptions and equipment models. The published scope does not state a MEW format, heat or soiling settings, trackers or an SLD output. Ask for these in a demo.

Vendor link: surgepv.com.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

Kuwait Rules That Shape the Choice

MEW Section 13: solar connected to the MEW grid. MEW publishes its Regulations for Electrical Installations, MEW/R-1, Sixth Edition 2013 on its references page. Section 13 covers solar energy connected to the grid. Clause 1301 says it “regulates the large scale solar energy generation.” We did not find a separate rule for small rooftop systems in that section. The main clauses are below.

  • 1302: connect only at the main low-tension panels of the distribution substations or transformers, or for smaller projects at the main electrical switchboard.
  • 1303: the client engages an international consulting firm for the design. The firm needs at least five years of experience. It must have designed at least 10 MW of PV power in total in the last five years.
  • 1304: one or two large inverters sit in the air-conditioned electrical rooms. A series of small inverters is “not acceptable.”
  • 1305 to 1307: detailed design drawings go to MEW for approval. Calculations, including cable sizing, are submitted with the design parameters. An Excel summary lists the number and size of modules, inverter details and available solar energy.
  • 1308 and 1309: two circuits disconnect the system on a grid failure. A power quality meter also disconnects it outside set limits. The limits are 220 V to 260 V phase to neutral, 48 Hz to 52 Hz, and 5% total harmonic distortion.
  • 1310 to 1314: MEW approves the kilowatt-hour meter. A third party tests and commissions the system and a MEW engineer audits it. A yearly third-party inspection certificate goes to MEW. As-built drawings go to MEW.

This is why the matrix has a drawings and calculations column. A tool can help the consulting firm produce items 1305 to 1307. It cannot replace the firm or the MEW approval.

Heat and dust. MEW’s General Specification for Electrical Installation, MEW/S-1, 2014 says “violent sand and dust storms occur” in Kuwait. It sets a maximum summer ambient temperature of 55 degrees Celsius and a “max. sun radiation temperature in summer” of 84 degrees Celsius. These are design limits for electrical equipment, not yield inputs. They are a fair test for a sample project. Ask each vendor to run one with a 55 degree Celsius ambient and monthly soiling values.

Utility-scale projects. KAPP lists the Al Dibdibah power and Al Shagaya Renewable Energy Phase Three project on its project page, which is in Arabic. The page cites a goal of meeting 15% of Kuwait’s energy needs from diverse sources by 2030. It says Phase Three is expected to total at least 4,500 MW using PV and concentrated solar power. It says the project is offered as four zones, and that Zone 2 is 500 MW of PV. It says the Zone 2 bid deadline was extended to 30 April 2026. We did not check later steps.

Export income, language and currency. We did not find a rooftop net-metering or export-payment rule in Section 13 or on the KAPP page. Ask MEW before you promise a customer export income. The MEW site we read has English and Arabic versions. We did not check which vendors produce Arabic reports or Kuwaiti dinar figures. Ask each vendor before you buy.

What to Ask a Vendor Before Buying

Ask each vendor for one sample project on a Kuwait site. Then look for these items. First, a summer ambient setting of 55 degrees Celsius and monthly soiling values. Second, tracker design if you build ground-mount. Third, the design drawing and the cable-size calculation you would send to the consulting firm. Fourth, the equipment summary you would put in the Excel sheet MEW asks for. Fifth, a price in the currency you will be invoiced in. Where a vendor does not publish an item on the pages we read, the matrix says so. A demo or trial is the place to confirm it.

How We Ordered These Tools

SurgePV publishes this page and is a vendor on this list. Its entry uses the same vendor-page sources and template as every other tool here.

We did not rank these tools. They are listed alphabetically, and the best-for picks come from the matrix above.

  • Heat settings: Kuwait summers are hot, and heat lowers panel output. We did not assess whether any model matches measured output in Kuwait.
  • Soiling settings: dust lowers output until the panels are cleaned. We did not assess any vendor’s default soiling values.
  • Single-axis trackers: ground-mount plants often use trackers that follow the sun. We did not assess tracker modeling accuracy.
  • Drawings and calculations: MEW asks for drawings, cable-size calculations and an equipment summary. We did not assess whether any output meets a MEW format.
  • Published price: a price shows what a buyer pays and in which currency. We did not assess discounts or quotes.

Sources and Dates

Vendor pages were read in October 2026. Aurora Solar (pricing, SLD editor). HelioScope (pricing, cell temperature). PVcase (Ground Mount, Yield). PVsyst (shop, product page). RatedPower (pricing, platform). SurgePV (pricing). Kuwait sources are the MEW documents MEW/R-1 and MEW/S-1 and the KAPP project page, all linked above and read in October 2026. The MEW and KAPP sites did not answer plain command-line requests from our machine. We read them in a browser and a page fetcher.

See SurgePV on your own project

Book a guided demo and ask for the heat, dust and drawing outputs you need.

Book a Free Demo

Go Deeper on a Category

Frequently Asked Questions

What is the best solar design software for Kuwait?

It depends on the job. For a large ground-mount plant, PVcase and RatedPower describe layout tools for that work. For a yield report with heat and dust settings, PVsyst describes both. For roof design with a proposal, Aurora Solar and SurgePV are the fit. None of the vendor pages we read mention MEW, the Ministry of Electricity, Water and Renewable Energy.

Which software handles Kuwait’s heat and dust?

PVsyst describes a thermal model and monthly soiling values. HelioScope describes a cell temperature model and soiling losses in its condition sets. Aurora Solar describes soiling as a single annual value or monthly values. The pages we read for PVcase, RatedPower and SurgePV do not describe temperature or soiling settings. Ask each vendor to run a sample project with a summer ambient temperature of 55 degrees Celsius, the figure in MEW’s electrical specification.

What does MEW ask for when you connect solar to its grid?

MEW’s Regulations for Electrical Installations (MEW/R-1, Sixth Edition 2013) have a section on large-scale solar connected to the MEW grid. It asks for detailed design drawings for MEW approval. It asks for design and cable-size calculations. It asks for an Excel summary of panels, inverters and available solar energy. It also asks for MEW-approved kilowatt-hour metering, third-party testing audited by a MEW engineer, and a yearly third-party inspection.

Do I need an international consulting firm to design a solar plant in Kuwait?

For a system that connects to the MEW grid under Section 13 of MEW/R-1, yes. Clause 1303 says the client shall engage an international consulting firm for the design. The firm needs at least five years of experience. It must have designed at least 10 MW of PV power in total in the last five years. Software does not replace that firm. It helps the firm produce drawings and calculations.

How much does solar design software cost for a Kuwait team?

Each vendor publishes in its own currency. Aurora Solar lists $159 per user per month billed monthly for Basic, or $135 billed annually. That is on its North America pricing page, which does not name the currency. HelioScope lists US$159 per month or US$1,620 per year per license for Basic. PVsyst 8 Professional is CHF 700 per year. SurgePV lists US$1,899 per user per year for one user. PVcase and RatedPower say to talk to sales. No vendor on this page publishes a price in Kuwaiti dinars.

Which tools support trackers for Kuwait ground-mount projects?

PVsyst, PVcase and RatedPower describe tracker work in their documents. HelioScope offers single-axis trackers only on its Enterprise plan. The Aurora Solar help articles we searched for tracker and single-axis did not describe single-axis trackers. SurgePV’s published scope lists roof modeling and array layout, and does not list trackers.

About the Contributors

Author
Akash Hirpara
Akash Hirpara

Co-Founder · SurgePV

Akash Hirpara is identified by SurgePV as a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; education, certifications, project totals, financial results, speaking engagements, and media appearances are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Ready to Design and Propose Faster?