This page is for installers and EPC teams in Ireland choosing solar proposal software. Short answer: for SEAI grant and VAT built into the quote, pick Sunbase; for free core app with a custom grant line, pick OpenSolar.
If you quote Irish homes, the proposal has to carry four local lines: the SEAI grant, VAT at the zero rate for private dwellings, the customer’s Clean Export Guarantee rate, and the right ESB Networks form. The Clean Export Guarantee is the payment a supplier makes for power you export. ESB Networks runs the electricity network. On the pages we read, only Sunbase’s own blog states SEAI grant and VAT handling, so it is the pick if that line must be built in. OpenSolar suits an installer who is happy to enter the grant as a custom incentive and wants a free core app. The vendor charges for API Access and connectors from 16 April 2026. SurgePV documents the design-to-proposal workflow but publishes nothing Irish, so ask for the Irish lines in a demo. No tool states Clean Export Guarantee or ESB Networks handling.
This is a desk comparison of what each vendor publishes, checked October 2026. We have not run side-by-side tests. Local rules below come from SEAI, Revenue, the Commission for Regulation of Utilities and ESB Networks, and tool facts come from each vendor’s own site. For the wider rules, see our Ireland solar compliance guide.
Criteria used: SEAI grant line, VAT treatment, Clean Export Guarantee rate, ESB Networks form, price currency, free tier.
Want to see SurgePV quote an Ireland project?
Book a guided demo and bring a real Ireland site. We walk through design, yield, finance and the proposal in one platform.
Book a Free DemoChecking cost first? See the SurgePV pricing page.
Best-For Picks for Ireland
- SEAI grant and VAT built into the quote: Sunbase. Its blog says its proposal software builds SEAI grant calculations and VAT rules directly into the quote. It also covers CRM and project management, and the post is dated 2 April 2025.
- Free core app with a custom grant line: OpenSolar. The core app is free for solar professionals. The vendor charges for API Access and connectors from 16 April 2026. Its help centre documents fixed and size-based incentive types.
- Free design and customer proposal from a UK-built tool: Easy PV. Its Basic plan is free and lists a customer proposal and payment options. Its pages describe MCS and DNO forms, so enter the Irish grant, VAT and ESB Networks items by hand.
- Roof model to bill of materials and proposal in one product, priced per user: SurgePV. It documents roof modeling, shading, yield, financial modeling, bill of materials and proposals, priced per user. Ask in a demo how it handles the SEAI line, VAT and export payments. Its published scope names none of them.
Aurora Solar has no pick on this page. Its European pages describe design and proposals for European teams but do not name Ireland.
Ireland Solar Proposal Software Comparison Table
The tools are in alphabetical order. This is not a ranking. Pick by the situation above. Prices checked October 2026 on each vendor’s own page.
| Tool | Best for | Price | Free or paid | Decisive scope fact |
|---|---|---|---|---|
| Aurora Solar | Teams already on Aurora | $159 or $259 per user per month (monthly billing); $135 or $220 billed annually | Paid | Europe pages do not name Ireland or SEAI |
| Easy PV | Free design and proposal, hand-entered Irish lines | Basic free; Pro £35 / month | Free and paid | Pages describe MCS and DNO forms; Ireland not named |
| OpenSolar | Free quoting with a custom grant line | Core app free of charge; API Access and connectors charged from 16 April 2026 | Free core app, paid API and connectors | Fixed and size-based incentive types documented; no SEAI incentive named |
| Sunbase | SEAI grant and VAT in the quote | From $59 per user per month | Paid | Blog says SEAI grant and VAT rules are built into the quote |
| SurgePV | Roof model to BOM and proposal, per user | $1,899 per user per year (1 user), in US dollars | Paid, guided demo | BOM and proposal generation in scope; no Irish item stated |
Ireland Criteria Matrix
Each cell is Documented, Partial or Not stated. Documented means the vendor’s own page states it. Partial means the page states a related feature but not the full item. Not stated means the pages we read in October 2026 do not say. There are no scores or weights.
| Tool | SEAI grant line | VAT treatment | Clean Export Guarantee rate | ESB Networks form | Euro price | Free tier |
|---|---|---|---|---|---|---|
| Aurora Solar | Not stated | Not stated | Not stated | Not stated | Not published (dollars) | Not stated |
| Easy PV | Not stated | Not stated | Not stated | Not stated (DNO forms described) | Not published (GBP) | Documented (Basic) |
| OpenSolar | Partial (custom incentives, no SEAI type named) | Partial (help centre documents VAT and tax settings, mostly in UK articles; Irish zero rate not named) | Not stated | Not stated | Documented (core app free; API Access and connectors charged from 16 April 2026) | Documented |
| Sunbase | Documented (blog, grant amount not itemised) | Documented (blog) | Not stated | Not stated | Not published (dollars) | Not stated |
| SurgePV | Not stated | Not stated | Not stated | Not stated | Not published (USD) | Not stated |
Two things stand out. No vendor page we read states a Clean Export Guarantee rate library or an ESB Networks form, and none publishes a euro price. A tool that does not state these items may still support them, so ask each vendor to quote one real Irish job before you buy.
Tool Entries
Aurora Solar
Best for: teams already on Aurora that want its design and proposal platform and will add Irish lines by hand.
Not the right choice if: you want a documented SEAI, VAT or export-payment workflow, or a euro price (none appears on the pages we read).
What the vendor documents: its Europe page describes design, proposals and 3D models for European solar teams and says projects have been designed in 150+ countries. Its UK page describes MCS-compliant proposals and automated electrical diagrams. The pricing page lists North America and Europe regions.
Price (checked October 2026): Basic $159 per user per month billed monthly, or $135 per user per month billed annually ($1,620 billed annually); Premium $259 per user per month, or $220 billed annually ($2,640 billed annually). Enterprise is custom, per project. The page shows dollars and does not name the currency.
Limitations: the Europe and UK pages do not name Ireland or SEAI.
Vendor link: aurorasolar.com.

Easy PV
Best for: installers who want a free design and customer proposal tool and are comfortable entering the Irish grant, VAT and ESB Networks items themselves.
Not the right choice if: you need a documented SEAI, VAT or Clean Export Guarantee workflow. Its pages describe MCS-compliant self-consumption modelling and automated DNO forms, which are UK items, and do not name Ireland.
What the vendor documents: on its pricing page, the free Basic plan lists 2D and 3D roof design, performance calculations, self-consumption estimation and financial projections. It also lists a project pricing calculator, a customer proposal and payment options. Pro adds team management, CRM integration, e-signing and proposal branding. The software comes from Midsummer, which also runs a trade account.
Price (checked October 2026): Basic free; Pro £35 / month as shown on the page; Enterprise by quote. The page does not say whether the Pro figure is billed monthly or annually.
Limitations: no euro price, no Irish form or grant item stated.
Vendor link: easy-pv.co.uk.

OpenSolar
Best for: installers who want a free core app for quoting and will set up the SEAI grant as a custom incentive.
Not the right choice if: you need a built-in SEAI type, an Irish zero-rate VAT rule or an Irish export-payment field (none is named on the pages we read). The help centre does document VAT override settings in its UK articles.
What the vendor documents: its help centre article How to set up Incentives lists Fixed, Size Based, Price Based and Performance Based incentive types. A size-based incentive takes a value per unit of PV capacity and an optional cap amount. The incentive can be paid to the customer or the installer. The country-specific types it names are for the US and Australia only. Whether the SEAI two-band formula fits one size-based entry is not stated.
Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access, a per-project fee, and for supported connectors, a monthly fee per organization. The per-project API fee is on OpenSolar’s API page. API Access lets other software connect to OpenSolar. The 16 February 2026 post says accounting connectors are billed as a monthly fee per organization. Optional paid Enterprise Services: Support US$500 per month, Customize US$1,350 per month, Enterprise custom. Premium imagery is pay per image (price shown in the app).
Limitations: the grant, VAT and export lines are yours to set up and keep current.
Vendor link: opensolar.com.

Sunbase
Best for: installers who want the SEAI grant and VAT rules built into a proposal and also need CRM and project management on one platform.
Not the right choice if: you want a published euro price or a fixed plan list. The pricing page says plans start from $59 per user per month, with the total set by users, modules and workflows.
What the vendor documents: its blog post for Irish installers (2 April 2025) says its proposal software builds SEAI grant calculations and VAT rules directly into the quote. It also says the platform runs proposals, CRM, design and project management together. Its solar proposal page lists PV design, shading, energy production, bill of materials, pricing and financing, and savings and cash-flow sections, without naming Ireland.
Price (checked October 2026): from $59 per user per month, as the pricing page states. The page does not name the currency.
Limitations: the blog does not say how the grant is itemised, so test a 2.5 kWp quote against the SEAI figure below. It does not mention Clean Export Guarantee rates or ESB Networks forms.
Vendor link: sunbasedata.com.

SurgePV
SurgePV is our product.
Best for: teams that want roof modeling, shading, yield, financial modeling, bill of materials and proposals in one product, priced per user. They will confirm the Irish lines in a demo.
Not the right choice if: you want a self-serve trial (SurgePV offers a guided demo). It is also not right if you need a euro price in writing before talking to sales (the pricing page lists US dollars; confirm taxes in a quote). Skip it too if you need a documented SEAI and VAT workflow today (Sunbase’s blog states one). Outputs support design and documentation. They do not replace approval by the responsible engineer, authority, lender or utility. SurgePV’s published product scope does not list a CRM. Monitoring and ERP are outside its published scope.
What the vendor documents: 3D roof modeling, array layout, shading analysis and energy-yield modeling. It also lists financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar proposal software for the product page.
Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars.
Limitations: results depend on source data, assumptions and equipment models. The pricing page and published scope do not state an SEAI grant line, zero-rate VAT, Clean Export Guarantee rates or ESB Networks forms.
Vendor link: surgepv.com.

Ireland Rules That Shape the Choice
The SEAI grant is banded, not flat. SEAI’s Solar Electricity Grant page gives €700 per kWp up to 2 kWp and €200 for every additional kWp up to 4 kWp, capped at €1,800. There is a separate €600 battery grant (€2,400 maximum together). A 2.5 kWp system gets 2 × €700 + 0.5 × €200 = €1,500, which matches SEAI’s own example, and a 4 kWp system gets 2 × €700 + 2 × €200 = €1,800. The Enhanced Solar PV grant is for homeowners receiving a qualifying social protection payment. It is €3,350 per kWp up to 2 kWp and €850 per additional kWp up to 4 kWp. So 3 kWp is 2 × €3,350 + €850 = €7,550, capped at €8,400 (€9,000 with a battery). The home needs an MPRN, must have been built and occupied before 2025 and must not have had earlier solar PV funding at that MPRN. You apply and receive a letter of offer before works start, then have 8 months to finish, and a post-works BER is required before payment.
VAT is zero for private dwellings only. Revenue’s Tax and Duty Manual says that from 1 May 2023 the zero rate applies to the supply and installation of solar panels on or adjacent to private dwellings. It says the zero rate does not apply to commercial, industrial, farm or most public buildings. Its solar panels page (published 16 March 2026) says the zero or reduced rate may apply under a supply and install contract. A proposal tool needs a tax setting per project, not one rate for the account.
Export payment comes from the supplier. The Commission for Regulation of Utilities microgeneration page says the supplier pays for every metered kWh exported over the billing cycle. The bill shows this as a rate in euro per kWh. The arrangements were published by the Commission in June 2024. The page gives no rate, so a proposal needs the customer’s supplier rate as an input.
The ESB Networks form depends on size. The same page says a system under 6 kW single phase or 11 kW three phase uses the NC6 form. A larger one up to 50 kW uses the NC7 form. These are the forms that report a new system to ESB Networks. ESB Networks’ micro-generation page says there is no connection charge for systems that fit the inform-and-fit route, up to 6 kVA single phase or 11 kVA three phase. SEAI says the installer applies to ESB Networks before installing and that this usually takes at least 4 weeks or 20 working days.
Regulator pointer. SEAI (seai.ie) runs the grant and requires an SEAI registered company for the installation. Our Ireland compliance guide covers the wider installer rules.
How We Ordered These Tools
SurgePV publishes this page and is a vendor on this list. Its entry uses the same vendor-page sources and template as every other tool here.
We did not rank these tools. They are listed alphabetically, and the best-for picks come from the matrix above.
- SEAI grant line: the grant is the first number an Irish homeowner asks about. We did not assess whether any tool applies the two bands correctly.
- VAT treatment: zero rate for dwellings and a different treatment for other buildings changes the price shown. We did not assess how any tool handles a mixed job.
- Clean Export Guarantee rate: export income changes payback, and the rate comes from each supplier. We did not assess how any tool models export.
- ESB Networks form: the form depends on system size. We did not assess whether any tool flags the size threshold.
- Price currency: a euro price shows what an Irish buyer will pay. We did not assess discounts or negotiated quotes.
- Free tier: a free plan lets a small team test the workflow. We did not assess the limits of any free plan beyond what its page states.
Sources and Dates
Vendor pages were read in October 2026. They are Aurora (pricing, Europe and UK pages), Easy PV (pricing), OpenSolar (free and the help centre article above), Sunbase (pricing and the blog post above) and SurgePV (pricing). Government sources: SEAI, Revenue, the Commission for Regulation of Utilities and ESB Networks pages linked above. Help-centre articles were read in a browser.
See SurgePV on your Ireland project
Book a guided demo and ask for the Irish lines you need in the proposal.
Book a Free DemoMore Solar Software Guides to Compare
- Best solar software in Ireland
- Solar design software for Ireland
- Solar proposal software for the UK and France, the nearest country lists
- Best solar proposal software, all markets
Frequently Asked Questions
What is the best solar proposal software in Ireland?
It depends on what the quote must show. From what the vendors publish, Sunbase is the one whose own blog says it builds SEAI grant calculations and VAT rules into the quote. OpenSolar’s core app and Easy PV’s Basic plan are free. Aurora and SurgePV publish nothing Irish on the pages we read. No tool here states Clean Export Guarantee or ESB Networks handling, so ask each vendor to quote one real Irish job.
Is there free solar proposal software for Irish installers?
OpenSolar says its core app is free for solar professionals. It charges for API Access and supported connectors from 16 April 2026. Its help centre documents custom fixed and size-based incentives you can use for a grant line. Easy PV lists a free Basic plan that includes a customer proposal and payment options, but its pages describe UK items such as MCS and DNO forms and do not name Ireland. Both are free to try, and neither states SEAI handling on the pages we read.
Does proposal software calculate the SEAI grant?
Sunbase says its proposal software builds SEAI grant calculations into the quote, though it does not say whether the two-band formula is modelled. The SEAI grant is 700 euro per kWp up to 2 kWp plus 200 euro for each extra kWp up to 4 kWp, capped at 1,800 euro, so a 2.5 kWp system gets 1,500 euro. Check that your proposal shows the line correctly.
How should an Irish quote treat VAT?
Revenue’s guidance says the zero rate has applied since 1 May 2023 to the supply and installation of solar panels on private dwellings under a supply and install contract. It does not apply to commercial, industrial or farm buildings. A tool with one tax field for every project will need manual edits on mixed domestic and commercial work.
What export payment should a solar proposal show in Ireland?
Under the Clean Export Guarantee your electricity supplier pays you for each metered kWh you export, and your bill shows the rate in euro per kWh. The Commission for Regulation of Utilities page we read gives no rate, so the proposal needs the customer’s supplier rate as an input. None of the five vendors states a supplier rate library on the pages we read.
How much does solar proposal software cost in Ireland?
No vendor here publishes a euro price. OpenSolar’s core app is free. The vendor charges for API Access and supported connectors from 16 April 2026. Easy PV lists a free Basic plan and Pro at 35 pounds a month. Sunbase says plans start from 59 dollars per user per month. Aurora lists 159 dollars per user per month for Basic. SurgePV lists 1,899 US dollars per user per year for one user. Ask for a written euro quote with VAT shown.


